Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025-06-13 PL-INT-2025-010798 Akinaka & Associates, LTD. - Category PL.5
DeVera, Ashley From: Darnelle Chung <djc@akinaka.com> Sent: Friday, June 13, 2025 7:18 AM To: Planning Internet Mail Subject: County of Hawaii, Planning Department Attachments: Akinaka and Associates_Planning Department.pdf Aloha, Please find attached our company's submittal for the County of Hawaii, Planning Department for fiscal year 2025- 2026. If you have any questions, please contact our office. Please email acknowledgement of this email and its attachments. Thank you, Darnelle Chung Operations Analyst/Human Resources 131 AKINAKA & ASSOCCONSULTIATES LCIVIL TD. RS 1100 Alakea Street, Suite 1800 Honolulu, Hawaii 96813 Phone: 808-836-1900 www.akinaka.com i AKINAKA & ASSOCIATES, LTD. Consulting Civil Engineers June 12, 2025 Mr. Jeffrey Darrow County of Hawaii Planning Department 101 Pauahi Street, Suite 3 Hilo, HI 96720 Subject: Notice to Providers of Professional Services Fiscal Year 2025-2026 Please accept this letter of interest for the County of Hawaii, Planning Department,fiscal year 2025-2026. We are especially interested in applying for projects in the following categories: COMMUNITY PLANNING(COMMUNITY PLANNING ASSISTANT) COMMUNITY PLANNING(ENVIRONMENTAL PLANNING) Please find attached our complete statement of qualification. If there are any questions or clarifications of our experience, please call the undersigned. Very truly yours, ija . K ,n C. Kawah ra, P.E. President Enclosures: 1) SF330 2) Professional Licenses 3) Company Brochure 4) Staff Resumes Alakea Corporate Tower . 1100 Alakea Street, Suite 1800 . Honolulu, Hawaii 96813 Phone: (808) 836-1900 . Fax: (808) 836-8852 PROFESSIONAL SERVICES QUALIFICATIONS PART I - SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.PUBLIC NOTICE DATE 2.PROJECT CATEGORY June 1, 2025 Community Planning Assistant, Environmental Planning B. POINT OF CONTACT 3.NAME AND TITLE Ken C. Kawahara, P.E. — President 4.NAME OF FIRM Akinaka &Associates, Ltd. 5.TELEPHONE NUMBER 6.FAX NUMBER 7.E-MAIL ADDRESS 808-836-1900 808-836-8852 kck @ a ki n a ka.co m E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY (Complete one Section E for each key person.) 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE Ken C. Kawahara, P.E. President a.TOTAL b.WITH CURRENT FIRM 33 15 14.FIRM NAME AND LOCATION(City and State) Akinaka &Associates, Ltd. — Honolulu, Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) University of Hawaii at Manoa, 1992, BS, Civil Engineering State of Hawaii, P.E., License#9148, 1997 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) ACEC, APWA, ASCE, SWWA, HCES, HLPC, WEF 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Makani Wind Pilot Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimea, Island of Hawaii, Hawaii 2014 Estimated 2019 8 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Civil engineering support as well as project management for Google Inc. to deploy a 600kw Airborne Wind Turbine prototype on land owned and operated by Parker Ranch. Project included 4 phases: Site selection &Environment Due Diligence, Investigation &Environmental Compliance, Design &Construction and Construction &Testing Support Services. Project Role: Principal project management (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Upcountry Maui Exploratory Potable Water Well PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Various Locations, Maui, Hawaii 2011 Estimated 2019 b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Engineering services including site identification, preparation of environmental assessment, constructions plans and specifications, permits, and construction services for an exploratory well site in the Makawao or Pukalani Hydrological Sectors on the island of Maui. Project Role: Principal project management (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Waimea Stream Diversion PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimea, Kauai, Hawaii 2017 N/A C (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Design modifications to stream diversion at the Koaie Stream,Waiahulu Stream,and Waimea River on Kauai. Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP). Project Role: Principal project management (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Water-Energy Nexus Investigation PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable) Various Locations, Oahu, Hawaii 2015 N/A d (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Analyze by user size,costs, energy intensity the energy needed to produce water/wastewater and water needs to produce energy. Provide a benchmark for energy intensities and water intensities and identify opportunities and barriers to co- implement water and energy efficiency program. Project also involved making recommendations for the development of programs and policies to optimize water and wastewater systems. Project Role: Principal project management (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Upsizing of Lalamilo Well A PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Kamakoa, Island of Hawaii, Hawaii 2014 Estimated 2019 e (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Design improvements to a submersible 20 stage pump and motor or Line Shaft, 1,000 gpm pump and motor(replaces 700 gpm pump and motor), new piping and appurtenances to accommodate larger pump and motor, new control building, access road and sidewalks, site grading and demolition of existing building. Project Role: Principal project management AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY (Complete one Section E for each key person.) 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE Scott A. Kunioka, P.E. Project Manager a.TOTAL b.WITH CURRENT FIRM 39 8 14.FIRM NAME AND LOCATION(City and State) Akinaka &Associates, Ltd. — Honolulu, Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) University of Hawaii at Manoa, 1986, BS, Civil Engineering State of Hawaii, P.E., License#7257, 1991 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) American Society of Civil Engineers, Hawaii Water Environment Association, UH Engineering Alumni Association 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Upcountry Maui Exploratory Potable Water Well 2011 Estimated 2018 Various Location, Maui, Hawaii a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Engineering services including site identification, preparation of environmental assessment, constructions plans and specifications, permits, and construction services for an exploratory well site in the Makawao or Pukalani Hydrological Sectors on the island of Maui. Project Role: Project manager (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Waimea Stream Diversion PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimea, Kauai, Hawaii 2017 N/A b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Design modifications to stream diversion at the Koaie Stream,Waiahulu Stream,and Waimea River on Kauai. Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP). Project Role: Project manager (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) First Insurance Center Drainage Improvements 2017 Estimated 2018 c. Honolulu, Hawaii (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Design the replacement of sidewalk culverts at four locations around the property, preparation of all documents necessary to obtain permits. Project Role: Project manager (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable) Kahului Airport MBR Scalping 2018 2020 Kahului, Maui, Hawaii d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Extract wastewater from the sewer system and produce R-1 water for end users. Provide grading, erosion and sediment control, laydown and staging areas, asphalt surfacing and chain link fencing, paving removal, and trenching for underground piping and surface restoration. Project Role: Project manager (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) EIS East Maui Water Lease 2017 N/A e. Maui, Hawaii (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provide technical support for the EIS regarding the surface waterer and ground waters in the HC&S field system, Upcountry and Naiku areas in Maui. Project Role: Project manager AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 3 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY (Complete one Section E for each key person.) 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE W. Roy Hardy, P.E. Senior Project Manager a.TOTAL b.WITH CURRENT FIRM 37 4 14.FIRM NAME AND LOCATION(City and State) Akinaka &Associates, Ltd. — Honolulu, Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) Santa Clara University, 1986, B.S. Civil Engineering; State of Hawaii,#7548, PE University of Hawaii at Manoa, 1987, M.S. Civil Engineering Water Resources 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED 2019 Hawaii Water Plan, Water Resources Protection Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 8 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Guided the establishment of Commission approved updated sustainable yields using latest and best information available for recharge estimates and appropriate numerical and analytical models and monitoring network data as defined in the 2019 WRPP. (1)TITLE AND LOCATION (City and State) 10 Irrigation Water Requirement Estimation Decision Support System PROFESSIONAL SERVICES CONSTRUCTION (If applicable) b• (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Guided the establishment of the Commission approved original and update to its Irrigation Water Requirement Estimation Decision Support System to estimate crop irrigation requirements for consumptive use permitting in Hawaii. This ArcGIS tool was developed in conjunction with the University of Hawaii Manoa Collage of Tropical Agriculture and Human Resources. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED RAM2 Model and the Determination of Sustainable Yields of PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Hawaii Basal Aquifers c. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Guided the update to the original Robust Analytical Model (RAM) approved by the Commission in 1992, in conjunction with the University of Hawaii Manoa Water Resource Research Center. Used to help set sustainable yields statewide where sufficient deep monitor well data exists. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Hawaii Well Construction and Pump Installation Standards PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable) d (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm Updated the original 1997 HWCPIS and assisted in the development for the goal of ensuring the safe and sanitary maintenance and operation of wells,the prevention of waste,and the prevention of contamination and protection of the public trust of ground water aquifer resources. (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Regulatory Permitting of Ground Water Production and PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Monitoring Wells 2 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm In charge of permitting program for well construction, pump installation,and ground water use permit applications. For a time also concurrently managed the Stream Protection and Management Branch responsible for stream diversions, stream channel alterations, and setting instream flow standards. