Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025-06-23 PL-INT-2025-010806 EnviroServices & Training Center, LLC - Category PL.5
DeVera, Ashley From: Haryson Lum <hlum@gotoetc.com> Sent: Monday, June 23, 2025 12:13 PM To: Planning Internet Mail Subject: Submittal for Professional Services FY2026— EnviroServices &Training Center Attachments: EnviroServices_SF330_FY 2026.pdf Aloha Mr. Darrow, EnviroServices &Training Center, LLC is pleased to submit our qualifications for consideration on upcoming County of Hawaii, Planning Department projects in the following category: PL.5) Community Planning(Environmental Planning, Environmental Assessments, Environmental Impact Statements) We've attached our submittal for your review. Kindly confirm receipt of this email at your earliest convenience. Please feel free to reach out if any additional information is needed. Mahalo for your consideration! Haryson Haryson Lum Business Development & Marketing Specialist 505 Ward Avenue, Suite 202, Honolulu, HI 96814 (808) 839-7222 ext 264 www.gotoetc.com i. JUNE 2025 Submittal Packet for: SFY26 ANNUAL NOTICE TO PROVIDERS OF PROFESSIONAL SERVICES Prepared for: The County of Hawaii Planning Department 101 Pauahi Street, Suite 3 Hilo, Hawaii 96720 oot- y),F OF enviro EnviroServices&Training Center,LLC Phone:(808)839 7222 �. � 505 Ward Avenue,Suite 202 Email:info@gotoetc.com �� SERVICES Honolulu,Hawaii 96814 Website:www.gotoetc.com June 30,2025 i /S, enviro County of Hawaii SERVICES &TRAINING CENTER,LLC Planning Department 101 Pauahi Street,Suite 3 Hilo,Hawaii 96720 Attention: Mr.Jeffrey Darrow,Planning Director Subject: Letter of Interest—Professional Services for Fiscal Year 2026 EnviroServices&Training Center,LLC(ETC)is pleased to express our interest in supporting upcoming County of Hawaii, Planning Department projects in the following service category: PL5)Community Planning (Environmental Planning,Environmental Assessments,Environmental Impact Statements) As Hawai`i's leading environmental engineering and consulting firm since 1994,ETC offers a full spectrum of services rooted in local knowledge and technical excellence.The past two years,we were honored to be recognized by Pacific Business News as Hawai`i's#1 Environmental Consulting Firm and among the state's leading Engineering Firms(#17).Our in-house team includes three licensed Professional Engineers(PEs)and a multidisciplinary group of scientists,technicians,and field specialists.Our capabilities include: Civil&Environmental Engineering • Infrastructure Design—Water and wastewater systems,site grading and drainage improvements,pavement design and rehabilitation • Environmental Protection&Compliance—Stormwater system design and management,erosion control and sedimentation planning,regulatory permitting and environmental documentation Additional Environmental Services • Environmental Compliance—Environmental Management System(EMS)development,Spill Prevention Control & Countermeasure(SPCC) planning,water quality testing,compliance audits&training • Stormwater Management—NPDES(MS4,industrial,construction,dewatering),BMP planning,Geographic Information System (GIS) &Asset Management • Site Investigation&Remediation—Phase I—Ill ESAs,Underground Storage Tank(UST)closures,hazard evaluation and management,environmental remediation planning and implementation • Solid&Hazardous Waste Management—Waste characterization,disposal logistics,cleanup oversight • Industrial Hygiene—Hazardous material surveys(asbestos, lead,arsenic),abatement design&oversight,indoor air quality testing &monitoring • Drinking Water Quality Compliance—EPA Lead &Copper Rule Revisions(LCRR),service line inventory development,customer tap water sampling &reporting Enclosed is the requested submittal for your review.Should you have any questions,please contact me at kmorikuni@gotoetc.com or by phone at(808)839-7222.We appreciate the opportunity to support County of Hawaii initiatives and look forward to continuing our work together. Aloha, ff),i, . Kyson Morikuni Managing Principal EnviroServices&Training Center,LLC • 505 Ward Ave.,Suite 202, Honolulu, HI 96814 • (808)839-7222 • www.gotoetc.com ,-#Ii. envi ro EnviroServices&Training Center,LLC 505 Ward Avenue,Suite 202 41111 SERVICES ( ) Honolulu,®Hagotoet 6814 808 839-7222 info otoetc.com ARCHITECT — ENGINEER QUALIFICATIONS PART I-CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.TITLE AND LOCATION(City and State) SFY26 ANNUAL NOTICE TO PROVIDERS OF PROFESSIONAL SERVICES (County of Hawaii) 2.PUBLIC NOTICE DATE 3.SOLICITATION OR PROJECT NUMBER B. ARCHITECT—ENGINEER POINT OF CONTACT 4.NAME AND TITLE Kyson Morikuni,Managing Principal 5.NAME OF FIRM EnviroServices&Training Center,LLC 6.TELEPHONE NUMBER 7.FAX NUMBER 8.E-MAIL ADDRESS (808)839-7222 (808)839-4455 kmorikuni@agotoetc.com C.PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 8t, 9.FIRM NAME 10.ADDRESS 11.ROLE IN THIS CONTRACT ?F_m a < ce a�i— EnviroServices & w Environmental Engineering q Training Center, LLC fj — 4%.,- &Consulting Services: a.: --- - - • Environmental Engineering j�liM' • Environmental Compliance • Stormwater Management Honolulu Office(Main) • Drinking Water Quality a. X 505 Ward Avenue,Suite 202 Compliance (LCRR) Honolulu,Hawaii 96814 • Solid &Hazardous Waste Pearl City Office Management 96-1272 H a Street • Site Investigation,Assessment, Pearl Cityy,,Hawawai 196782 and Remedial Action Maui Office • Industrial Hygiene 270 Waiehu Beach Road,Suite 113 CHECK IF BRANCH OFFICE Wailuku,Hawaii 96793 • Compliance Training b. ❑ CHECK IF BRANCH OFFICE C. ❑ CHECK IF BRANCH OFFICE STANDARD FORM 330(REV.712021) D.ORGANIZATIONAL CHART OF PROPOSED TEAM i� enviro »> r� SERVICES s , _ 4 j' Be TRAINING CENTER,LLC pia Managing Principal 1- " . tir " "" Kyson Morikuni, B.A., MBA , r:000, ‘'... yPrincipal ,; it -w Michael Yee, B.S., M.P.H. + , Gregory Perry r Brant Tanaka, B.A., P.D. Damon Hamura, B.S.E. ` -10, t i Administrative isµ.. ..w „ . _... . _, . Anela Kealoha Bianca Kim Civil/Environmental Engineer GIS Specialist Brittney Kaaa-Sutton, B.B.A. Codee Samala-Passos, P.E., B.S. Aimee Zarzynski, B.A. Chelsie Statan, B.S., M.S. Joshua Burroughs, B.S. Casey Kawano, B.S. Haryson Lum, B.A. TrevorYatomi, EIT, B.S., M.S. Mikayla James, B.S. Mandee Duarte ZacharyNadamoto, B.S. Ryanne Gouveia,A.A. Geologist/ Sheena Diaz Construction Inspector Environmental Scientist Chase Yoshikawa Hayden Comerford, B.S. Aeronautical/ Clayton Akai, B.A., P.D. Katie Dungan, B.S. Environmental Engineer Curtis Laa Keoni Hill, B.S. Dustin Lau, B.A.A. Hydrologist/ Ian Mclean Sr. Environmental Scientist Biologist/ Kaleo Allado Matthew Tolley, B.S. Environmental Scientist Chris Gallacher, B.S., M.B.A. Ecologist/ HazMat Technician Daven Ruggles, B.S. Environmental Scientist John Pahia Katelyn Amoroso, B.S. Mailea Miller-Pierce, B.S., M.S., Ph.D. Kylie Luke, B.S. Michael Sua Biologist/Project Manager Project Manager/ Ty Liwis Tonya Ketza, B.S., M.S. Sr. Environmental Scientist Matt Stimpson, B.S. Industrial Hygienist CADD Technician Akari Ihara,A.A. Ladd Yoshimura Environmental Scientist Jacob Vasquez, B.S. Chelsea