Laserfiche WebLink
4. Recent Developments (Post SMA Application Submission) <br /> a. No longer primary residence: As of mid-August 2025,we have been informed by the owners that they are <br /> moving to California (mid-September, 2025). <br /> i. They also communicated they intend use the "farm dwelling"when built as a vacation home. <br /> However, the SMA application specifies that this home would serve as the applicant's primary <br /> residence. <br /> ii. That they intend to build the commercial agriculture building first. <br /> b. A massive 20x20x20ft tent structure was erected within 10 feet of the pali. The same shed described in <br /> #3.d above. This structure was erected in June 2025 (after the submission of this SMA Application)very <br /> close to the pali. Huge industrial shelving systems were installed to store personal property. This gray tarp <br /> monstrosity dominates the coastal view in that area. Hau trees were cut back to make room for it. It is <br /> certainly within the 40 foot setback and possibly within designated conservation land. <br /> a�t <br /> o:e <br /> Figure 11—POST SMA Application Shed Near Pali <br /> c. In August 2025, a 40 foot container was delivered and situated/located on the exact location of the <br /> proposed Farm Dwelling. The location of the container would suggest that the applicant does not plan to <br /> build the farm dwelling first. <br /> .K. <br /> J.0 <br /> Figure 12—POST SMA Application Container on Farm Dwelling Site <br />