My WebLink
|
Help
|
About
|
Sign Out
Home
2023-09-08 PL-INT-2023-005229 FINAL EA for Bayfront Hwy and Waianuenue Ave Intersection
PublicDocuments
>
Planning Department
>
Cultural Resources Commission
>
Materials
>
2025
>
2025-06-18
>
Wailuku Bridge Rehabilitation (PL-CRC-2025-000024)
>
2023-09-08 PL-INT-2023-005229 FINAL EA for Bayfront Hwy and Waianuenue Ave Intersection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 4:16:40 PM
Creation date
5/29/2025 1:06:42 PM
Metadata
Fields
Template:
Plan Doc Template
Document Date
9/8/2023
Related Permits
PL-INT-2023-005229
Other Parcel Numbers
230029990000, 230030030000, 230039990000, 230059990000
Parcel Number
230020220000
Description
PBR HAWAII & ASSOCIATES INC, STATE DOT- FINAL EA FOR BAYFRONT HIGHWAY AND WAIANUENUE AVE INTERSECTION IMPROVEMENTS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
795
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agency address <br /> 869 Punchbowl Street <br /> Honolulu, Hawaii 96813 <br /> United States <br /> Map It <br /> Was this submittal prepared by a consultant? <br /> Yes <br /> Consultant <br /> PBR HAWAII &Associates, Inc. <br /> Consultant contact name <br /> Dave Simpson <br /> Consultant contact email <br /> dsimpson@pbrhawaii.com <br /> Consultant contact phone <br /> (808)521-5631 <br /> Consultant address <br /> 1001 Bishop Street, Suite 650 <br /> Honolulu, Hawaii 96813 <br /> United States <br /> Map It <br /> Action summary <br /> The proposed project includes improvements to the intersection of Bayfront Highway(Route 19)and <br /> Waianuenue Avenue (Route 1950)to enhance multimodal connectivity and address ongoing concerns <br /> involving poor vehicular maneuverability, restricted access to the downtown Hilo area, pedestrian safety <br /> concerns, and overall congestion of roadways in the vicinity.A preferred alternative has been identified <br /> which includes reconstruction of roadways to allow for construction of an intersection single-lane <br /> roundabout,ADA compliant sidewalks and roadway crossings, drainage improvements, reconfiguration <br /> of parking, and other roadway improvements including new highway lighting, electrical infrastructure <br /> relocations, signage, pavement markings, pedestrian signals, raised crosswalks, landscape, and traffic <br /> management devices, and other utility adjustments as required. To minimize traffic impacts during <br /> construction,the project will include both day and night work. <br /> Reasons supporting determination <br /> Refer to Section 7.1 of the FEA. <br /> Attached documents(signed agency letter&EA/EIS) <br /> • Bayfront-Waianuenue-FEA-Transmittal-Letter.pdf <br /> • Bayfront-Waianuenue-FEA-September-2023.pdf <br /> Shapefile <br /> • The location map for this Final EA is the same as the location map for the associated Draft EA. <br /> Action location map <br /> • Project-Ste-APE.zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.