My WebLink
|
Help
|
About
|
Sign Out
Home
2024-11-21 Written Testimony Pacific Rim Land Inc.
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-02-24 Leeward Continuance of Special General Plan Meeting
>
2024-11-21 Leeward Special General Plan Meeting - Introduction & Overview
>
LPC Testimony 10/1- 11/21
>
2024-11-21 Written Testimony Pacific Rim Land Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 11:36:33 AM
Creation date
2/21/2025 11:10:16 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
11/19/2024
Description
Written testimony given at LPC 11-21-24 hearing from Pacific Rim Land Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
date of completion of the proposed quarrying;or its abandonment, whichever <br /> comes first. <br /> m. An adequate supply of water shall be made available for dust control and for fire <br /> prevention and pre-suppression. <br /> n. Comply with all other laws,rules,regulations and requirements, including those <br /> of the Department of Health,Hawaii Electric Light Company,and the Department <br /> of Public Works. <br /> o. An annual monitoring report shall be submitted to the Planning Director and Land <br /> Use Commission prior to the anniversary date of the approval of this permit. The <br /> report shall include,but not be limited to,the amount of material quarried, a <br /> detailed listing of public complaints or problems and their disposition. Should a <br /> conflict arise,which cannot be mitigated or mediated,the quarry operations shall <br /> cease upon appropriate findings by the Planning Commission that the introduced <br /> use will have an adverse impact on surrounding properties. The report shall also <br /> include Applicant's progress in complying with the conditions imposed. <br /> p. An extension of time for the performance of conditions within the permit,with the <br /> exception of Condition No. 12,may be granted by the Planning Director upon the <br /> following circumstances: a)the non-performance is the result of conditions that <br /> could not have been foreseen or are beyond the control of the applicant, <br /> successors or assigns, and that are not the result of their fault or negligence;b) <br /> granting of the time extension would not be contrary to the general plan or zoning <br /> code; c)granting of the time extension would not be contrary to the original <br /> 12 <br /> SP92-381 Waikoloa Development Company <br /> Decision And Order on Motion to Amend <br />
The URL can be used to link to this page
Your browser does not support the video tag.