Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> 24. NAMES OF KEY 25. ROLE IN 26. EXAMPLE PROJECTS LISTED IN SECTION F <br /> PERSONNEL EXAMPLE (Fill in "Example Projects Key" section below before completing table. Place "X" <br /> (From Section E, PROJECT under project key number for participation in same or similar role.) <br /> Block 11) 1 2 3 4 5 6 7 8 9 10 <br /> Ken Kawahara Principal PM Z ❑ Z Z Z ❑ Z Z ❑ ❑ <br /> Scott Kunioka Project Manager ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Gavin Ganal Project Engineer Z ❑ Z ❑ Z Z Z ❑ Z ❑ <br /> Austin Inouye Junior Engineer DOODOZOODO <br /> Kevin Meagher Junior Engineer ❑ ® ❑ ❑ ❑ ® ❑ ❑ ❑ ❑ <br /> W. Roy Hardy Senior Project ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Engineer <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 27. EXAMPLE PROJECTS KEY <br /> NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) <br /> 1 Waimea District Park 6 Accessibility Improvement Projects <br /> 2 Laiopua Village 4 HEMA 7 Galbraith 3.0 & 10.0 MG Reservoirs <br /> 3Kunnuhau <br /> Subdivision Moiliili-Kapahulu Sewer Rehab <br /> 4 Makani Pilot Project 9 Kapaa-Kealia Bike & Pedestrian Path <br /> 5 Hanapepe Pipline 10 Laiopua Village 5 Subdivision <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 20 <br />