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 4 E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY (Complete one Section E for each key person.) 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE Gavin M. Gana!, P.E. Project Engineer a.TOTAL b.WITH CURRENT FIRM 23 23 14.FIRM NAME AND LOCATION(City and State) Akinaka &Associates, Ltd. — Honolulu, Hawaii 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) University of Hawaii at Manoa, 2005, BS, Civil State of Hawaii, P.E., License#14527, 2011 Engineering 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) American Water Works Association 18. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Water Main Replacement at Various Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable) a. Honolulu, Hawaii 2011 2016 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Water main replacements for various streets including installation of pipe locator devices along pipeline alignment when pipe material is PVC pipe,traffic control plans for work with City jurisdiction, NPDES permit. Project Role: Project engineer (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Kakaina Subdivision PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimanalo, Hawaii 2011 2016 b• (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Design of a 45-lot subdivision. Improvements included relocation of a 20" Board of Water Supply CCP main located partially on Department of Hawaiian Homelands land, design of an underground detention system on an infill subdivision to maximize the number of lots and connection of drain system to an existing concrete lined channel. Project Role: Project engineer (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Maunawili Elementary Campus Replace Waterlines PROFESSIONAL SERVICES CONSTRUCTION (If applicable) c. Maunawili, Kailua, Hawaii 2012 Estimated 2018 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Replacement of waterlines and analyzing fire protection and coordinating with the fire department. Project Role: Project engineer (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Waimanalo Elementary Miscellaneous R&M PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) d. Waimanalo, Hawaii 2012 2017 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Replacement of existing waterline, existing ceiling fans and existing fire alarm system. Project Role: Project engineer (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Waiola Subdivision Phase 1, 2 &3 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Waiola, Kauai, Hawaii 2010 On-going (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Design of subdivision including lot/road layout, grading, utility design, erosion control and sewer pump station design. Project Role: Project engineer AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 5 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.) 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE Austin K. Inouye Junior Engineer a.TOTAL b.WITH CURRENT FIRM 5 4 15.FIRM NAME AND LOCATION(City and State) Akinaka &Associates, Ltd. — 1100 Alakea Street, Suite 1800— Honolulu, Hawaii 96813 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) University of Hawaii at Hilo, 2020, BS, Geology N/A 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) American Council of Engineering Companies of Hawaii, American Water Works Association 19. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED BWS Sanitary Survey PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Various locations, Oahu 2020 N/A a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Inspect facilities owned by the Board of Water Supply for significant deficiencies and recommendations. Site inspections along with photos were taken to document the items that needed to be addressed by the Board of Water Supply. Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Repair Trench Drains at Pier 31 & 51-52 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Honolulu, Hawaii 2010 On-going b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm The existing trenches require additional filtration to meet permanent BMP requirements. Selected existing trench drains and drain inlets shall have storm treatment filters installed within them to intercept pollutants&improve runoff charges. Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Iwilei Area Sewer Improvements 2020 Estimated 2023 Honolulu, Hawaii (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm C. Construction 8-inch diameter sewer and abandon old sewer lines, replacement of sewer lines through and fronting Aala park on King Street, upsizing of sewer line and additional segments downstream to provide capacity for the redevelopment of the Mayor Wright housing. Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable) Puako Waterline Replacement 2019 2022 Hilo, Island of Hawaii d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Design of new waterline *-inch and 12-inch)along Puako Beach Drive. The new waterline shall have external corrosion protections. Permits involved include SMA, NPDES and SHPD compliance. Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Parker Ranch Non-Potable Water Study 2019 N/A Island of Hawaii (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm e. Review and inventory of non-potable water system, review and evaluation of Parker Ranch's non-potable water study/analysis including review of water registrations, intakes and permits, evaluate current allotments and usage and provide recommendations/strategy on the prioritization of infrastructure and capital expenditures, and renewal of Parker Ranch's water registrations, intakes,and permits. Project role: Engineering support AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 6 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.) 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE Kevin J. Meagher Junior Engineer a.TOTAL b.WITH CURRENT FIRM 8 5 15.FIRM NAME AND LOCATION(City and State) Akinaka &Associates, Ltd. — 1100 Alakea Street, Suite 1800— Honolulu, Hawaii 96813 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) University of California Los Angeles, 2016, B.S., Chemical N/A Engineering 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) American Council of Engineering Companies of Hawaii, American Water Works Association 19. RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Kulani Correctional Facility Water Study PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Hilo, Island of Hawaii 2019 2022 a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Repair of a leak within the water distribution system,evaluate and improve the existing roof top catchment system, evaluate and improve the existing storage system with the facility as well as evaluate and recommend options to increase treatment of potable water for the facility Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED 1234 Matlock Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Honolulu, Hawaii 2021 On-going b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Construction of site improvements including grading and water,sewer and drainage related infrastructure. Drainage design includes the design of erosion control measures during construction,design of water quality BMPs, coordination with DPP for plan review and approval and preparation of a Storm Water Quality Report. Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) BWS Kalawahine 180' Reservoir 2018 On-going Honolulu, Hawaii (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm c. Design of a reinforced concrete reservoir, instrument house,24" transmission main, irrigation access road improvements, retaining rock wall, installation of a new curb ramps and modifications of existing curb ramps. The waterline design crossed over a stream,which lead to horizontal drilling. Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) Waimea Steam Diversion 2017 NA Waimea, Kauai, Hawaii d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm Design modifications to stream diversions at the Koaie Stream,Waiahulu Stream, and Waimea River on Kauai. Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP). Project Role: Engineering support (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Kanalani Street Extension 2018 2022 Island of Hawaii (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm e. Construction of a new roadway that would allow for the development of a 40-acre land parcel. Sewer,water and fire hydrants constructed as part of the new roadway, design of a two-lane roadway with traffic in both directions installation of catch basin filters and inlet along with installation of waterline and fire protection. Project role: Engineering support AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 7 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Waimea District Park Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimea, Big Island, Hawaii 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Hawaii, Department N/A N/A of Parks & Recreation 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project involved the master planning of the new Waimea District Park. Project Highlights: • Assess existing drainage, water, and sewer systems • Assess grading, access, and parking lot constraints • Evaluate three alternative layouts • Civil improvements included grading, site drainage, water system, sewer system, and parking lot • Schematic plan development Akinaka &Associates, Ltd. was chosen as the prime civil consultant for the design and construction of the Waimea District Park in 2014. 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates Ltd. Honolulu, Hawaii Civil Engineer/ Sub-consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' PBR Hawaii Honolulu, Hawaii Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 8 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Laiopua Village 4 Subdivision — Phase 2 Hema PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Kailua-Kona, Big Island, Hawaii On-going 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Department of Hawaiian Jeffrey Fujimoto (808) 620-9274 Home Lands 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project included the design for a 125 residential lot subdivision. Work includes lot grading, design of six roadways, and subdivision infrastructure including sewer, water drainage, landscaping and electrical. Project Highlights: • 125 residential lot subdivision • Lot grading • Design of 5 roadways • Subdivision infrastructure - sewer, water drainage &electrical • moot Sewer: , �'• ' ..�,. " VIIAX " • 3,900 linear feet of 8" PVC sewer • 20 man holes Drain: V;q.4� ,��.• .,,. • 31 catch basins 1c_ _/ 1I.V3f, .'