Kau, B.B.A. Stevie"Lamar"Ward,A.S. Chemist/ David Henderson, B.A. Sara Marvin, B.S. Environmental Scientist Julia Wicklund, B.S. Justin Penuliar, B.S. Kaiya-Marie Nobriga, B.S. IT Analyst Kawai Makuakane, B.S. Ikaika Honda,A.S. Sr.Civil/Environmental Engineer Krista Hiller B.S. Mark Ohigashi, P.E., B.S., M.S. Michael Yamada, B.S. Vijaya Tummala, P.E., B.S., M.S. Shawn Tanji, B.S. STANDARD FORM 330(REV.712021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Kyson Morikuni Managing Principal a.TOTAL b.WITHCURRENTFIRM 16 16 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.A. 2009,Claremont McKenna College,Science and Management • Hawaii,EnviroCert Certified Professional in Municipal Stormwater (Biotechnology)with a Leadership Sequence Management(CPMSM) M.B.A.,2015,University of Hawaii at Manoa,Shidler College of Business 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • 40-Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Protection Agency Compliance,Storm Water Management PROFESSIONAL SERVICES CONSTRUCTION(If apprcable) Program for the Island of 0`ahu,Department of Transportation(0`ahu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Served as Program Manager to the State of Hawaii Department of Transportation,Highways Division(DOT-HWYS)Storm Water Management Program. Provided compliance support for stormwater management requirements established in DOT-HWYS,Oahu District's National Pollutant Discharge Elimination System(NPDES)municipal separate storm sewer system(MS4)permit.In addition to the same compliance support services that ETC provided while under contract during the previous years,ETC's services have expanded to help address new and enhanced regulatory requirements.The new and enhanced requirements include:trash reduction,waste load allocation compliance,post-construction and permanent best management practice design/ construction/maintenance,compliance audit support,enforcement response for illicit discharges,Army Corp 404 permitting,Department of Health 401 Water Quality permitting,and mobile Asset Management System(AMS)integration.Program Manager.$36,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lead and Copper Rule Revisions(LCRR)Compliance, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Honolulu Board of Water Supply(0`ahu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Principal-in-Charge to the Honolulu Board of Water Supply's Lead and Copper Rule Revisions project.Provide consultation for compliance with the Environmental Protection Agency's 2022 update to the Lead and Copper Rule(LCR).Provide field investigations to determine materials of water-utility and customer-owned later connections and provide customer tap sampling to determine lead and copper levels to update and maintain the utility's Lead Service Line Inventory.Principal-in-Charge.$1,270,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Master Services Agreement for Stormwater Management Compliance Services, PROFESSIONAL SERVICES CONSTRUCTION(If apprcable) Waiahi Water Company,LLC(Kauai,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm C. Principal-in-Charge to the Waiahi Water Company's Stormwater Management Compliance Services project.Provide consultation for compliance with Hawaii Department of Health-issued Administrative Order on Consent.Represent Waiahi Water Company on matters pertaining to the issuance of its National Pollutant Discharge Elimination System Permit.Prepare an Alternatives Analysis to address discharge exceedances of turbidity and total recoverable aluminum for incorporation into a Corrective Action Plan.Principal-in-Charge.$63,600. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED State of Hawaii Department of Transportation's Storm Water Management PROFESSIONAL SERVICES CONSTRUCTION(If apprcable) Program Plan(Statewide,Hawaii) 2016 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Served as Technical Lead for the Reporting Program,Public Education and Outreach Program,Pollution Prevention Program,Illicit Discharge Detection and Elimination Program,Industrial and Commercial Activities Discharge Management Program,and the AMS for DOT-HWYS Storm Water Management d. Program Master Consultant contract. Prepared compliance reports submitted to the State of Hawaii Department of Health and the Environmental Protection Agency on behalf of DOT-HWYS. Public education program tasks include webpage hosting,social media,outreach events,and partnerships. Pollution Program responsibilities involve the regular inspection of MS4 structures and sweeping of State highways.Managed site investigations on industrial and commercial facilities to assess general good housekeeping practices and identify stormwater deficiencies.Oversaw the complaint and spill response program aimed to reduce the illicit discharge of pollutants.Guided the development of the AMS,an enterprise system that allows for the spatial analysis of stormwater related data.Provided training for neighbor island State personnel and contractors for construction BMPs.Inspected post- construction BMPs to monitor debris accumulation and recommended maintenance activities.Conducted active construction site inspections to ensure proper implementation and maintenance of BMPs.Led the review process and submission of comments for reissuance of the NPDES MS4 in 2013. Senior Environmental Scientist.$39,500,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Michael Yee Principal a.TOTAL b.WITH CURRENT FIRM 38 31 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,1986,University of Washington,Environmental Science • REHS/RS,National Environmental Health Association M.P.H.,1994,University of Hawaii at Manoa,Environmental Science • Registered Environmental Professional(REP),NREP • Certified Hazardous Materials Manager(CHMM),Academy of CHMM • Hawaii,Registered Safety Officer(RSO),IBOEHS 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • National&Hawaii Association of Environmental Professionals,Member • Lead Safety(29 CFR 1910.1025 and 1926.62)Certificate • Instructor at Univ.of Hawaii,School of Public Health&Leeward CC • OSHA Hazard Communication Standards • 40 Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate • DOT Hazard Awareness • 24 Hour HazMat Specialist Level(29 CFR 1910.120)Certificate • DOT Hazardous Materials Handling,Train-the-Trainer • 8 Hour Supervisor/Mgr.HAZWOPER(29 CFR 1910.120)Certificate • Industrial Fire Protection • American Red Cross First Aid and CPR Instructor • Driver Improvement Program 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Commercial Harbors Environmental Compliance Support Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Transportation-Harbors Division(Statewide,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Provided environmental engineering and compliance support services for the DOT-Harbors.Services include soil and groundwater(e.g.UST)investigations, storm drain outfall reconnaissance inventory and mapping,environmental management system(EMS)and construction inspector training,tenant best management practices(BMP)and construction inspections assistance,public outreach and involvement,illicit discharges review,stormwater management plan revisions,Asset Management System(AMS)enhancement,and stormwater compliance assistance.Contract Manager.