My WebLink
|
Help
|
About
|
Sign Out
Home
2025-05-12 Steve Poludniak Kazi Group of Companies Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-05-15 - Leeward
>
Item #1 Boaz LLC (PL-SMA-2025-000072)
>
2025-05-12 Steve Poludniak Kazi Group of Companies Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 8:05:29 AM
Creation date
5/13/2025 8:05:28 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
5/12/2025
Permit Number
PL-SMA-2025-000072
Parcel Number
750200210000
Description
Email testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13. How will you handle the removal or addition of existing infrastructure (e.g., <br /> sidewalks, curbs)that may impact the Location? <br /> 14. Are there any plans to change traffic flow patterns near the Location? <br /> 15. Will any temporary structures (e.g., barriers, fences) potentially block the Location, <br /> the All'i road or entrances or exits to the Location? <br /> 16.Will there be interruptions to utility services (e.g., water, electricity, internet) that <br /> could disrupt the Location? <br /> 17. How will the County of Hawaii manage traffic flow during peak business hours to <br /> prevent congestion around the Location? <br /> 18. What steps will be taken to ensure the safety of the residents of the Location during <br /> construction? <br /> 19. Who, by name, title, phone and email are the responsible parties controlling the <br /> construction site? <br /> 20. Who, by name, title, phone and email are the responsible parties of the construction <br /> site for the County of Hawaii? Is this who we can request information, make comments <br /> or complaints and obtain weekly schedules? <br /> 21. Will there be any disruptions to delivery services for residents at or near the <br /> Location? <br /> 22. Are there any environmental issues that the residents of the Location need to be <br /> concerned about with the construction? <br /> 23. How will the County of Hawaii communicate progress updates and potential <br /> disruptions with the residents at the Location during and or due to construction? <br /> 24. Will residents at the Location have beach access across the construction site during <br /> construction? Will resdents be offered transportation to other beach access sites if the <br /> construction site is closed during construction? <br /> 25.Are there plans to improve accessibility or pedestrian walkways around the <br /> construction site? <br /> Thankyou for answering these questions at the hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.