• 17 dry wells (� '• �� • 600 linear feet of 18" RCP z = °" 6 tea' — -- x; ri41 Water: �r " • 4,000 linear feet of 8" DI water main .04 • 8 fire hydrants , • Water system for subdivision on two swim, separate water service zones Permits: • NPDES Form C ' • UIC 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates Ltd. Honolulu, Hawaii Prime/Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. Ronald N.S. Ho &Associates Honolulu, Hawaii Electrical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' Engineers Surveyors Hawaii Honolulu, Hawaii Surveyors (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d' Fewell Geotechnical Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. KAI Hawaii Honolulu, Hawaii Structural Engineer AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 9 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Kumuhau Subdivision PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimanalo, Oahu, Hawaii 2009 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Department of Hawaiian Jeffrey Fujimoto (808) 620-9274 Home Lands 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project included the design of a 52 lot subdivision in Waimanalo, Hawaii. Improvements included lot grading, roadway design, design of drainage, water and sewer system to support subdivision. Major challenges included to accommodate the design of a subdivision on property within FEMA flood zones. Project Highlights: • Grading for 52 residential lots • Design of a detention basin on site with outlet to an existing stream • 1,400 linear feet of new roadway (2 roads) • 2,230 linear feet of 8" & 10" VCP sewer main & 12 man holes - • 1,600 linear feet of 8" D.I. water main &2 fire hydrants• ®�. v Horizontal directional drilling for fiber optic line • 3 pads for USPS mailbox clusters • 1,925 linear feet of 18" &24" RCP drain line • 20 catch basins • 2 grate inlets • 1 drain manhole Applicable Permits: • NPDES Form C • DOH 401 Water Quality Certification • Stream Channel Alteration Permit r • Army Corps 404 Permit yv 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates Ltd. Honolulu, Hawaii Prime/Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b Fewell Geotechnical Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. ACE Surveying Honolulu, Hawaii Surveyors (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d KAI Hawaii Honolulu, Hawaii Structural Engineer e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 10 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Makani Pilot Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Waimea, Big Island, Hawaii 2014 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Makani (Google Inc.) Scot Johnson (650) 793-2951 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project involved civil site improvements for the Makani (Google Inc.) Pilot Project in Waimea, Big Island. Project Highlights: • Construction managements • Preparation of field reports • Design of access road from entrance gate to project site • Design of O&M tent • Grading improvements • Drainage improvements • Grounding and Lightning Protection Plan • Assist with transportation plan on transporting the kite from the pier to the project site • Archaeological preservation plan • Define appropriate agencies required to deploy the system • Define the different stakeholders (government and private) • Foundation design • Electrical system/connection to quarry, study of existing system operating at quarry 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates Ltd. Honolulu, Hawaii Civil Engineer— Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' KAI Hawaii Honolulu, Hawaii Electrical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' Fewell Geotechnical Honolulu, Hawaii Geotechnical Engineer d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE ASM Affiliates Honolulu, Hawaii Archaeology Review (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Geometrician Honolulu, Hawaii Botanical Survey (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. Rana Biological Consulting Honolulu, Hawaii Biological Survey (Renewable Fauna) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 11 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects,with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Hanapepe Pipeline PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Hanapepe, Kauai, Hawaii 2015 Estimated December 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Kauai, Kirk Saiki (808) 245-5411 Department of Water Supply 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project involved the reorganization of the water system and pipeline connecting Hanapepe and Ele'ele and Hanapepe 6" waterline replacement. Project Highlights: • Installation of new waterline along Kaumualii Highway to interconnect the Hanapepe and Ele'ele water systems —i ''* -,r ' • Installation of 6-inch main replacement along Hanapepe Road • Preparation of Preliminary Engineering Report (PER) 1 ` j+ �; • Design of piping on bridge � �,,, t �." • Design of emergency pump connection • Approximately 2,600 U. of 12-inch waterline along Hanapepe Road, including bridge crossing • Approximately 2,800 U. of 16-inch waterline along Kaumualii ..a Highway Permits Involved: • NPDES • Department of Army Nationwide Permit • DOH 401 Water Quality = - • DLNR Stream Channel Alteration • SMA Permit a 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a' Akinaka &Associates, Ltd. Honolulu, Hawaii Prime Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' Geolabs, Inc. Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' Esaki Surveying Lihue, Kauai Surveying (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d' Ron Ho &Associates Honolulu, Hawaii Electrical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Fung Associates Honolulu, Hawaii Historic Consultation (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. Scientific Consultant Services Honolulu, Hawaii Archaeological AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 12 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Accessibility Improvements Project— Hilo Bayfront, PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) Mo'oheau Park& South Hilo Parks Maintenance Baseyard 2018 Estimated 2021 Hilo, Hawaii 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Hawaii Department of Parks James Komata (808) 961-8531 & Recreation 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) Purpose of this project was to address the removal/resolution of all architectural barriers throughout the site and the facilities to ensure equal access for all patrons. The project also will address certain repairs and maintenance needed and/or improvements affected by or appurtenant to the accessibility issues. Project is a part of a larger group (16 total) of ADA improvement sites. Construction contract documents are to be prepared as separate projects. A previous inventory identified a possible trail affecting the Hilo Bayfront site. As a result, the project involved retaining an Archaeological consultant and the preparation of an Archaeological Monitoring Plan with SHPD consultation. South Hilo Parks Maintenance Baseyard — • ADA compliance assessment with report to be submitted to the County of Hawaii • Improvements to sidewalks • Grading within parking lot areas to provide accessible routes from buildings to parking • Layout and restriping of parking lot to accommodate the appropriate number of required stalls • Accommodations for stairs and ramps to buildings located above existing ground elevation Hilo Bayfront— • Accessible routes to bathrooms • New outdoor beach shower facility adjacent to public restroom building • Permitting for ADA construction • Tree removal to protect existing facilities • SMA permit Mo'oheau Park— • ADA improvements to bandstand area and bus terminal • Sidewalk improvements to Kamehameha Highway • ADA parking to football field • Provide accessible route from parking lot to football field • SMA permit 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates Ltd. Honolulu, Hawaii Prime Consultant b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ushijima Architects Honolulu, Hawaii Architect (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' Fung &Associates Honolulu, Hawaii Historical Preservation Consultant d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Engineers Surveyors Honolulu, Hawaii Surveyor (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Fewell Geotechnical Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f' William Moore Planning Hilo, Hawaii Planner AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 13 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects,with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Galbraith Estate 3.0 & 10.0 MG Reservoirs PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Wahiawa, Oahu, Hawaii 2014 2021 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER State of Hawaii, Agribusiness Ivan Kawamoto (808) 586-0181 Development Corporation & Department of Agriculture 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project included civil engineering and related services in connection with the planning and design for the Galbraith Estate Reservoirs in Wahiawa, Oahu. Project highlights: • Environmental review and assessment process • Set limits of the topographical survey and mapping required to develop the construction documents • Design two reservoirs (3.0 & 10.0 MG) as in-ground, lined reservoirs to serve agricultural purposes • Design shall be limited to at-grade and below-grade grading, reservoir lining and capacity calculations • NPDES permit • Basis of design report Akinaka &Associates was chosen by the Department of Agriculture to oversee the construction phase by offering construction management services such as responding to RFI's, submittals, final inspection, creation of as-built plans and final punch list items. 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Akinaka &Associates, Ltd. Honolulu, Hawaii Prime Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Engineers Surveyors Hawaii Honolulu, Hawaii Surveyor (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Fewell Geotechnical Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Environmental Planning Honolulu, Hawaii Environmental Assessment Solutions (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Moiliili-Kapahulu Sewer Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Honolulu, Oahu, Hawaii 2006 Estimated 2013 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER C&C Honolulu, Dept. of Edwin Miyashiro (808) 768-8792 Design & Construction 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project included both the planning and design phase. The objective of the project was to correct current structural and/or hydraulic deficiencies in a portion of sewer line along Date Street. Project Highlights: • Rehabilitate/reconstruct approximately 4,200 linear feet of sewer along Date Street • Install 1,860 linear feet of 12-inch and 800 linear feet of 15-inch sewer parallel to 1,650 linear feet of sewer along Date Street Planning Phase: Apof d • Study 6,800 linear feet of existing sewer main from 14"to 42" diameter via CCTV video and 42 manholes along Date Street • Manhole and pipeline assessments done via NASSCO's fit" MACP and PACP reports • Review alternatives for rehabilitation and reconstruction �rv°': and prepare a design alternatives report (DAR) >� � 5.'. e.�.'�y+�u• —. ,.,.