My WebLink
|
Help
|
About
|
Sign Out
Home
2024-11-20 Noah Walin, Pacific Rim Land, Inc.
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-02-24 Leeward Continuance of Special General Plan Meeting
>
2024-11-22 Leeward Continuance of Special General Plan Meeting - Biocultural/Climate Change
>
2024-11-21 Leeward Special General Plan Meeting
>
LPC Testimony 10/1- 11/20
>
2024-11-20 Noah Walin, Pacific Rim Land, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 1:47:25 PM
Creation date
2/21/2025 11:10:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
date of completion of the proposed quarrying; or its abandomnent, whichever <br /> comes first. <br /> in. An adequate supply of water shall be made available for dust control and for fire <br /> prevention and pre-suppression. <br /> n. Comply with all other laws, rules, regulations and requirements, including those <br /> of the Department of Health, Hawaii Electric Light Company, and the Department <br /> of Public Works. <br /> o. An annual monitoring report shall be submitted to the Planning Director and Land <br /> Use Commission prior to the anniversary date of the approval of this permit. The <br /> report shall include, but not be limited to, the amount of material quarried, a <br /> detailed listing of public complaints or problems and their disposition. Should a <br /> conflict arise, which cannot be mitigated or mediated,the quarry operations shall <br /> cease upon appropriate findings by the Planning Commission that the introduced <br /> use will have an adverse impact on surrounding properties. The report shall also <br /> include Applicant's progress in complying with the conditions imposed. <br /> p. An extension of time for the performance of conditions within the permit,with the <br /> exception of Condition No. 12,may be granted by the Planning Director upon the <br /> following circumstances: a)the non-performance is the result of conditions that <br /> could not have been foreseen or are beyond the control of the applicant, <br /> successors or assigns, and that are not the result of their fault or negligence; b) <br /> granting of the time extension would not be contrary to the general plan or zoning <br /> code; c) granting of the time extension would not be contrary to the original <br /> 12 <br /> SP92-381 Wailcoloa Development Company <br /> Decision And Order on Motion to Amend <br />
The URL can be used to link to this page
Your browser does not support the video tag.