$400,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Household Hazardous Waste(HHW)Collection&Disposal Program, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) City&County of Honolulu(Pearl City,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Conducted all HHW collections on Oahu since 1994,and developed an Operations Plan and Health and Safety Plan to obtain Solid Waste Permits from the Department of Health.Received,segregated,packaged,transported,and recycled/disposed waste in accordance with applicable DOT/EPA/OSHA regulations. Successfully collected hundreds of thousands of pounds of HHW such as paint and paint-related material,petroleum,aerosols,mercury,pesticides,herbicides, and fungicides that are hazardous because of their corrosive,reactive,flammable,or toxic characteristics.Contract Manager.$400,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Kapalama Incinerator,Off-Site Contamination Unit,Site Investigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) and Remedial Action(Honolulu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm c. Managed the collection of hundreds of surface and subsurface soil samples and analyzed for asbestos,dioxins/furans,and heavy metals.Excavated,packaged, transported,and disposed of thousands of tons of solid,hazardous,and radioactive wastes(e.g.soil,ash,and tritium).Conducted personal,perimeter,and work area air monitoring.Assessed off-site contamination concerns associated with historic operations.Compiled background information into a Summary Analysis Report,which was reviewed and accepted by the DOH,and submitted a Work Plan detailing on-site corrective actions to the DOH.Additional work included human health and environmental risk assessment,refined air dispersion modeling,and collection of samples from various matrices to assess impacts associated with the incinerator's stack outfall. Prepare EHMP,monitor temporary cover and maintain until start of planned site development.Contract Manager.$630,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Compliance Support Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Hawaii Army National Guard(Island of 0`ahu,Hawaii) 2015 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Z Check if project performed with current firm d• Managed the Hawaii Army National Guard(HIARNG)contract to correct deficiencies identified by a third-party external auditor in the National Guard Bureau Web Compliance Assessment and Sustainment Systems(WEBCASS).Conducted site visits to preemptively identify deficiencies in preparation for future government and internal inspections.Focused on subsequent corrective actions for hazardous materials management.Conducted training of personnel in order to ensure procedures,practices,and policies were implemented to achieve environmental program excellence.Revised the EMS program for facilities on Oahu,Hawaii,Maui,and Kauai.Contract Manager.$175,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Gregory Perry Principal a.TOTAL b.WITH CURRENT FIRM 37 31 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`j 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) 104 college credits,1979-1984,University of San Francisco and University of Hawaii,Business Administration 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • 40 Hour Initial/Current HAZWOPER(29CFR 1910.120)Certified Instructor • Permit-Required Confined Space Certified Instructor • 8 Hour Supervisor/Mgr.HAZWOPER(29 CRF 1910.120)Certificate • American Red Cross First Aid and CPR Certified Instructor • 24 Hour HazMat Specialist(29 CFR 1910.120)Certified Instructor • U.S.Army 40-hour EM-385 Construction Safety Training • Radioactive Material Shipping&Handling Certificate • OSHA 30-hour Construction Safety Training • DOT Hazardous Materials Handling,Train-the-Trainer • Building Industry Association of Hawaii,2005,Member • DOT Hazardous Materials Technical Consultant for Young Brothers,LLC 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Household Hazardous Waste Collection and Disposal Services for Department PROFESSIONAL SERVICES CONSTRUCTION(If applicable) of Environmental Management,Solid Waste Division(County of Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Developed and implemented an island-wide HHW program for the County of Hawaii.Provided public education and responded to inquiries from residents of the County of Hawaii.Developed the Operations Plan and Safety Plan.Coordinated collection dates,times,and locations in accordance with Solid Waste Permit.Collected,identified,segregated,packaged,labeled,transported,and disposed of>100,000 pounds of HHW annually.Waste streams included flammable gases/liquids/solids,oxidizers,organic peroxides,poisons,acids,bases,mercury-containing lamps and equipment,batteries,and used oil. Complied with applicable Department of Transportation regulations.Project Manager.$800,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Fixed Price Remedial Action Contract(FRAC)for Various Sites in the Naval PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Facilities Engineering Command Pacific(NAVFAC Pacific)Area of Responsibility On-going 2022 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Managed ETC's formation of a joint venture,EATC JV,and for an awarded contract to support the environmental remedial action program at various sites in the NAVFAC Pacific AOR.Performing services at various sites,primarily on the Island of Oahu and Guam.Conducting removal actions such as excavation and disposal of soil,closing fuel storage tanks,on-going monitoring well sampling and gauging,preparing appropriate documentation of planned and completed actions,and performing long-term management of other related activities.Site Superintendent/Remediation Manager.$1,835,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Hazardous Waste Removal for Various Departments of Education Schools PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) On-going c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provides the DOE with environmental support services on an as-needed basis.Performs identification(including sampling and analysis),packaging, transportation,and disposal of various types of solid and hazardous waste throughout the State of Hawaii school system.Additionally,provides emergency spill response and post-cleanup sampling,analysis,and air monitoring to document cleanup efforts.Project Manager.$1,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Solid and Hazardous Waste Management and Related Environmental Compliance PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Services for Hawaii Pacific Health(Honolulu and Island of Kauai,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm d. Performs audits at all HPH medical centers to determine if hazardous materials were being stored properly.Determine which solid waste the hospital generates is a RCRA regulated hazardous waste and universal waste.Based on the findings of the audits,each hospital's hazardous waste generator status is determined,and a training class is developed to educate hospital staff on the rules and regulations and new procedures needed for compliance.Package,transport,and safely dispose of approximately 20 tons of solid and hazardous waste,universal waste,and recyclable materials from the H PH facilities annually.Project Manager.