° +Raw . a. ,y�'*,�^d"a 4s £" r Design Phase: • Prepare plans and specs to support the recommendations of the DAR Estimated cost of construction: $9,200,000 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a' Akinaka &Associates Ltd. Honolulu, Hawaii Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' Fewell Geotechnical Honolulu, Hawaii Geotechnical Engineers (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' ACE Surveying Honolulu, Hawaii Surveyors (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d' PBR Hawaii Honolulu, Hawaii Environmental Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Y. Ebisu and Associates Honolulu, Hawaii Noise Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 15 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no moe than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Kapaa Kealia Bike and Pedestrian Path PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Kapaa-Kealia, Kauai, Hawaii 2004 2009 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Kauai Dept of Public Works Doug Haigh (808) 241-6650 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) A Design-Build project that included improvements for a bike & pedestrian path with amenities such as rest pavilions and restrooms along the coastline from Kapaa to Kealia on the island of Kauai. The project corridor basically utilized an old abandoned cane haul road along the eastern coastline of Kauai from Kapaa to Kealia Kai. This project was honored with the 2010 ACEC Project of the Year— Parks &Trails, the 2010 APWA Hawaii Project of the Year and 2010 PM! Award of Merit Project Highlights: • 4.3-mile ADA Compliant paved path for bikes and pedestrians • Three stream bridge crossings (Structural/Aesthetic upgrade of existing structures of community significance) • One stream culvert crossing (Replacement of damaged structure) • Sixteen rest pavilions &three restroom facilities • Rock-fall mitigation • Preservation of sensitive coastal environment • Landscaping & irrigation system Cost: $7,000,000 Y T .arr r ** � � G n+gip �s "+� + �, .a -..^' & ram '•--x-� . 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a' Akinaka &Associates, Ltd. Honolulu, Hawaii Prime/Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' Nishimura Katayama Oki Inc. Honolulu, Hawaii Structural Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' Next Design LLC Honolulu, Hawaii Architect (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. PBR Hawaii Inc Honolulu, Hawaii Landscape Architect (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Jas W Glover Ltd. Honolulu, Hawaii Contractor f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 16 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED La'i'opua Village 5 Subdivision PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Kailua, Big Island, Hawaii 2008 2011 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Department of Hawaiian William Makanui N/A Home Lands 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project involved design of site infrastructure improvements for the planned ultimate 117 residential lots. Project challenges included offsite roadway improvements, endangered species trees, offsite water system improvements. Project Highlights: • 117 Residential Lots (Ultimate Development) • Endangered species preservation lot • Site infrastructure: • 4 roads (3,900 linear feet) • 4,700 linear feet of 8" D.I. water mains, 8 fire hydrants • 3,700 linear feet of 8" & 10" VCP sewer mains, 24 manholes • 31 catch basins, 18 dry wells, 2 grate inlets, 2 drain manholes &720 linear feet of 18" RCP drain lines • Location for a USPS cluster mailbox area to service all lots • Applicable permits: NPDES Form C, UIC Permit Project Cost: $18,000,000 m ?bps 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a' Akinaka &Associates Ltd. Honolulu, Hawaii Prime/Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' Ronald N.S. Ho &Associates Honolulu, Hawaii Electrical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' KAI Hawaii, Inc. Honolulu, Hawaii Structural Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d' Fewell Geotechnical Engineering Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Ace Land Surveying Honolulu, Hawaii Land Surveyor (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f' PBR Hawaii Inc. Honolulu, Hawaii Landscape Architect AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 17 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects, with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Kohala Ranch Water System Study PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Kohala, Big Island, Hawaii 2005 N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Kohala Ranch Water Glenn Okamoto Company 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) To provide civil engineering services to the proposed Kohala Ranch Well Improvements in North Kohala, Big Island. Improvements included: • Well pump with a pumping capacity of 700 gpm to a new 1.0 million gpm stainless steel, glass-fused tank • One 1.0 MG stainless steel, glass-fused tank with a concrete floor and continuous ring footing • Once concrete masonry pump control building • Appurtenant site improvements to include grading, piping, fencing, drainage system, and access road • Electrical improvements • Pump Installation Permit • Preparation of Preliminary Engineering Report (PER) 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates, Ltd. Honolulu, Hawaii Prime Civil Engineer b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 18 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE FIRM'S QUALIFICATIONS FOR THIS SERVICE CATEGORY (Present no more than 10 projects,with emphasis on previous City projects. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Hanapepe Pipeline PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Hanapepe, Kauai, Hawaii 2015 Estimated December 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Kauai, Kirk Saiki (808) 245-5411 Department of Water Supply 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS SERVICE CATEGORY (Include scope,size,and cost) This project involved the reorganization of the water system and pipeline connecting Hanapepe and Ele'ele and Hanapepe 6" waterline replacement. Project Highlights: • Installation of new waterline along Kaumualii Highway to interconnect the Hanapepe and Ele'ele water systems • Installation of 6-inch main replacement along Hanapepe Road • Preparation of Preliminary Engineering Report (PER) • Design of piping on bridge • Design of emergency pump connection • Approximately 2,600 U. of 12-inch waterline along Hanapepe Road, including bridge crossingv. ,a, • Approximately 2,800 U. of 16-inch waterline along Kaumualii Highway Permits Involved: • NPDES • Department of Army Nationwide Permit • DOH 401 Water Quality ., • DLNR Stream Channel Alteration • SMA Permit a 25. FIRMS INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Akinaka &Associates, Ltd. Honolulu, Hawaii Prime Civil Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b' Geolabs, Inc. Honolulu, Hawaii Geotechnical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE °' Esaki Surveying Lihue, Kauai Surveying (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d' Ron Ho &Associates Honolulu, Hawaii Electrical Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. Fung Associates Honolulu, Hawaii Historic Consultation (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f' Scientific Consultant Services Honolulu, Hawaii Archaeological AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 19 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 24. NAMES OF KEY 25. ROLE IN 26. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL EXAMPLE (Fill in "Example Projects Key" section below before completing table. Place "X" (From Section E, PROJECT under project key number for participation in same or similar role.) Block 11) 1 2 3 4 5 6 7 8 9 10 Ken Kawahara Principal PM Z ❑ Z Z Z ❑ Z Z ❑ ❑ Scott Kunioka Project Manager ❑ ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ Gavin Ganal Project Engineer Z ❑ Z ❑ Z Z Z ❑ Z ❑ Austin Inouye Junior Engineer DOODOZOODO Kevin Meagher Junior Engineer ❑ ® ❑ ❑ ❑ ® ❑ ❑ ❑ ❑ W. Roy Hardy Senior Project ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Engineer ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 27. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) 1 Waimea District Park 6 Accessibility Improvement Projects 2 Laiopua Village 4 HEMA 7 Galbraith 3.0 & 10.0 MG Reservoirs 3Kunnuhau Subdivision Moiliili-Kapahulu Sewer Rehab 4 Makani Pilot Project 9 Kapaa-Kealia Bike & Pedestrian Path 5 Hanapepe Pipline 10 Laiopua Village 5 Subdivision AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 20 H.ADDITIONAL INFORMATION 30.PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION.ATTACH ADDITIONAL SHEETS AS NEEDED Proposed Project Team: Sub-consultants: KAI Hawaii —Structural Engineers Ronald N.S. Ho &Associates— Electrical Engineers ControlPoint— Surveyors Geolabs—Geotechnical Engineers Environmental Planning Solutions— Environmental Consultant All sub-consultant work will be coordinated by Akinaka &Associates Ltd. In addition, all communication with the client shall be through Akinaka &Associates, Ltd. Company Background: Akinaka &Associates, Ltd. is a locally (Kama'aina) owned company that has been providing professional engineering services to the Hawaii community since its inception in 1941 as a sole proprietorship by Arthur Y. Akinaka. In 1966, the firm was incorporated and led by Robert Y. Akinaka. Today, the company is a locally owned firm headed by Ken C. Kawahara, P.E. The principals &senior staff have over 90 years of civil engineering experience. The technical staff consists of eight licensed civil engineers and a licensed surveyor. The average design experience for the technical staff is over 20 years. The staff of Akinaka &Associates, Ltd. has worked successfully on many State, County and private projects with accelerated schedules and restrictive budgets, at the same time achieving a level of quality commensurate with the engineering standard of practice. The firm's experience has included projects in both the public and private sector including: • Construction Management • Major water system facilities • Due diligence assessments for property acquisitions • Highway/roadway facilities • Airport & Harbor facilities • Sanitary sewer • Storm drainage • Schools • Residential &Agricultural • Subdivisions • Golf Courses • Commercial Development • Master Planning Design experience also includes conformance to: • City & County approvals • State approvals • Federally funded projects • ADA requirements • Environmental Permits • Well Pump Drilling, Testing & Casing • Pump Installation Permits AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 21 Capacity of the Firm & Key Personnel to Accomplish the work in the required time: Akinaka &Associates, Ltd. has worked successfully on many State, County and private projects with accelerated schedules and restrictive budgets, at the same time achieving a level of quality commensurate with the engineering standard of practice. Akinaka &Associates Ltd. has the capacity to accomplish the work in the required time with the available or proposed resources. Commitment of resources will be dedicated to completing the project on-time should we be selected as the consultant for the project. Principal involvement in projects with time constraints assures that the firm will be focused on meeting the goals of the County of Hawaii, Department of Public Works. Our firm is familiar with the procedures, standards and requirements of the State of Hawaii, federal funded projects, and all required permitting processes. Akinaka &Associates Ltd. uses software to efficiently design and draft projects, making production of plans seamless. All employees are proficient in computer-aided design, which promotes a high level of quality control. Deltek software is used to track man-hours and project budgets to allow project managers the ability to forecast workload and employee availability. Scheduling software assists project managers in proper scheduling to maintain oversight on projects and to assure that all work products produced by the firm undergoes proper quality control. We continue to work with an integrated consultant group based on performance on a timely basis and product quality. Plans, data and other shared information will be distributed through electronic mail. Telephone conferences will be implemented to reduce administrative and coordination time. Initial establishment of a basis of planning and drawing protocols will facilitate in coordination and review. The timing of the subject project is appropriate for the workload of the firm. Projects that are presently active will either be completed before the subject project begins or are already staffed. Client References: Riley Smith - Lanihau Properties, CEO P.O. Box 9032 Kailua-Kona, Hawaii 96745 Phone: (808) 936-7129 Warren Haruki -Grove Farm Properties, President 1100 Alakea Street Honolulu, Hawaii 96813 Phone: (808) 245-3678 Ernest Lau, P.E. - Board of Water Supply, Manager & Chief Engineer 630 S. Beretania Street Honolulu, Hawaii 96843 Phone: (808) 748-5030 I. AUTHORIZED REPRESENTATIVE V The foregoing is a statement of facts. 