Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> (Complete one Section E for each key person.) <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE <br /> Gavin M. Gana!, P.E. Project Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 23 23 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Akinaka &Associates, Ltd. — Honolulu, Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> University of Hawaii at Manoa, 2005, BS, Civil State of Hawaii, P.E., License#14527, 2011 <br /> Engineering <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Water Works Association <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Water Main Replacement at Various Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> a. <br /> Honolulu, Hawaii 2011 2016 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Water main replacements for various streets including installation of pipe locator devices along pipeline alignment when <br /> pipe material is PVC pipe,traffic control plans for work with City jurisdiction, NPDES permit. <br /> Project Role: Project engineer <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Kakaina Subdivision PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Waimanalo, Hawaii 2011 2016 <br /> b• (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Design of a 45-lot subdivision. Improvements included relocation of a 20" Board of Water Supply CCP main located <br /> partially on Department of Hawaiian Homelands land, design of an underground detention system on an infill subdivision <br /> to maximize the number of lots and connection of drain system to an existing concrete lined channel. Project Role: <br /> Project engineer <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Maunawili Elementary Campus Replace Waterlines PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> c. Maunawili, Kailua, Hawaii 2012 Estimated 2018 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Replacement of waterlines and analyzing fire protection and coordinating with the fire department. <br /> Project Role: Project engineer <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Waimanalo Elementary Miscellaneous R&M PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) <br /> d. Waimanalo, Hawaii 2012 2017 <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Replacement of existing waterline, existing ceiling fans and existing fire alarm system. <br /> Project Role: Project engineer <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Waiola Subdivision Phase 1, 2 &3 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> e. Waiola, Kauai, Hawaii 2010 On-going <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Design of subdivision including lot/road layout, grading, utility design, erosion control and sewer pump station design. <br /> Project Role: Project engineer <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 5 <br />