$300,000/year. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Hazardous Materials Sampling and Transportation US ARMY Installations PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Islands of 0`ahu and Hawaii) On-going e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE P , ® Check if project performed with current firm Sample,analyze,package,create waste profiles,and transport all waste stored at the US Army 90 day storage sites located throughout the State of Hawaii.Waste streams managed under this contract included pesticides,paint-related materials,petroleum,unknowns,and other solid and hazardous wastes.Project Manager.$300,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Brant Tanaka Principal a.TOTAL b.WITH CURRENT FIRM 34 22 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.A.,1988,University of Washington,Geology and Earth Sciences • Registered Safety Officer(RSO),IBOEHS P.D.,1991,University of Hawaii at Manoa,Secondary Science • Certified Indoor Environmentalist,CIE 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • American Industrial Hygiene Association,Hawaii Section Director(former) • Indoor Air Quality Association,Member • State of Hawaii Environmental Council,Council Member(former) • 40 Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate • Am.Conference of Governmental Industrial Hygienist,Member • 8 Hour Supervisor/Mgr.HAZWOPER(29 CFR 1910.120)Certificate 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Consulting Services,Maui District MS4 Program PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Island of Maui,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm ETC was contracted to provide environmental compliance support to the State of Hawaii Department of Transportation(DOT),Highways Division,Maui District a• (HWY-M)to meet stormwater compliance requirements associated with their municipal separate storm sewer system(MS4).Specifically,HWY-M was issued an NPDES M54 permit that required them to develop and implement control measures to prevent polluted runoff from entering and discharging from their MS4. Specifically,ETC helped to establish and implement:construction design procedures to ensure appropriate sediment and erosion control measures on HWY-M construction projects;construction inspection and enforcement procedures to manage compliance with sediment and erosion control requirements;inspection and maintenance of M54 structures and roadways;procedures to respond to and enforce against illicit discharges and illegal connections;GIS mapping of M54 structures and roadways;public education and outreach programs to provide awareness and training to targeted audiences that included contractors,DOT personnel,maintenance staff,industrial and commercial businesses,schools,and other stakeholders;and an Asset Management System to track and monitor compliance of the various control measures.Program Manager.$25,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Engineering Management at Daniel K.Inouye International PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Airport and Kahului Airport(Honolulu and Kahului,Hawaii) 2022 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b• ETC was contracted to provide a broad range of continuous support services that included environmental engineering management,design,inspections,and compliance services with an emphasis on municipal separate storm sewer system(MS4)requirements at various airports Statewide.Specifically,provided technical expertise to meet and implement National Pollutant Discharge Elimination System(NPDES)control measure requirements that included public education and outreach,illicit discharge detection and elimination,construction site runoff control,post-construction stormwater management,pollution prevention,industrial and commercial discharge management,and monitoring.Services also included support on an array of other environmental compliance matters,such as underground injection wells,underground storage tanks,spill prevention control and countermeasure,hazardous materials removal and disposal,site screening and soil sampling,groundwater well monitoring,Environmental Hazard Evaluation(EHE)/Environmental Hazard Management Plan (EHMP),environmental mapping/GIS,and asset management system integration.Program Manager. $9,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED State of Hawaii Department of Transportation's Storm Water Management PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Program Plan(Statewide,Hawaii) 2016 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provided State of Hawaii Department of Transportation(DOT)compliance support for the stormwater management requirements mandated in the agreement c, between the DOT and the Environmental Protection Agency(EPA)and Hawaii Department of Health(Consent Decree),and the DOT Highways Division Oahu District's NPDES MS4 permit.Ensured that all stormwater management requirements were met.These requirements included:implementing pollution prevention best management practices(BMPs),designing erosion control slope repair projects,ensuring construction site sediment and erosion control, designing post-construction and low impact development(LID)stormwater management structures,inspecting illicit connections and illegal discharges,auditing discharge associated with industrial and commercial activities,providing maintenance facilities with environmental compliance support,conducting stormwater sampling/monitoring,developing and implementing strategies to reduce and meet waste load allocations,coordinating public outreach efforts,developing and utilizing an Asset Management System to collect/store/evaluate the data associated with this project,conducting training,and preparing and submitting reports. Program Manager.$39,500,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Statewide Compliance-Focused Environmental Management System(EMS), PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Transportation(Statewide,Hawaii) 2010 d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Oversaw ETC's contract to assist the State of Hawaii with implementing the agreement between the Hawaii DOT and the EPA and Hawaii Department of Health(Consent Decree).To meet the Consent Decree requirements,ETC completed a Gap Assessment of the State's overall environmental compliance;prepared Environmental Compliance Checklists for use by the DOT at each of its Transportation Baseyard facilities;developed an EMS Manual for the Harbors Division, Highways Division,and Airports Division;and provided training to all Baseyard employees and management staff.Project Manager.