31.SIGNATURE IA� � f) ? 32.DATE 14 V (✓` Ll--- 6/12/2025 33.NAME AND TITLE Ken C. Ka1 ahara, P.E., President AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 22 PROFESSIONAL SERVICE PROVIDER QUALIFICATIONS 1.PROJECT CATEGORY OF INTEREST Community Planning Assistant Environmental Planning PART II -GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3.YEAR ESTABLISHED 4. DUNS NUMBER Akinaka and Associates, Ltd. 1941 2b.STREET 5. OWNERSHIP a.TYPE 1100 Alakea Street, Suite 1800 Corporation 2c. CITY 2d.STATE 2e.ZIP CODE b. SMALL BUSINESS STATUS Honolulu Hawaii 96813 In good standing 6a. POINT OF CONTACT NAME AND TITLE Ken C. Kawahara, P.E. - President 7. NAME OF FIRM (If block 2a is a branch office) 6b.TELEPHONE NUMBER 6c. E-MAIL ADDRESS 808-836-1900 kck@akinaka.com 8a. FORMER FIRM NAME(S) (If any) 8b.YR. ESTABLISHED 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS c. No. of Employees c. Revenue a. Function a. Index Code b. Discipline Profile b. Experience (1) Firm (2) Branch Code Number (see below) 02 Administrative 2 C12 Communications Systems 1 08 CADD Technician 2 E02 Educational Facilities; 5 Classrooms 12 Civil Engineer 7 F03 Fire Protection 2 38 Land Surveyor 1 H07 Highways;Streets;Airfield 6 Paving; Parking Lots H11 Housing(Residential) 3 106 Irrigation; Drainage 1 P05 Planning(Community) 2 P06 Planning(Site) 2 R04 Recreation Facilities 2 SO4 Sewage Collection;Treatment& 2 Disposal S13 Storm water handling&facilities 3 W02 Water resources; Hydrology; 2 Ground water W03 Water supply;Treatment& 5 Distribution Other Employees Total 12 11.ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million (Insert revenue index number shown at right) 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. City and BWS Work 2 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non City and BWS Work 4 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 6 5. $1 million to less than $2 million 10. $50 million or greater 12.A THORIZED REPRESENTATIVE The foregoing is a statement of facts. a.SIGNATURE a7 b.DATE 6/12/2025 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2006) PART II - PAGE 23 @ a) "0 e 0 2 0 0 WS © 0 $ a CO E ca k U : 03 : W : E to c ■ 0 z m k co 71 Cl) k 2 0_ CO e _ 2 ` k e CO : I- : � : C : $ e 0 a) G1 > < a 75- co 4" c / • 7 I- CO z < \ 0 CO Ea w \ CD U) C z § e _ z ■ / J $ E z ® ± z J c,5 CO CD g . ■ < c w o / § < \ 2 CO o CO / \ e \ / ) CD § G § 2 E / : CO 11. c z = < CO 01 _I / .J ƒ _ $ c 0 \ CO 1 m a) -0 m 0 71 2 0 ± U 7 a) ino L 2 — in E m ui k k U : 03 : w a) m E C as 0 2 m k & ZI k ® o k §. m _ 2 ' fi e rx : I- : Go : 0 : $ as a a) a g CL 1- / 5 C / E › / - Q 2 m / ' : E ' , W g « \ O ¢ \ CD CO ± § c w 2 a- / a) - u Z $ CO® e §� ID / k 1_ o § \ - m a) e 7 ® Co CI) § / § \ —) \ 2 \ \ - U Q o CD o a CO < @ _I ƒ _ ƒ _I § co / co 03 : all -0 ■ 0 0 = 0 Ts © o on, — al E es as k k U : m : w ti E co c _ z m ƒ & E 4 k © o $ o_ §.o a e ° Ct I 03 I- : GO I 0 : $ e 0 $ 2 7. 0 as g \ c as - & � 5 > / Tz d 2 @ 7 ® ' - \ w 4 « / O 2 w J U) C I" / c E 2 \ 05 E z a ± ® § CO \ k } \ 2 C 2 w 4) \ Q 7 / 9 (0 7 _ z z z g CD C Q E / 2 z § \ 3 E - o ED s = \ to a) - \ /@@ _J / _J ƒ _1 co ce) I 1 CD a) 13 a) 0 2 0 ± U 7as © 0 2 — 2 E ra al k k O : CO : w a) n E 0 2 2 k.07 ZI to k ® nit' 0 al 0_ . el _ 2 ' V e Et : & : 0 : 0 : $ e a q a) a) ti 0 \ C ^ & � § > > k L7, 1- / \ ' e : \ R w 4 « / O j w } a) 0 C a § a) ± 2 \ a) $ e 2 X ® 2 a) c in - 2— © / e = Ts 1- / § \ \ « C e ° ® 1 92 � 2 0 2 3 2 e / ® a) CD C ƒ E / Ts 'A = E - •§ o =\ 0 Cn \@ _I \ :I ƒ _ CO I m & -40 ■ o 2 0 0 TO © o $ — 2 E k k O : 03 : w E C c as 0 z 2 o \ ca as $ ad o \ o_ CO 2 ' Ct : I : Q. : : $ e a 0 fp e \ Q I- \ a $ coa 5 k / - 2 R - W \ 2 \ 0 © w \ w CO C e o 0 a) / k - z § Z « ® 112 Sin CU a § n 2 < 2 1- \ § > > q e / © a w o CD 2 / 2 m 7 U / / C 2 0 2 0 2 0 / 0@ ZI \ n \ _1 b / to : Engineering -No4..... for Hawaii Since 1941 "' '� k,,:z ---+S,t. '. ' Jr t -s r u y u la.. 1. 7 -2 d= .... o yl� , r ,., 2.;-', -gym .; r . 41�� t AI( INAI(Aw �' l'' r LcASSOCIATE % LTD. ''' CONSULTING CIVIL ENGINEERS _ o y ., ' tea .+s, ; •Ls4 yx \ ate. *- `L a A 7 •- 4 3 E'1. im'bdF - 3{_ r� -"' �' - At- Irks � ": „' I ff y_. N y ,dp _ �5 y °mwa�mme.,n:.,u.,,uo muaw wviww� ir my ' . .� 1 - _ _ 1 I ,, , 1 lj l T +,,+z ++�w., � w«iiir„ of Akinaka&Associates,Ltd. is a locally(Kama'aina) owned company that has been providing professional engineering services to the Hawaii community since its inception in 1941 as a sole proprietorship by Arthur Y.Akinaka. In 1966,the firm was incorporated and since 1984 led by Robert Y.Akinaka. Today,the company is an locally owned firm headed by Ken C. Kawahara, P.E. 1.1 With over 80 years of civil engineering experience,Akinaka&Associates, Ltd.has the ability and knowledge to provide the following services to our clients: cil IV 9 0 if Civil Water System Wastewater Planning& Permitting Engineering Engineering Engineering Consulting The principals&senior staff represent over 90 years of civil engineering experience. The technical staff Consists of six licensed civil engineers and a licensed surveyor. The average design experience for the technical staff is over 20 years. The staff of Akinaka&Associates, Ltd. has worked successfully on many State, County and private projects with accelerated schedules and restrictive budgets,at the same time achieving a level of quality commensurate with the engineering standard of practice. The firm's experience has included projects in both the public and private sector including: __ Major water system facilities*Highway and • - y �E Roadway facilities*Airport&Harbor facilities I .; I ll Sanitary sewer*Storm drainage *Schools .- a ®4 Residential&Agricultural Subdivisions i _ I jl Golf Courses *Commercial Development -- - Master Planning fr Ir ;''` 7 ' A Design experience also includes conformance to: City&County approvals*State approvals Federally funded projects*ADA requirements A111 Environmental Permits*Well Pump Drilling, Testing&Casing Pump Installation Permits L:illi AKINAKA & ASSOCIATES, LTD. Consulting Civil Engineers Ken Kawahara, P.E. }\•"'" President - w' Business development,project oversight,proposal writing,client 17 relations,marketing and project ``' management 3y r "1 "*� :t13''..t .kr\ Scott Kunioka, P.E. Ben Ganal, L.P.L.\ .� .,s, W. Roy Hardy, P.E. ''+ Senior Project Manager lim. Senior Designer , Project Engineer t_ Project oversight,preliminary Y �"" Technical design,lead ' "� - - Project engineering details design,scheduling, production of reports, ' , specializing in water ,. marketing,proposal writing exhibits&permits,quality w Pam`. + resources,capacity and " � � i p *, control of plans ' ,U?. ,. distribution ''''''t Gavin Ganal, P.E. ` Project Engineer Ara. �,, -. Technical design,project and se, . ,, sub-consultant coordination, r ilk 40 report and permit writing ,, Austin Inouye - Kevin Meagher Engineer Iiii _ Engineer AutoCAD drawings and 4%0*r AutoCAD drawings and plans,water source reports, ti, • plans,water source reports, project permitting,field 010.i'`+.• , project permitting,field t investigations ,tt, investigations ^'i% . t ; Bryson Tamaye �`��` Reid Takasaki \ t4 Junior Engineer Junior Engineer 1, ,,` Development of AutoCAD Development of AutoCAD drawings,permitting,report drawings,permitting,report writing writing c Ryden Quitoriano lj, Andrew Chen \ V r {Pam, Junior Engineer Junior Engineer Development of AutoCAD ` Development of AutoCAD <' .„ „ '1 drawings,permitting,report drawings,permitting,report s •.i writing writing s • Joe Keane \ Naomi Shibahara\ ; Darnelle Chung °;f1 '.�`. IT Manager - n .i Accounting .--,, Operations Analyst/HR 4 i 1 Overseas the IT management -P,* Overseas the accounting for Analysis operations of the for the office,proficient in the firm including accounts firm and job productivity and 3 AutoCAD drawings and plans ,, receivable and payables overseas Human Resources . , for the firm 6 f a e . y (ilik.,, r PALANI WELL NO. 1 Location: Kailua-Kona, Island of Hawaii + Client: Lanihau Properties/Palani Ranch PROJECT HIGHLIGHTS: This project is a privately developed potable deep well pump station and 1.0 million gallon tank located in Kailua-Kona, Big Island. Upon completion,the facility was dedicated to the Hawaii County Department of Water Supply and become an integral component of the Hawaii County Department of Water Supply's North Kona Water System. The project began with an exploratory deep well which proved to be of ample quantity and good safe drinking water quality. The project then progressed to outfitting the well with a deep (1,800 feet) submersible pump of 1,100 gpm capacity. Project involved the negotiating of water credits,study of an existing water system,analysis of an existing water source,storage,transmission and distribution,hydrological study to determine possible water sources,drilling and testing of exploratory well,drilling,testing and development of a production well and permitting. Permits Required Project Team Building permit Ronald N.S. Ho &Associates - Electrical Engineer NPDES Form C &F Okahara&Associates -Mechanical Engineer Grading permit KAI Hawaii, Inc. - Structural Engineer Stockpiling permit R. M. Towill Corporation-Land Surveying Pump installation permit Fewell Geotechnical - Geotechnical Engineer Geometrician- Environmental Consultant II j Iglu!ti iV d rl ua {d llUlll ! tY f+� 'ulr ru,I • �r yr( �• I` I} �� � „�. � � t • ....