My WebLink
|
Help
|
About
|
Sign Out
Home
2024-12-03 Noah Walin, Pacific Rim Land Inc. Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-03-10 - Windward Continuance of Special General Plan Meeting
>
2024-12-05 Windward Continuance of Special General Plan Meeting
>
11-04-24 thru 12-04-24 Additional Individual Testimonies
>
2024-12-03 Noah Walin, Pacific Rim Land Inc. Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 11:30:18 AM
Creation date
2/26/2025 10:28:22 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
12/3/2024
Description
GP testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
quarry operation shall be submitted a minimum of forty-five days prior to the date <br /> by which plan approval must be secured. Plans shall identify structures and <br /> parking associated with the proposed quarry operations. <br /> c. The quarry operations and related activities shall commence on or before <br /> December 10, 2003. A letter informing of commencement of operations shall be <br /> submitted to the Planning Department. <br /> d. A metes and bounds description and map shall be submitted with plans for plan <br /> approval review. The area described shall contain less than 220 acres and the <br /> operation confined within the described area. <br /> e. [Aeees-s once the WaikoloaRoud ftom the project site, ineluding the provision oadequate sigh4 distanee, shall meet with the approval of the Departmen4 of Pub! <br /> Wofks prior-to final plan approval. Should additional intefseetion improvemefils <br /> stieh . .,ha el;z.,+;9nbe required by the Department of Publie Works during th-c <br /> life VF the permit, J4LV1 11J1VYVm s shall be provided ; , timely ,,mer-by+ho <br /> „1;,ant at no st t the Count„ fHawaii-.] At the written request of the <br /> Department of Public Works (DPW), after the fifth anniversary of the issuance of <br /> the extended permit,the Applicant shall prepare a Traffic Impact Analysis Report <br /> (TIAR), at no cost to the County of Hawai'i, for submission to the DPW. The <br /> applicant shall coordinate with the DPW on implementing the Applicant's pro-rata <br /> share of appropriate traffic mitigation measures, if any, should it be determined <br /> through the TIAR that improvements to the Waikoloa/Quarry road intersection <br /> 9 <br /> SP92-381 Waikoloa Development Company <br /> Decision And Order on Motion to Amend <br />
The URL can be used to link to this page
Your browser does not support the video tag.