$900,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Damon Hamura Principal a.TOTAL b.WITH CURRENT FIRM 29 26 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.E.,1995,Loyola Marymount University,Civil Engineering • Honolulu District,U.S.Army Corps of Engineers(USACE), M.S.,Graduate Coursework,University of Hawaii at Manoa,Civil Engineering Construction Quality Management(CQM)for Contractors Certificate • California,EIT Certification 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • 40 Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate • American Red Cross First Aid and CPR Certificate • 8 Hour Supervisor/Mgr.HAZWOPER(29 CFR 1910.120)Certificate 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Commercial Harbors Environmental Compliance Support Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Transportation-Harbors Division(Statewide,Hawaii) On-going a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provided environmental engineering and compliance support services for the DOT-Harbors.Such services include but are not limited to soil and groundwater(e.g. UST)investigations,storm drain outfall reconnaissance inventory and mapping,EMS and construction inspector training,tenant BMP and construction inspections, public outreach and involvement,illicit discharge inspections,revisions to SWMPP,enhancement of Asset Management System(AMS),and assist with other stormwater compliance.Program Manager.$400,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Consultant Services for Kapa'a Landfill Groundwater Monitoring Program,City& PROFESSIONAL SERVICES CONSTRUCTION(If applicable) County of Honolulu,Department of Environmental Services,(Honolulu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b• Assisted with the management of the Kapa'a Landfill Groundwater Monitoring Program.Prepared an addendum to the existing groundwater monitoring plan to address issues previously identified by the Hawaii Department of Health,Office of Solid Waste Management;replaced one defunct groundwater monitoring well and installed up to three new groundwater monitoring wells;conducted groundwater and leachate sampling and analysis in accordance with the groundwater monitoring plan/addendum;prepared an initial groundwater and leachate monitoring report;and assisted City&County of Honolulu,Department of Environmental Services with the investigation of elevated leachate flows.Prepared two Alternative Source Investigations and an Updated Groundwater Monitoring Plan.To-date,ETC has completed a total of 26 semi-annual monitoring events.Project Manager.$580,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lead-Based Paint Inspection and Risk Assessment, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Hawaii Public Housing Authority(Statewide,Hawaii) 2024 C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Contracted by the Hawaii Public Housing Authority to conduct lead-based paint inspections and risk assessments at 45 facilities located throughout the State of Hawaii.The inspections were performed in accordance with the U.S.Department of Housing and Urban Development(HUD)standards by EPA-certified Lead Risk Assessors utilizing field portable x-ray fluorescence(XRF)analyzers and resulted in over 77,000 lead readings.Program Manager.$1,160,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Initial Environmental Screening and Environmental Compliance Management, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Honolulu Rail Transit Project,Maintenance and Storage Facility(Waipahu,Hawaii) 2016 d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Managed an awarded contract by Kiewit-Kobayashi,A Joint Venture(KKJV)to provide environmental consulting and environmental compliance management services.Assisted KKJV with FEIS/ROD compliance,contract-specific plan preparation,NPDES permit compliance,field environmental oversight,weekly and bi- weekly reporting,environmental incident response,environmental compliance audit assistance,and interfacing with Honolulu Authority for Rapid Transit(HART) personnel regarding environmental compliance issues.Environmental Compliance Manager.$280,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Engineering Services East Kapolei II Pesticide Mixing and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Loading Site,Hawaii Department of Hawaiian Home Lands(Kapolei,Hawaii) 2015 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Prepared a Community Involvement Plan(CIP)and initiated dialog with members of the affected community to obtain input on the ultimate remedial alternatives, e• identified potential hazardous materials existing on and within existing structures,managed and abated hazardous building materials,decontaminated/ decommissioned/disposed of existing aboveground storage and mixing tanks(9 total),demolished existing site structures,conducted additional characterization of site soils to refine estimates of the magnitude and extent of contaminant impacts to site soils,identified environmental hazards posed by the existing site contamination, identified and evaluated appropriate remedial alternatives to address contaminated media,solicited input from interested members of the public regarding preferred remedial alternatives through a Public Notice and an informational open house,and provided planning and design for the selected remedial response action. Subsequently,provided construction management services during implementation of the selected remedial response action,the implementation of confirmation sampling,documentation of the remedial response action,and prepared an EHMP for long-term management of the remaining hazards.Project Manager.$720,000. STANDARD FORM 330(REV.712021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Mark Ohigashi, P.E. Sr.Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 15 3 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) M.S.,2009,Stanford University,Civil and Environmental Engineering Hawaii,Registered Professional Civil Engineer(PE-17812) B.S.,2007,Loyola Marymount University,Civil Engineering 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • 30-Hour OSHA Construction Safety and Health • Water Environment Federation-Hawaii Water Environment Association • 10-Hour USACE EM 385-1-1 Certification (Collection Systems Committee) • PSMJ A/E/C Project Management Bootcamp • American Council of Engineering Companies of Hawaii-Emerging Leaders • American Water Works Association-Hawaii Section(Current Treasurer) Program Cohort#2 • American Society of Civil Engineers-Hawaii Section Member 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED EPA Compliance,Storm Water Management Program for the Island of 0`ahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) State of Hawaii Department of Transportation(Honolulu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Engineering design and regulatory compliance services for the State of Hawaii Department of Transportation to address storm water management requirements mandated by the NPDES M54 Permit.Oversees engineering team support for the erosion control,erosional outfall,and permanent best management practices programs.Serves as design manager and subject matter expert for erosion control and permanent best management practices for stormwater quality.