• � I{ns ` y yir¢1 w n(' N @n'�"u `I� , Yl \ v, ?r "' as l.. r u 't bI 1 a ,1 / /,.. s (I 14,14rrli�' — v 1+1 MAKANI WIND PILOT PROJECT Location: Waimea, Island of Hawaii + Client: Google, Inc. PROJECT HIGHLIGHTS: This project involved providing civil engineering support as well as project management for Google Inc. to deploy a 600kw Airborne Wind Turbine prototype on land owned and operated by Parker Ranch. Phase 1: Analysis of site location and accessibility, environmental due diligence, community relations,identify applicable regulatory agencies, engage agencies in discussion of the project and define the process required in order to deploy the prototype and operate, if necessary. Phase 2: Identify permits, geotechnical subsurface investigation,topographic survey,environmental compliance Phase 3: Schedule for design process, drainage analysis, design access road, grading for foundation, design of electrical system,plans and specifications for construction,community relations Phase 4: Services during construction,support during testing of wind turbine, construction management Permits Required Project Team Building permit Ronald N.S. Ho &Associates - Electrical Engineer State Historic Preservation Engineers Surveyors Hawaii- Surveyor Division (SHPD) KAI Hawaii, Inc. - Structural Engineer NPDES Form C &F Rana Productions -Avian Survey/Fauna Fewell Geotechnical - Geotechnical Engineer Geometrician-Environmental&Botany Consultant ..f rn 1 Nksr- ., � f �flow I j \ HANAPEPE PIPELINE Location: Hanapepe &Ele'ele, Kauai + Client: County of Kauai,Department of Water PROJECT HIGHLIGHTS: The objective of the project was to reorganize the water system and pipeline connecting Hanapepe and Ele'ele and Hanapepe 6"waterline replacement The project included the installation of a new waterline along Kaumualii Highway to interconnect the Hanapepe and Ele'ele water systems,preparation of a Preliminary Engineering Report(PER),design of piping on the bridge, design of an emergency pump connection. Portion of the waterline crosses the 1911 Hanapepe bridge (considered to be historic by the residents). Placement of the waterline across the bridge would negatively impact the bridge and the bridge is part of a floodway under the jurisdiction of the U.S. Coast Guard and U.S.Army Corps of Engineers. In order to minimize the impact of the bridge,we needed to work and obtain easements from private land owners and install a section of the waterline via horizontal directional drilling. Permits Required Project Team NPDES KAI Hawaii, Inc. - Structural Engineer Section 10,Army Fung Associates, Inc. -Architectural Survey DCAB Esaki Surveying- Surveyor Small Management Area(SMA) Geolabs, Inc. - Geotechnical Engineer Grading permit Geometrician-Environmental Assessment Shoreline Setback 1 yam, Lid &r 4 — wa..a .. _..."....—..—. r v. �.'0,0tAte' :. few... t . I D W f KUMUHAU SUBDIVISION Location: Waimanalo, Oahu+ Client: State of Hawaii,Department of Hawaiian Home Lands PROJECT HIGHLIGHTS: Design of a 52-lot subdivision in Waimanalo, Oahu. Improvements included lot grading,roadway design,design of drainage,water and sewer systems to support the new subdivision. Major challenges included the accommodation of the subdivision design on property within the FEMA flood zones. The project also included limited services during construction including RFIs and submittal reviews,construction site visits and the production of as-built plans. The project included the design of a detention basin on stie with outlet to an existing stream and horizontal directional drilling for the installation of a fiber optic line. Design elements included over 6,000 linear feet of sewer main and water lines, 20 catch basins, 2 grate inlets and 3 pads for USPS mailbox clusters. Permits Required Project Team NDPES KAI Hawaii, Inc. - Structural Engineer DOH 401 Water Quality ACE Surveying- Surveyor Stream Channel Alteration Fewell Geotechnical - Geotechnical Engineer Army Corps 404 Armstrong Builders- Contractor Ronald N.S. Ho &Associates - Electrical Engineer ,a Y, 9a „..„„„ ,o „ , , µpa • . o o MOILIILI-KAPAHULU SEWER REHABILITATION Location: Honolulu, Oahu + Client: City&County of Honolulu, Department of Design and Construction PROJECT HIGHLIGHTS: This project was conducted in two phases: Planning&Design. The objective was to correct current structural and/or hy- draulic deficiencies in a portion of sewer along Date Street Planning phase involved the study of 6,800 linear feet of sewer main(from 14"to 42"in diameter)via CCTV video and the inspection of 42 manholes. Manhole and pipeline assessments were done via NASSCO's MACP and PACP reports. This phase also included the review of alternatives for rehabilitation and reconstruction and the development of a Design Alternatives Report(DAR). Design phase included the rehabilitation/reconstruction of 4,200 linear feet of sewer line along Date Street and the installation of 1,860 linear feet of sewer line. In this phase,plans,specifications and cost estimates were required to support the Design Alternatives Report(DAR). Permits Required Project Team NDPES KAI Hawaii, Inc. - Structural Engineer Noise Variance ACE Surveying- Surveyor DCAB Eckard Brandes,Inc- CCTV Fewell Geotechnical - Geotechnical Engineer PBR Hawaii-Environmental Assessment A KI N A ICA 1100 Alakea Street, Suite 1800 ASSOCIATES4 LTD• Honolulu, Hawaii 96813CONSULTING CIVIL ENCINEERS Phone: (808) 836-1900 akinaka.com rr AKINAKA � &ASSOCIATES LTD. I CONSULTING CIVIL ENGINEERS . A , _ � KEN KAWAHARA, PRESIDENT > { (0) 1100 Alakea Street #1800 (808) 836-1900 ext. 668 kck@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE Prior to joining Akinaka & Associates, Ltd., Ken served as the Deputy Director for the State of Akinaka &Associates, Ltd. Hawaii, Department of Land and Natural Resources, Commission on Water Resource Manage- President, 2011 - Present ment. He implemented the State Water Code statue, rules, and directives of the Commission Business VP, 2010 - 2011 to protect and manage the groundwater and surface water resources for all of the Hawaiian islands. In addition, he oversaw the Engineering Division, Office of Conservation and Coastal State of Hawaii, Department Lands, State Parks, Division of Forestry and Wildlife and the Division of Aquatic Resources. of Natural Resources He also represented the Department on the Natural Area Reserves Commission. Deputy Director, 2007 - 2010 His professional experience in both the private and public sectors includes planning, design, contracting, construction, construction management, regulatory compliance and environmental City & County of Honolulu, quality monitoring. He has extensive experience in management for a variety of projects in- Department of Environmental cluding water resource and system management, master planning, wastewater pretreatment, Services collection, treatment, disposal, recycled water and biosolids reclamation. In addition to work- Acting Regulatory Control ing at the State DLNR, Mr. Kawahara has worked for M&E Pacific (now AECOM), R.M. Towill Branch Chief, 1997 - 2007 Corporation, Gentry Homes and the City and County of Honolulu Department of Environmental Services. Gentry Homes, Ltd. Construction Engineer, 1996 PROJECT EXPERIENCE Water/Wastewater Due Diligence for the Acquisition of the Mauna Lani Resorts & Properties To review the current potable and non-potable water systems; engineering design and reports, REGISTRATIONS provide analysis of system and possible opportunities for water system growth and expansion. State of Hawaii, #9148 Project involved the determination if there will be enough potable water available to the proper- Professional Engineer ties and facilities in Mauna Lani Resort. In order to do that two types of potable water was measures: 1) the water use of existing properties and facilities and 2) potential water use of currently unbuilt properties. In addition, the project involved the evaluation of whether or not the existing wastewater treatment plant would be able to accommodate future flows from the EDUCATION currently unbuilt properties and options for disposal of the additional wastewater effluent. University of Hawaii at Manoa 1992, B.S. Keauhou Development Water Agreement Civil Engineering Review documents such as previous studies, agreements, etc. Meet with the Hawaii Depart- ment of Water Supply to determine the water credits that were available from the former ho- tel's 4-inch water meter. Provide innovative justification to transfer water credits from former QUALIFICATIONS &TRAINING Kona Lagoons parcel to other designated Kamehameha Investment Corporation (KIC) parcels. Maritime Security Awareness Negotiating the transfer of water credits to other KIC parcels, establish water system improve- Training (MARSEC) ments required for the Keauhou Resort Master Plan and acknowledge the engineering condi- tions of agreement, water credits and its transfer within the Keauhou Resort area. Keauhou Development Water Master Plan Document major components of the existing system as currently operated, obtain updated information relative to DWS regional water system map, gain an understanding of the existing system general operation and obtain details of how the existing system is operated, prepare a North Kona Water System map along with water budget, prepare a Water System Facilities Master Plan for the potable water system, hydraulic model based on the project demand re- quired and development phasing, and prepare a Water Master Plan outlining the potable water system infrastructure improvements. - r= ( 1 • r1:142 AKINAKA SCOTT A. KUNIOKA P.E. COASSOCCIIVIL UEV PROJECT MANAGER gra 1100 Alakea Street #1800 (808) 836-1900 ext. 684 sak@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE Scott has over 34 years of experience in civil engineering. He is responsible for project man- Akinaka &Associates, Ltd. agement, project oversight, scheduling, business development, conceptual design, quality Project Manager control and proposal writing. 2017 - Present Bowers & Kubota Consulting PROJECT EXPERIENCE Project Manager Kulani Correctional Facility Water System 2013 2017 Research existing system, field verify facility, its structures and their uses, inventory and as- sess the existing water system and it's condition, obtain and compile existing water system usage and trucked water data, estimate existing domestic and non-potable water and fire pro- Shimabukuro, Endo & tection requirements and demands which will be used to calibrate existing actual usage with Yoshizaki, Inc. existing services and population count, and investigate and provide recommendations to repair Project Manager a suspected leak within the existing distribution system. 2000 - 2013 North Kohala Water System Improvements Wilson Okamoto &Associates To provide planning, design and construction services regarding the North Kohala Water Sys- Project Manager tem. The project involved an environmental assessment, and design plans, specifications and 1988 - 2000 cost estimate, and obtaining the necessary permits for an exploratory well in the Kohala area that could potentially provide water for agricultural use. If the exploratory well proves to be productive, it will be converted into a production well that will in incorporated into the Hawaii REGISTRATIONS County Department of Water Supply water system in the Kohala area. State of Hawaii, #7257 Professional Engineer Waimea River Diversions Prepare conceptual designs to monitor stream and ditch flows and modify stream diversions as required at the Koaie and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant. Monitoring concepts provided in two options. EDUCATION Option 1 should be real time recording and real time delivery and option 2 should be real time University of Hawaii at Manoa recording and real time delivery on an hourly basis. 