|
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Codee Samala-Passos, P.E. Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 8 1
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> B.S.,2014,Seattle University,Civil and Environmental Engineering Hawaii,Registered Professional Engineer(PE 21241)
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • OSHA 24-Hour HAZWOPER • 40-Hour Envirostat,Inc.
<br /> • DOT 40-Hour HAZWOPER • Sampling for Defensible Environmental Decisions,
<br /> • 40-Hour RCRA DoD Interservice Environmental Education Review
<br /> • American Heart Association BLS/CPR • Board(ISEERB)Trainings
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> EPA Compliance,Storm Water Management Program for the Island of 0`ahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> State of Hawaii Department of Transportation(Honolulu,Hawaii) On-going
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Engineering design and regulatory compliance services for the State of Hawaii Department of Transportation to address storm water management
<br /> requirements mandated by the NPDES MS4 Permit.Provide support for the erosion control,erosional outfall,and permanent best management practices
<br /> programs.Serves as project engineer for erosion control and permanent best management practices for stormwater quality.$36,000,000
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Miscellaneous Storm Drain Improvements Projects,State of Hawaii Department PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> of Transportation—Highways Division,Maui District(Kahului,Hawaii) On-going
<br /> b• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Provides engineering design services for improvements to existing drainage structures of the HDOT Maui District MS4.Improvements included repair and
<br /> raising existing grated inlets,raising existing manholes,pavement restoration,and repairing existing pipe connections.$25,000,000
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Compliance&Emergency Response Oversight, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Pearl Harbor Naval Shipyard(Honolulu,Hawaii) 2024
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm
<br /> C• Served as Supervisory Environmental Protection Specialist overseeing environmental compliance,engineering support,and emergency response operations
<br /> for the Pearl Harbor Naval Shipyard.Led a multidisciplinary team in planning and executing environmental programs,including hazardous substance spill
<br /> response,stormwater management,and compliance with federal and state regulations.Developed and tracked multi-year budgets,procured environmental
<br /> engineering services,equipment,and consumables,and ensured technical accuracy and timely delivery of projects.Represented the naval shipyard in
<br /> regulatory negotiations,coordinated inspections,and supported infrastructure resilience through participation in major emergency response drills.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Stormwater Compliance&Erosion Control Enhancements, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> The Limtiaco Consulting Group(Honolulu,Hawaii) 2019
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm
<br /> d. Served as Project Engineer supporting the City&County of Honolulu's compliance with NPDES stormwater and construction dewatering permit
<br /> requirements.Coordinated and conducted erosion and sediment control inspections,enforced compliance with Federal,State,and City stormwater
<br /> regulations,and trained construction personnel on BMP implementation.Developed,reviewed,and improved technical documents—including ESCPs,
<br /> LID Plans,and SWPPPs—and presented updated SWPPP guidance to over 200 professionals at the City's annual Stormwater Workshops.Led internal
<br /> audits and gap analyses,recommended corrective actions,and developed training programs to enhance compliance and regulatory understanding across
<br /> engineering,inspection,and construction teams.
<br /> STANDARD FORM 330(REV.7/2021)
<br />
|