My WebLink
|
Help
|
About
|
Sign Out
Home
2004-04-27 Water Board Minutes
PublicDocuments
>
Water Supply, Department of
>
Water Board
>
Minutes
>
2003 - 2005
>
2004
>
2004-04-27 Water Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2011 8:16:13 AM
Creation date
6/16/2011 11:20:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Nitsche replied that they would be happy to do the whole project or work with the County, <br />whatever they can do to help. They realize that the Department is busy already, but they want to <br />get water to Ocean View as soon as possible. <br />Mr. Heck supported that by stating that the Board recognizes the Department just does not have the <br />personnel to effectively do things sometimes and appreciated the community's willingness to help. <br />Mr. Nitsche clarified that they are not asking for the County to just hand over the remaining <br />$250,000.00 from the initial $500,000.00. Those purse strings could be held by the County and <br />given out to them as they request, but he asked for some leeway. They were that confident in the <br />community in 1998 to do the well - -they hired Mr. Bowles and were going to oversee the well <br />going in-- hopefully, they will still have confidence in them. He felt they could do it quicker and at <br />a lesser cost. <br />Ms. Scarr referred once again to Mr. Dennis Lee's presentation on the alternatives for Wai`ohinu <br />and transmission lines and was struck, in the Townscape report, by the options there are to think <br />about extending the Department's current systems versus drilling more stand -alone wells as an <br />option. She is not entirely clear on what the desirability is of phasing in stand -alone wells or <br />phasing in connections. She felt the Board needs to think about that set of alternatives. She asked <br />if Mr. Lee would be willing to make a brief summary of what he had to say on that. <br />Mr. Lee state that when he was asked to look at the alternatives in bringing water to Ocean View <br />and neighboring communities, he looked the end of the system, which is South Point. South Point <br />is actually connected to the main system, which is Wai`ohinu/Na`alehu system. The source at <br />Wai`ohinu, which feeds South Point, is a groundwater source under the direct influence of surface <br />water. Based on that classification, the Environmental Protection Agency says the Department <br />needs to either treat the water by conventional methods or replace it with a well. After looking at <br />the cost of treatment versus establishing a new well and the dependency factors of the surface <br />source (drought), the decision was made to replace the spring source with a well. Looking at the <br />situation with the existing pipeline from Wai`ohinu to South Point and the condition of the pipeline <br />as well as the pipeline materials, the decision was that the Department needed to also replace the <br />pipeline. The project called for not only well development, but also called for the replacement of a <br />transmission line from Wai`ohinu to South Point. <br />In response to Ms. Scarr's question if the transmission replacement project is on the C.I.P. list, <br />Mr. Lee replied it is not. It was part of phasing in. The first thing the Department needed to do <br />was the Wai`ohinu well and reservoir. The transmission line is the second phase. In doing that, <br />staff also took into consideration the needs of Hawaiian Ocean View Estates and surrounding <br />communities. One of the concerns was that they needed to have a water point established - -one <br />large enough to take care of at least three vehicles at a time. In the plan, they included a sufficient <br />or adequate water point such that it could handle the demand for water hauling. The situation in <br />Wai`ohinu at the present time is if there is a drought or the supply is low, the Department would <br />stop all water haulers and send them to Pahala. That is the reason why they looked at not only <br />EPA compliance requirements, but also looked at the drought situations and how it impacted water <br />hauling to Hawaiian Ocean View Estates. Also in that second phase was not only establishing a <br />pipeline from Wai`ohinu to South Point, but also establishing a water point at South Point. That <br />Page 10 of 25 4- 27 -04min (Ocean View).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.