1986, B.S. Civil Engineering Kahului Airport MBR Scalping One airport-wide wastewater scalping plant to extract wastewater from the sewer system and produce R-1 water for the end users. Produce grading, erosion and sediment control during QUALIFICATIONS &TRAINING construction activities, coordinate with HDOT on locations for laydown and staging areas, re- Maritime Security Awareness moval and replacement of existing asphalt, trenching for underground piping and surface res- Training (MARSEC) toration. Two existing gravity sewer mains shall be connected to a new manhole installed up- stream of the existing Sanitary Manhole 2 with two submersible wastewater pumps to feed Transportation Worker wastewater from the collection system to the scalping plant for treatment. Identification Credential (TWIG) Queen Emma Land Company Water Study Inventory previous work and further research previously identified water sources. Determine how much water can be obtained from sources on and off the QELC property, determine the projected water needs for the planned development and develop a water strategy which in- cluded identifying all options for water sources and the associated costs. Project also in- volved the evaluation of existing wells including review of CWRM regional well data, video documentation, water-quality sample collection, and water-quality testing parameters. .y ,1 I:2 ,; AKI NAKA W. ROY HARDY, P.E. C&OASSIOC�IATESdINTD �,� SENIOR PROJECT MANAGER 0 ` M (0) 1100 Alakea Street #1800 (808) 836-1900 ext. 656 wrh@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE Roy has over 33 years of experience in civil engineering specializing in water resource Akinaka &Associates, Ltd. engineering and management for the Commission on Water Resource Management. He was Senior Project Manager responsible for protecting ground waters of the State of Hawaii through the establishment of 2021 - Present sustainable yields, developing the Hawaii Well Construction and Pump Installation Standards, implementing regulatory well construction, pump installation, and ground water use permitting, and organizing data reporting for production and long-term monitoring wells in the State. He is State of Hawaii responsible for project engineering details specializing in water resource source, capacity, and Commission on Water distribution. Resource Management PROJECT EXPERIENCE Ground Water Hydrologic Kaanapali Land Management - Irrigation System Program Manager Reviewing the current irrigation systems and provide an overall evaluation of the system infra- 1988 to 2021 structure based on available information from KLM. Assist KLM in developing strategies relat- ed to CWRM IIFS for Honokowai Stream, Honokohau Stream and Honokohao Ditch. Review of irrigation needs analysis and recommend strategy for developing irrigation systems to sup- REGISTRATIONS port future needs, creating a wastewater reuse strategy, including where and when reuse State of Hawaii, #7548 should be considered. Professional Engineer Lalamilo 10MG Reservoir The design and construction of a 10 million gallon reinforced concrete reservoir and related EDUCATION appurtenances in the Lalamilo area on the island of Hawaii. Tasks included preliminary grad- Santa Clara University ing and site layout plan, working with the Department of the Army regarding UXOs, geotech- 1986, B.S. nical report, provide an energy analysis/report for the Lalamilo System with the added storage Civil Engineering capacity, securing all necessary approvals and permits, assistance in the bidding phase and limited construction management services including review of RFIs and submittals, and the preparation of as-built plans. University of Hawaii at Manoa 1987, M.S. Mahanalua Nui Water System Civil Engineering Installation and/or upgrade of treatment facilities, storage facilities, pump stations and trans- Water Resources mission and distribution mains. It also involved the installation or security at drinking water systems, such as fencing, lighting, motion detectors and/or cameras, replacement of water meters and interconnection of the water system with other public water systems. Miki Basin 200 Acre Industrial Park Pulama Lanai is planning to rezone approximately 200 acres of agricultural zoned lands to in- dustrial land use in anticipation of developing an energy and other uses park. Tasks included identifying water source capacity, calculating future water and wastewater demand based on anticipated lot usage, identifying offsite improvements required to service the development, preparing maps of the existing and proposed water system. Queen Emma Land Company Water Study Inventory previous work and further research previously identified water sources. Determine how much water can be obtained from sources on and off the QELC property, determine the projected water needs for the planned development and develop a water strategy which in- cluded identifying all options for water sources and the associated costs. Project also in- volved the evaluation of existing wells including review of CWRM regional well data, video documentation, water-quality sample collection, and water-quality testing parameters. n ' AKINAKA P Fr &ASSOCIATES LTD. GAV I N M. G A N A L, 1 .L. CONSULTING CIVIL h,,Ea PROJECT ENGINEER It wit 1100 Alakea Street #1800 (808) 836-1900 ext. 664 gmg@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE Gavin assists in the technical design of projects in addition to the production of reports, Akinaka &Associates, Ltd. exhibits, permits and construction plans, specifications and estimates. Project Engineer 2011 - Present PROJECT EXPERIENCE Galbraith Estate Reservoirs Civil Engineer 2006 2011 Design of two reservoirs (3.0MG and 10.0MG) as in-ground, lined reservoirs to serve agricultural purposes. The reservoir design was limited to at-grade and below-grade grading, Intern reservoir lining and capacity calculations. During the construction, the firm prepared con- 2000 - 2005 struction contract documents for bidding, including construction plans, specifications and quantity take-offs, cost estimates and bidder's proposal schedule. REGISTRATIONS Puako Waterline Replacement State of Hawaii, #14527 This project involved the design of new waterline along Puako on the island of Hawaii. Im- Professional Engineer provements also included an Archaeological Monitoring Plan, coordination with DWS, the re- placement of approximately 10,000 linear feet of waterline with external corrosion protection, EDUCATION acquiring the necessary permits (NPDES and SHPD) and the development of plans, specifica- University of Hawaii at Manoa tions and cost estimates. 2005, B.S. Civil Engineering Pua Peterson Sewer Rehabilitation Planning and design services for the Pua Peterson Sewer Rehabilitation. Project involved the design of 3,800 linear feet of 8", 10", 12" & 16" PVC sewer main, inspection of 20 manholes, and design of CIPP lining. The reports and permits involved included Historic Site Review, Variation from Pollution Controls, Street Usage Permit, Permit to Discharge Effluent, Grubbing, Grading & Stockpiling Permit and Permit to Excavate in Public Right of Way. Water/Wastewater Due Diligence for the Acquisition of the Mauna Lani Resorts & Properties To review the current potable and non-potable water systems; engineering design and reports, provide analysis of system and possible opportunities for water system growth and expansion. Project involved the determination if there will be enough potable water available to the proper- ties and facilities in Mauna Lani Resort. In order to do that two types of potable water was measures: 1) the water use of existing properties and facilities and 2) potential water use of currently unbuilt properties. In addition, the project involved the evaluation of whether or not the existing wastewater treatment plant would be able to accommodate future flows from the currently unbuilt properties and options for disposal of the additional wastewater effluent. r;'4'w,4-„.0' q s s,w �: ,� AKI 2NAKA �o> i v` y &ASSOCIATES LTD. KEVIN J. MEAGHER, E.I.T. CONSULTINGCIVILEN ,,,9RS JUNIOR ENGINEER / r ¶ , Q k, M :Mr ee: 1100 Alakea Street #1800 (808) 836-1900 ext. 652 kjm@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE As a Junior Engineer, Kevin is responsible for the production of various reports, exhibits, plans Akinaka &Associates, Ltd. and AutoCAD files. Junior Engineer December 2020 to Present PROJECT EXPERIENCE Kahului Airport MBR Scalping Integrity Municipal One airport-wide wastewater scalping plant to extract wastewater from the sewer system and Systems LLC produce R-1 water for the end users. Produce grading, erosion and sediment control during Applications Engineer construction activities, coordinate with HDOT on locations for laydown and staging areas, 2017 to 2019 removal and replacement of existing asphalt, trenching for underground piping and surface restoration. Two existing gravity sewer mains shall be connected to a new manhole installed upstream of the existing Sanitary Manhole 2 with two submersible wastewater pumps to feed wastewater from the collection system to the scalping plant for treatment. EDUCATION University of California, Kanalani Street Extension Los Angeles 2016, Bachelors of Science Construction of a new roadway that would allow for the development of a 40-acre land parcel. Chemical Engineering Sewer, water and fire hydrants constructed as part of the new roadway, design of a two-lane roadway with traffic in both directions, installation of catch basin filters and inlet along with installation of waterline and fire protection. 1234 Matlock Avenue Project involved construction of site improvements including grading and water, sewer and drainage related infrastructure. Drainage design will include the design of erosion control measures during construction activities. In addition, project involved the design of water quality BMPs, coordination with DPP for plan review and approval and the preparation of a Storm Water Quality Report. Waimea River Diversions Prepare conceptual designs to monitor stream and ditch flows and modify stream diversions as required at the Koaie and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant. Monitoring concepts provided in two options. Option 1 should be real time recording and real time delivery and option 2 should be real time recording and real time delivery on an hourly basis. BWS Kalawahine 180' Reservoir Design of a reinforced concrete reservoir, instrument house, 24" transmission main, irrigation, access road improvements, retaining rock wall, installation of new curb ramps and modifica- tions of existing curb ramps. The waterline design crossed over a stream, which lead to horizontal drilling. p( . ..... 5 r 6 ,,,. ) .....„... ., A K I N A KA a AUSTIN K. INOUYE &ASSOCIATES LTD. ° � �,' J ,':: CONSULTING CIVIL ENG�INEE RS e ��m JUNIOR ENGINEER Q k, M as: 1100 Alakea Street #1800 (808) 836-1900 ext. 654 aki@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE As a Junior Engineer, Austin is responsible for the production of various reports, exhibits, Akinaka &Associates, Ltd. plans and AutoCAD files. Junior Engineer June 2020 to Present PROJECT EXPERIENCE Department of Education EIS for East Maui Water Lease Part Time Teacher Describe/assess performance of system, EMI system inventory and additions to inventory July 2019 to June 2020 mapping, added alternative for the DEIS, and support to respond to DEIS comments University of Hawaii at Hilo Kaanapali Land Management Corp.