My WebLink
|
Help
|
About
|
Sign Out
Home
2003-11-20 Veteran Advisory Committee Minutes
PublicDocuments
>
Parks and Recreation
>
Veteran Advisory Committee
>
Minutes
>
2003-2010
>
2003
>
2003-11-20 Veteran Advisory Committee Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2011 8:12:18 AM
Creation date
6/16/2011 8:39:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veterans Advisory Committee <br />Page 2 <br />November 20, 2003 <br />STATEMENTS FROM THE PUBLIC <br />No public statements made. <br />Previous Meeting Minutes — September 18, 2003 <br />• The Minutes for the October 16, 2003 meeting were approved with one correction <br />made by Vice Chairman Denny Austen. On Page 5, Under Announcements: <br />Veterans Day Ceremonies; North Kohala — Barbara Austen was not the guest speaker, <br />she introduced guest speaker — Dr. Jamal Wasan, Retired Colonel. <br />STATE VETERANS ADVISORY BOARD — REPORT <br />Mr. Delbert Nishimoto, Big Island representative on the State Veterans Advisory Board <br />reported the following: <br />Veterans Cemetery II, Phase II Expansion Proiect <br />Date of Notice to proceed on project is November 17, 2003 with 180 working days <br />allotted. The General contractor is GW Construction and the Project Coordinator and <br />Manager is M & E Pacific. <br />Veterans Cemetery III, West Hawaii <br />Attempted to schedule a meeting with West Hawaii Veterans, OVS Director, <br />Department of Defense Hawaii Engineer Major Neal Mitsuyoshi and a P &R <br />representative. However, that meeting will be at a later time. Currently OVS has met <br />with M & E Pacific and they are in the process of redesigning master plan in accordance <br />with VA guidance on approved scope of work. The total construction cost at this stage <br />cannot exceed 1 million dollars. The project will be phased within a period of two years, <br />whereby, $100,000 per phase will be allocated. When it is returned to OVS and DOD, <br />they will seek input for prioritization of project phases from Big Island Veterans and <br />most especially the West Hawaii representatives and P &R. <br />Richard Highly asked if the $1 million funding for West Hawaii Cemetery is not spent in <br />the next two years, would it remain towards the cemetery or will it be lost. <br />Chairman Kaoiwi responded that funds would lapse and be lost. He recommended that <br />West Hawaii veterans communicate with OVS. <br />Richard Highly said they will write a letter requesting an expected date of completion for <br />revisions. <br />Patrick Pavao asked Mr. Nishimoto to request a timeline from OVS to be presented at the <br />next meeting. <br />Office of Veterans Services (OVS) <br />OVS Director General Cockett may be ending his term in December. <br />
The URL can be used to link to this page
Your browser does not support the video tag.