My WebLink
|
Help
|
About
|
Sign Out
Home
2005-10-25 Water Board Agenda
PublicDocuments
>
Water Supply, Department of
>
Water Board
>
Agendas
>
2003 - 2005
>
2005
>
2005-10-25 Water Board Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2011 8:26:50 AM
Creation date
6/16/2011 9:15:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF WATER SUPPLY <br />COUNTY OF HAWAII <br />WATER BOARD MEETING <br />AGENDA <br />MEETING DATE: October 25, 2005 <br />PLACE: Hilo Operations Center Conference Room; 889 Leilani Street, Hilo, Hawaii <br />TIME: 10:00 a.m. <br />1) CALL TO ORDER - 10:00 a.m. <br />2) STATEMENTS FROM THE PUBLIC <br />3) APPROVAL OF MINUTES - Minutes of the September 27, 2005, Water Board Meeting <br />4) APPROVAL OF ADDENDUM AND /OR SUPPLEMENTAL AGENDA (if necessary) <br />(Note: Addendum requires Roll Call Vote) <br />5) NORTH KONA: <br />A. JOB NO. 2001-785, CONSTRUCTION OF THE WAIAHA PRODUCTION WELL <br />AND 2.0 MG RESERVOIR: <br />Attached is a copy of a letter dated October 11, 2005, from Isemoto Contracting Company, <br />Ltd., requesting an extension of contract time. The contractor is requesting a 28- calendar day <br />extension to allow for the late delivery of the gas detection control panel. The supplier had <br />originally planned to ship the control panel to our contractor on September 23, 2005. <br />However, due to the damage caused by Hurricane Rita to the production facility, the shipping <br />date was postponed until October 21, 2005, a total of 28 calendar days. <br />This is the contractor's third time extension request. Staff has evaluated this request and <br />finds that the 28- calendar day extension is justified. <br />RECOMMENDATION: It is recommended that the Board grant Isemoto Contracting <br />Company, Ltd., a 28- calendar day extension for JOB NO. 2001 -785, CONSTRUCTION OF <br />THE WAIAHA PRODUCTION WELL AND 2.0 MG RESERVOIR, from November 2, <br />2005, to November 30, 2005. <br />6) MISCELLANEOUS: <br />A. DEDICATION OF WATER SYSTEMS: <br />The Department received the following documents for action by the Water Board. The water <br />systems have been constructed in accordance with the Department's standards and are in <br />acceptable condition for dedication. <br />Page 1 of 5 10 -25 -05 Agenda.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.