Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Kevin J. Meagher Junior Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 8 5 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Akinaka &Associates, Ltd. — 1100 Alakea Street, Suite 1800— Honolulu, Hawaii 96813 <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> University of California Los Angeles, 2016, B.S., Chemical N/A <br /> Engineering <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Council of Engineering Companies of Hawaii, American Water Works Association <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Kulani Correctional Facility Water Study PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hilo, Island of Hawaii 2019 2022 <br /> a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Repair of a leak within the water distribution system,evaluate and improve the existing roof top catchment system, <br /> evaluate and improve the existing storage system with the facility as well as evaluate and recommend options to <br /> increase treatment of potable water for the facility Project Role: Engineering support <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> 1234 Matlock Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Honolulu, Hawaii 2021 On-going <br /> b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Construction of site improvements including grading and water,sewer and drainage related infrastructure. Drainage <br /> design includes the design of erosion control measures during construction,design of water quality BMPs, coordination <br /> with DPP for plan review and approval and preparation of a Storm Water Quality Report. <br /> Project Role: Engineering support <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> BWS Kalawahine 180' Reservoir 2018 On-going <br /> Honolulu, Hawaii <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> c. <br /> Design of a reinforced concrete reservoir, instrument house,24" transmission main, irrigation access road <br /> improvements, retaining rock wall, installation of a new curb ramps and modifications of existing curb ramps. The <br /> waterline design crossed over a stream,which lead to horizontal drilling. <br /> Project Role: Engineering support <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) <br /> Waimea Steam Diversion 2017 NA <br /> Waimea, Kauai, Hawaii <br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Design modifications to stream diversions at the Koaie Stream,Waiahulu Stream, and Waimea River on Kauai. <br /> Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie <br /> and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP). <br /> Project Role: Engineering support <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Kanalani Street Extension 2018 2022 <br /> Island of Hawaii <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> e. <br /> Construction of a new roadway that would allow for the development of a 40-acre land parcel. Sewer,water and fire <br /> hydrants constructed as part of the new roadway, design of a two-lane roadway with traffic in both directions installation <br /> of catch basin filters and inlet along with installation of waterline and fire protection. <br /> Project role: Engineering support <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 7 <br />