$36,000,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Miscellaneous Storm Drain Improvements Projects,State of Hawaii Department PROFESSIONAL SERVICES CONSTRUCTION(If applicable) of Transportation—Highways Division,Maui District(Kahului,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Provides engineering design services for improvements to existing drainage structures of the HDOT Maui District MS4.Improvements included repair and raising existing grated inlets,raising existing manholes,pavement restoration,and repairing existing pipe connections.Also provided engineering design services in response to post-wildfire damage to highway stormwater and roadway infrastructure within HDOT right-of-way in and around Lahaina.Serves as design lead,design manager,and engineer of record. $25,000,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lead and Copper Rules Revisions(LCRR)Compliance for the Island of 0`ahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Honolulu Board of Water Supply(Honolulu,Hawaii) On-going G (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provide consultation for compliance with the Environmental Protection Agency's 2021 update to the Lead and Copper Rule(LCR).Provide field investigations to determine materials of water-utility and customer-owned lateral connections and provide customer tap sampling to determine lead and copper levels in the community to update and maintain the utility's Lead Service Line Inventory on the Island of 0`ahu.Project Manager.$1,270,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Engineering Services,Lead and Copper Rule Revisions(LCRR) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Compliance Assistance for Waiahole Valley Water System(Kaneohe,Hawaii) On-going d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provide consultation for compliance with the Environmental Protection Agency's 2021 update to the Lead and Copper Rule(LCR).Provide field investigations to determine materials of water-utility and customer-owned lateral connections to develop and maintain the utility's Lead Service Line Inventory in the Waiahole Valley Water System.Provide LCRR Program Management.Project Manager.$1,326,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lahaina Fires Emergency Response-Stormwater Capture,Convey,and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Treatment System,Hawaii Department of Transportation(Lahaina,Hawaii) 2024 e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provide consultation and preliminary design for a stormwater capture system using existing County of Maui drainage assets throughout the Lahaina burn zone.Also,provide a temporary aboveground conveyance system to deliver potentially contaminated stormwater to a converted lined drainage basin for treatment prior to discharge to the ocean.Project Manager.$1,250,000 STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Vijaya Tummala,P.E. Sr.Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 22 15 is.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2000,Osmania University,India,Civil Engineering • Hawai`i,Registered Professional Engineer(PE 15516) M.S.,2003,West Virginia University,Civil Engineering • Texas,Registered Professional Engineer(150075) • Hawai`i,Certified Inspector of Sediment and Erosion Control(CISEC) • Hawai`i,EnviroCert Certified Professional in Erosion and Sediment Control(CPESC) • Certified Floodplain Manager(CFM) 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • Texas Floodplain Management Association,Member • Presenter at Hawaii Department of Transportation 2023 Protect Our Water Conference • Instructor at a day-long February 2016 seminar"Construction and Post-Construction BMPs"in Honolulu 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED State of Hawaii,Department of Transportation,Highways Maui District, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Storm Water Management Program,Island of Maui(Kahului,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a• Serving as the Subject Matter Expert overseeing Highways Maui District's Storm Water Management Program(SWMP),providing National Pollutant Discharge Elimination System(NPDES)Municipal Separate Storm Sewer System(MS4)Permit compliance,civil and environmental engineering services for erosion control,storm drain retrofit initiatives and post-construction Best Management Practices(BMPs)projects,with a focus on Low Impact Development(LID)techniques.Responsibilities include managing engineering design projects such as the Stable Road Post-Construction BMP and the replacement of aboveground storage tanks at Kahului Baseyard.Additionally,developed Standard Operating Procedures to facilitate the thorough review of projects and ensure effective implementation of post-construction BMPs.Project Engineer.$25,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Engineering Management at Daniel K.Inouye International PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Airport and Kahului Airport(Honolulu and Kahului,Hawaii) 2022 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Responsible for providing technical support to the Department of Transportation,Airports Division(DOTA)NPDES M54 Permit compliance requirements at Daniel K.Inouye International Airport and Kahului Airport.These requirements include developing and implementing control measure procedures that address the required public education and outreach,illicit discharge detection and elimination,construction site runoff control,post construction BMPs, pollution prevention and good housekeeping,and tenant activities discharge management.Also,responsible to ensure that DOTA complies with other environmental requirements that pertain to:underground storage tanks;aboveground storage tanks;Spill Prevention Control and Countermeasure(SPCC); sampling and monitoring;water quality,maintenance baseyards;reporting;asset management systems(AMS);GIS mapping;and permit negotiations. Project Engineer.$9,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED State of Hawaii Department of Transportation's Storm Water Management PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Program Plan(Statewide,Hawaii) 2016 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm ETC served as the State of Hawaii's Master Consultant and provided compliance with stormwater management requirements established in the agreement C• (Consent Decree)between the State of Hawaii Department of Transportation Highways Division,the Environmental Protection Agency,Hawaii Department of Health,and the DOT's NPDES MS4 permit.As Master Consultant,ETC ensured that all stormwater management requirements were met.Involved in maintaining an Asset Management System(AMS),implementing and inspecting debris control BMPs,designing erosion control BMPs, ensuring construction site runoff control,developing post-construction stormwater management in new and redevelopment,inspecting illicit connections/ illegal discharges,overseeing industrial/commercial activities discharge management,assisting with maintenance facilities BMPs,conducting stormwater monitoring,meeting waste load allocation goals,coordinating public outreach,conducting training,and preparing and submitting compliance reports. Project Civil Engineer.