Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2025-2026 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> A.TOTAL B.VV1TH CURRENT FIRM <br /> Haley Cremer Environmental Planner 3 2 <br /> 15.FIRM NAME AND LOCATION(City and State) AECOM Technical Services, Inc.(Honolulu, Hawaii) <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> MS, Natural Resources and Environmental Management(Expected 2026) <br /> BS, Natural Resources and Environmental Management <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Haley Cremer is an Environmental Planner in AECOM's Environmental Planning and Permitting department,based in Honolulu, Hawaii. Her <br /> experience includes environmental permitting and compliance(supporting NEPA and HRS Chapter 343 documents),technical writing,and <br /> developing GIS-based graphics. Haley's academic and professional experience working in natural resource management allow her to bring a <br /> multi-disciplinary approach to projects that address environmental impacts. Her portfolio includes a range of support for state and federal projects <br /> in the Hawaii-Pacific region. <br /> Certification-Certificate of Land Use and Environmental Planning <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) See Project#4 in Section F (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation (HDOT), Bayfront Intersection PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Improvements (Hawaii Island, HI) 2023-Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Environmental Planner.The primary purpose of the project is to address traffic congestion at the Hilo Bayfront Highway intersection with <br /> Waianuenue Avenue caused by Highway closures due to flooding south of the intersection.The secondary purpose is to provide pedestrian <br /> accessibility and safety improvements. <br /> „„„b.„����,, (1)TITLE AND LOCATION(City and State See Project#4 in Section F (2)YEAR COMPLETED <br /> Hawaii State Parks System-wide Design Guidelines with Concepts and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Construction Drawings for Accessible Campsite Improvements (Statewide, HI) 2023-Ongoing 2025-2026(est.) <br /> (3)bhll=h LiLSchlH I IJIv ictnet scope.size.cost. .,7L,Il rVJLE Q Check if project performed with current firm <br /> Environmental Planner and GIS Technician supporting system-wide design guidelines and standards for Hawaii State Parks campgrounds. <br /> Support guidelines,site visits,and project coordination.This multi-phase project will develop concept designs for ADA access and related <br /> improvements for campsites and develop design guidelines and standards for future implementation across Hawaii State Parks campgrounds. <br /> c. (1)TITLE AND LOCATION(City and State' See Project#2 in Section F (2)YEAR COMPLETED <br /> Lahaina Historic Building Restoration Master Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Lahaina, HI) Ongoing N/A <br /> (.i)iKitr utSCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Environmental Planner and GIS Technician supporting a master planning process and concept development for historic building reconstruction <br /> prioritization. Master planning study to initiate the reconstruction of eight historic buildings destroyed by the August 2023 wildfire.The planning <br /> process included creation of a"roadmap"for efficient building restoration, including workshops to refine building layouts,concept plans,permitting <br /> matrices,schedule and budget estimates,and agency pre-consultations. <br /> d. (1)TITLE AND LOCATION(City and State) See Project#3 in Section F (2)YEAR COMPLETED <br /> Kamehameha Highway Shoreline Erosion and Mitigation in Kualoa,Kaaawa, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Punaluu, Hauula, KKPH Environmental Assessment(Oahu, HI) Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Environmental Planner and GIS Technician supporting in drafting consultation letters for multiple state and county environmental permits. <br /> Produced figure package for Draft KKPH Environmental Assessment.The Kamehameha Highway Shoreline Erosion Mitigation in Kualoa, <br /> Ka'a'awa, Punalu'u,and Hau'ula Project would mitigate coastal erosion along nine discrete sections of the highway that the Hawaii Department of <br /> Transportation has identified as needing action to maintain the usability of the highway in the near to mid-term, until a long-term plan to deal with <br /> the effects of sea level rise can be developed and implemented. <br /> e. (1)TITLE AND LOCATION(City and State) See Project#7 in Section F (2)YEAR COMPLETED <br /> Inventory of the Oahu Railway and Land(OR&L)Company Right-of-Way(ROW) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Honolulu, HI) 2024 N/A <br /> utoCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Environmental Planner,Research Support,and Field Survey Team.Inventory of historic,extant character-defining features of the OR&L ROW <br /> for the National Register of Historic Places. Compiled historical and archival data,drafted sections of social and historical report,and executed <br /> field work,data collection,data processing,and graphic generation. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 15 <br />