—Irrigation System Research Intern Review of current irrigation systems and provide an overall evaluation of the system infra- May 2019 to December 2019 structure, assist client in developing strategies for the Honokowai Stream, Honokohau Stream and Honokohao Ditch. Review irrigation needs analysis and recommend strategy for develop- ing irrigation systems to support future needs, assist in the creation of a wastewater reuse EDUCATION strategy, including where and when reuse should be considered University of Hawaii at Hilo 2020, B.S. Board of Water Supply Sanitary Survey Geology Sanitary survey inspection of water system and facilities services to the Board of Water Sup- ply, recommend corrective actions and conduct follow-up site inspections to ensure BWS fa- cilities are continually compliant with all federal and state sanitary survey and drinking water regulations QUALIFICATIONS &TRAINING Maritime Security Awareness Puako Waterline Replacement Training (MARSEC) Plans, specifications and cost estimate for the proposed water line. Consists of approximately Transportation Worker 10,000 linear feet of 8-inch and 12-inch distribution waterline along Puako Beach Drive and Identification Credential connections to the existing 12-inch waterline. The new waterline shall have external corrosion (TWIC) protection. Permits involved include SMA, NPDES and SHPD compliance. Waikiki-Kapahulu Library Design for the reconstruction and repaving of the parking lot, preparation of plans, specifica- tions and permits, topographic survey for the entire property, erosion sediment control plan and DCAB review Iwilei Area Sewer Improvements (Iwilei Road Diversion Sewer) - construct 8-inch diameter sewer and abandon old sewer lines (Aala Park and King Street Sewer Improvements) - replace sewer line through and fronting Aala Park on King Street, upsizing of sewer line and additional segments downstream to pro- vide capacity for the redevelopment of Mayor Wright housing (Kokea Street Diversion Sewer) - construct 12-inch diameter sewer and reconnect laterals to new sewer line M t'1` 5 .._ y......,..,,..,,‘,5,„. tv,,:i,i AKINAKA r \"g &ASSOCIATES LTD. BRYSONT. TAMAYE CONSULTING CIVIL ENGINEERS ,-,,, JUNIOR ENGINEER 0 ` IX< (0) 1100 Alakea Street #1800 (808) 836-1900 ext. 672 btt@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE As a Junior Engineer, Bryson is responsible for the production of various reports, ex- Akinaka &Associates, Ltd. hibits, plans and AutoCAD files. Junior Engineer May 2022 to Present PROJECT EXPERIENCE Lalamilo 10 MG Reservoir R.M. Towill Construction of a 10-million gallon reinforced concrete reservoir and related appurtenances Student Intern including necessary site improvements, topographic survey, preliminary grading and site lay- May 2021 to August 2021 out plan, geotechnical report for the purpose of constructing a 1 o MG reinforced concrete res- ervoir, energy analysis/report for the Lalamilo System with the added storage capacity, con- ducting an environmental assessment for the project in accordance with the requirements of Ace Auto Glass Chapter 343, HRS and Title 11, Chapter 200, HAR and other related requirements, and review Installer of requests for substitutions, requests for information, change order of proposals, etc. May 2019 to August 2020 North Kohala Water System Improvements To provide planning, design and construction services regarding the North Kohala Water Sys- EDUCATION tern. The project involved an environmental assessment, and design plans, specifications and University of Portland cost estimate, and obtaining the necessary permits for an exploratory well in the Kohala area 2022, Bachelors of Science that could potentially provide water for agricultural use. If the exploratory well proves to be productive, it will be converted into a production well that will in incorporated into the Hawaii Civil Engineering County Department of Water Supply water system in the Kohala area. Deep Monitor Wells QUALIFICATIONS &TRAINING Goal of the project is to the stop the flow of freshwater up into the seawater zone in the Keopu ESCP Coordinator Certification Deep Monitoring Well (DMW). The project involved the repair/renovation of the Keopu DMW by Fall Protection Certified Person installing a well casing and screen in the deep freshwater zone, and sealing the well boring above the screen. In addition, repair and deepen up to three additional existing/unused moni- toring wells, explore the extent of the deep freshwater resource to the north and south of the two wells and expand the Commission on Water Resource Management's (CWRM) network of usable deep monitoring wells in the Kona/Keauhou Aquifer area. BWS Kalawahine 180' Reservoir Design of a reinforced concrete reservoir, instrument house, 24" transmission main, 8" distribution main, irrigation, access road improvements, retaining rock wall, instal- lation of new curb ramps, modification of existing curb ramps. There were a lot of existing utilities in a highly travelled corridor. The waterline needed to be bypassed to maintain service during construction and the utilities could not meet the current clear- ances. In addition, the waterline crossed over a stream, which lead to horizontal drill- ing. Akinaka & Associates, Ltd. negotiated with the city agencies to lessen the clear- ances required in between the waterline and sewer line. In addition, concrete jackets were also placed on the waterline to provide protection. 6 z �.. . AKINAKA RYDEN G. QUITORIANO &associares �T�. CONSULTING CIVIL ENG�I NEER. JUNIOR ENGINEER �I .► E O ` > ) 1100 Alakea Street #1800 (808) 836-1900 ext. 688 ahc@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE As a Junior Engineer, Ryden is responsible for the production of various reports, Akinaka &Associates, Ltd. exhibits, plans and AutoCAD files. Junior Engineer December 2024 to Present PROJECT EXPERIENCE North Kohala Water System Improvements Akinaka &Associates, Ltd. To provide planning, design and construction services regarding the North Kohala Intern Water System. The project involved an environmental assessment, and design plans, 2022 to 2024 specifications and cost estimate, and obtaining the necessary permits for an explora- tory well in the Kohala area that could potentially provide water for agricultural use. If the exploratory well proves to be productive, it will be converted into a production well that will in incorporated into the Hawaii County Department of Water Supply water EDUCATION system in the Kohala area. University of Hawaii at Manoa 2024, Bachelors of Science Lalamilo 10 MG Reservoir Civil Engineering Construction of a 10-million gallon reinforced concrete reservoir and related appurte- nances including necessary site improvements, topographic survey, preliminary grad- ing and site layout plan, geotechnical report for the purpose of constructing a 1 o MG QUALIFICATIONS &TRAINING reinforced concrete reservoir, energy analysis/report for the Lalamilo System with the ESOP Coordinator Certification added storage capacity, conducting an environmental assessment for the project in accordance with the requirements of Chapter 343, HRS and Title 11 , Chapter 200, HAR and other related requirements, and review of requests for substitutions, re- quests for information, change order of proposals, etc. Kuhio Highway Resurfacing Resurfacing of a portion of Kuhio Highway from Princeville to Waikoko. Project will also include the installation of sidewalks, raised crosswalks and crosswalk alert light- ing as well as installation of guard rails for portions of the highway. Preparation of Federal-Aid PS&E documents for bid including completing the PS&E and assisting the Kauai District through the bidding process, provide public meeting support and civil engineering support during the post-design services of the project. t. 111111 �(• AKINAKA h. REID I. TAKASAKI &ASSOCIATES LTD. / CONSULTING CIVIL ENGINEERS * ,.° JUNIOR ENGINEER i 0 ` (0) 1100 Alakea Street #1800 (808) 836-1900 ext. 681 rit@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE As a Junior Engineer, Reid is responsible for the production of various reports, exhib- Akinaka &Associates, Ltd. its, plans and AutoCAD files. Junior Engineer 2023 - Present PROJECT EXPERIENCE Deep Monitor Wells Goal of the project is to the stop the flow of freshwater up into the seawater zone in EDUCATION the Keopu Deep Monitoring Well (DMW). The project involved the repair/renovation of Arizona State University the Keopu DMW by installing a well casing and screen in the deep freshwater zone, 2022, B.S. and sealing the well boring above the screen. In addition, repair and deepen up to Aerospace Engineering three additional existing/unused monitoring wells, explore the extent of the deep fresh- water resource to the north and south of the two wells and expand the Commission QUALIFICATIONS &TRAINING on Water Resource Management's (CWRM) network of usable deep monitoring wells in the Kona/Keauhou Aquifer area. ESCP Coordinator Iwilei Area Sewer Improvements Address current maintenance issues and to accommodate capacity for the future de- velopment within the lwilei and Kalihi areas. Construction of new sewer line and man- holes, replacement of sewer line in addition to upsizing current sewer line. Waiawa Hydroelectric Plant Improvements Design for the hydroelectric improvements and accessories required including the penstock, new building and return back into the ditch. Coordination of topographic survey and geotechnical investigation. Preparation of an Environmental Assessment Report. Preparation of bidding and construction documents. Kaloko Deep Monitor Well Video and CTD logging of the Kaloko Deep Monitoring Well to help decide whether to finish sealing of freshwater portion of the well. Finish construction of the deep moni- toring well to isolate deep confirmed freshwater aquifer. CTD profile logging, video profile logging during and 1-post conditions, and document results. I j INA ANDREW H. CHEN AKI9,5W1 CA JUNIOR ENGINEER :11: 1100 Alakea Street #1800 (808) 836-1900 ext. 685 ahc@akinaka.com www.akinaka.com Honolulu, HI 96813 EXPERIENCE As a Junior Engineer, Andrew is responsible for the production of various reports, ex- Akinaka &Associates, Ltd. hibits, plans and AutoCAD files. Junior Engineer January 2025 to Present PROJECT EXPERIENCE Akinaka &Associates, Ltd. Pulehunui Well Water Source and System Development Intern This project has multiple phases. Phase 1 : Site Selection Study which includes deter- 2020 to January 2025 mining state project demands and potential well sites along with a well site selection study. Phase 2: Water Resource Development Report including identifying the poten- tial long-term viability and infrastructure improvements, determine well water quality EDUCATION and well yields, and determine location of additional wells. Phase 3: Exploratory Well University of California, Design including preliminary selected well site design, identifying and processing well Berkeley construction and pump installation permits, coordination with sub-consultants and 2022, Bachelors of Science Civil Engineering final general well design. Stanford University Makena Mauka Water Resources Report 2024, Masters The project includes research existing site for information on water utilities and Environmental Engineering reports within the area, site visits, review past reports and public information from DLNR CWRM, coordination with existing local water related agencies and utility companies and cumulative drinking water impacts from other nearby Makena QUALIFICATIONS &TRAINING projects. ESCP Coordinator Certification East Maui Irrigation Stream Diversion Modifications and Abandonments Tasks include regulatory approvals for the work on 27 stream diversions modifica- tions and abandonments. Project also include site plan approvals, SMA Assessment Application to confirm no SMA permit is required for stream diversions, obtain concurrence from the U.S. Army Corps of Engineers, DOH Clean Water Branch approval of a BMP plan for the work designed to minimize impacts on water quality, consultation with the County of Maui Planning Department to confirm no flood control issues, and schedule for completion of the project.