$39,500,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Storm Water Management Program,Hawaii Army National Guard(HIARNG) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Facilities(Honolulu,Hawaii) 2015 d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm Responsible for developing a SWMP for HIARNG's M54 NPDES permit,HI S00052.Reviewed the relevant environmental documents provided by HIARNG,coordinated with HIARNG to develop procedures and policies to comply with HIARNG's M54 NPDES Permit and recommended BMPs.Drafted comprehensive updates of HIARNG's SWMP supporting the following minimum control measures:public education and outreach;public involvement and participation;construction site runoff control;post-construction stormwater management;and pollution prevention/good housekeeping.Project Engineer. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Matthew Stimpson Program Managers a.TOTAL b.WITH CURRENT FIRM Senior Environmental Scientist 18 4 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2007,University of Hawaii at Manoa, Hawaii,Certified Professional in Erosion and Sediment Control(CPSEC) Natural Resources and Environmental Management 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • Certified American Academy of Underwater Science Diver 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Statewide Storm Water Management Program(SWMP),State of Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Transportation,Highways Division,0`ahu District(0`ahu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Serves as Program Manager to the State of Hawaii Department of Transportation,Highways Division(DOT-HWYS)Storm Water Management a. Program.Provides compliance support for stormwater management requirements established in DOT-HWYS,0`ahu District's National Pollutant Discharge Elimination System(NPDES)municipal separate storm sewer system(MS4)permit.In addition to the same compliance support services that ETC provided while under contract during the previous years,ETC's services have expanded to help address new and enhanced regulatory requirements.These new and enhanced requirements include:trash reduction,waste load allocation compliance,post-construction and permanent best management practice design/construction/maintenance,compliance audit support,enforcement response for illicit discharges,Army Corp 404 permitting,Department of Health 401 Water Quality permitting,and mobile Asset Management System(AMS)integration.Program Manager. $36,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED National Pollutant Discharge Elimination System(NPDES)Stormwater Program PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Management,City and County of Honolulu(0`ahu,Hawaii) 2011 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm b. Performed program management of the City and County of Honolulu's NPDES permit,which covers stormwater discharges from the city's large storm drainage system and includes nine City departments.Updated the City's 2007 stormwater management program plan in coordination with nine City departments and several consultants.Tasks included developing program effectiveness assessment measures,updating erosion control standards,developing an island-wide trash reduction plan,developing municipal best management practice(BMP)manuals,and preparing annual NPDES compliance reports. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED City and County of Honolulu,Department of Environmental Services,NPDES PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Storm Water Program Management,City and County of Honolulu(0`ahu,Hawaii) 2010 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm C. Engineer for program management of the City and County of Honolulu's National Pollutant Discharge Elimination System(NPDES)permit,which covers storm water discharges from the City's large storm drainage system and includes nine city departments.Updated the city's 2007 storm water management program plan in coordination with 9 city departments and several consultants. Tasks included developing program effectiveness assessment measures, updating erosion control standards,developing an island wide trash reduction plan,developing municipal best management practices manuals,and preparing annual NPDES compliance reports. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED City and County of Honolulu,Department of Planning and Permitting,'Ewa PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Development Plan&East Honolulu Sustainable Community Plan(0`ahu,Hawaii) 2006 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm Identified major problems and opportunities regarding socioeconomic and ecological needs for future development of specific areas on the island of Oahu. d. Conducted extensive research and preparation of information on alternative transportation,including imposing secure areas for pedestrians and expanding pedestrian friendly environments within Oahu districts.Held a key role in studying a high-capacity corridor while maintaining and editing a OS database as the plans changed;and provided GIS support producing GIS data,maps and graphics in support of the project.Development Plans are required by the City Charter.Together with the General Plan,population and land use growth are guided over a 20-year time span.As part of the annual City budget process,all capital improvement projects are reviewed to determine if they are consistent with the respective Development Plan.Development Plans are also intended to guide City land use approvals and permits and influence private sector investment decisions. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Kylie Luke Waste Management Manager a.TOTAL b.WITH CURRENT FIRM 20 20 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,1994,University of Idaho,Human Resources 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • 40 Hour Initial/Current HAZWOPER(29CFR 1910.120)Certificate • OSHA 8-hour EM 385 USACE Safety&Occupational Health Refresher • 8 Hour HAZWOPER(29 CRF 1910.120)Certificate • Adult First Aid/CPR AED Certificate • U.S.Army 40-hour EM-385 Construction Safety Training • Powered Industrial Truck Operator(CFR 1910.178) • OSHA 30-hour Construction Safety Training 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Household Hazardous Waste Collection and Disposal Services for Department of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Environmental Management,Solid Waste Division(County of Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Supervised and implemented HHW program,including collecting,identifying,segregating,packaging,labeling,transporting,and disposing of more than 100,000 pounds of hazardous and solid waste annually for the Island of Hawaii.Waste streams included flammable gases/liquids/solids,oxidizers,organic peroxides,poisons,acids,bases,mercury-containing lamps and equipment,batteries,and used oil.Complied with applicable Department of Transportation regulations.Project Manager.$800,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Fixed Price Remedial Action Contract(FRAC)for Various Sites in the Naval PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Facilities Engineering Command Pacific Area of Responsibility On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Supervised and provided environmental and waste management services at various sites,primarily on the Island of 0`ahu and Guam.Conducted removal actions such as excavation and disposal of soil,closing fuel storage tanks,ongoing monitoring well sampling and gauging,preparing appropriate documentation of planned and completed actions,and performing long-term management of other related activities.Site Superintendent/Remediation Manager.$1,835,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Hazardous Waste Removal for Various Departments of Education Schools PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) On-going C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provided the DOE with environmental support services on an as-needed basis.Performed identification(including sampling and analysis),packaging, transportation,and disposal of various types of solid and hazardous waste throughout the State of Hawaii school system.Additionally,provided emergency spill response and post-cleanup sampling,analysis,and air monitoring to document cleanup efforts.Project Manager.$1,000,000. (1)TITLE A N D I.00AT'ON(City and State) (2)YEAR COMPLETED Confiscated Hazardous Materials Disposal for the Transportation Safety PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Administration(Statewide,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE d. Package,transport,and dispose of various types of hazardous materials confiscated by the Transportation Safety Administration(TSA)while screening passengers prior to boarding flights.Create all required all required documents,including Uniformed Hazardous Waste Manifests(EPA Form 8700-22),Land Disposal Restriction Notification,vessel transportation bill of ladings,and DOT hazardous materials/waste marking and labels.These services are being provided to 7 TSA stations recurring throughout Hawaii.Project Manager.$1,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Hazardous Materials Sampling and Collection for U.S.Army Installations PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) On-going e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Sample,analyze,package,create waste profiles,and transport all waste stored at the US Army 90-day storage sites located throughout the State of Hawaii.Waste streams managed under this contract include pesticides,paint related materials,petroleum,unknowns,and other solid and hazardous wastes.Project Manager.$300,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Matthew Tolley Senior Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 17 2 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2002,Cal Poly Humboldt,Environmental Science,Hydrology 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • 40-Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate • California Site Surveillance Technician(17-6073) • 8-Hour Refresher HAZWOPER(29 CFT1910.120)Certificate • AHERA MP,PD,C/S and BSI • PG&E Certified Energy Auditor • CDPH Lead Assessor/Inspector Certified 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Waialua Settling Ponds Site Investigation&Environmental Consulting Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Dole Food Company (Waialua,Hawaii) On-going a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Responsible for various tasks including project management,agency engagement,site investigation work plan development,site investigation implementation,and reporting in association with the 29-acre assessment.Leading a multidisciplinary team to assess potential environmental impacts and ensure compliance with regulatory standards throughout all phases of the investigation.Project Manager.$315,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lead and Copper Rule Revisions(LCRR)Compliance Assistance,County of Hawaii, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Water Supply(Island of Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Primary roles and responsibilities included project management,project tracking,financial analysis and technical lead and/or support on primary tasks including;Regulatory Roadmap and Gap Analysis with Work Process Evaluation,Service Line Material Inventory Initial Assistance,Lead Service Line Replacement Plan,Customer Tap Sampling Plan,Schools and Childcare Facilities Plan,and Public Outreach.LCRR Compliance assistance performed island- wide on the Island of Hawaii.Project Manager.$1,557,067. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Management and Remediation Support for Alana Ola Pono PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Kauhale Development Project,HomeAid Hawaii(Honolulu,Hawaii) On-going C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Oversees the preparation and implementation of key environmental plans for the development of 53 temporary"kauhale"dwelling units on a historically contaminated 45,000 sq.ft lot in lwilei.Responsibilities included developing multiple documents and environmental sampling in association with proposed construction activities at the project site.Project Manager and Senior Environmental Scientist.$105,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Consulting and Rapid Response Services for Mahi Pono PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Pu`unene,Hawaii) On-going d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Manages a Master Service Agreement,overseeing environmental compliance,rapid spill response,and hazardous materials assessments across 41,000 acres of agricultural land in Central Maui.Coordinates with regulatory agencies,including the Hawaii Department of Health,and ensures timely execution of services such as NPDES permit support,air quality evaluations,and HAZWOPER training.Project Manager and Senior Environmental Scientist.$120,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Port of Richmond Terminal Four Wharf Removal Project, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) City of Richmond(Contra Costa County,CA) 2023 e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm Day-to-day project manager responsible for the planning,design,environmental compliance,soil hazards and biological studies to remove the largest derelict creosote wharf in San Francisco Bay.Work included biological studies and monitoring,construction monitoring,assess environmental considerations,and completing technical studies.Total project budget:$5,200,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Tonya Ketza Project Manager/Env. Planner a.TOTAL b.WITH CURRENT FIRM 19 1 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2001,Humboldt State University,Biology Project Management Professional Certification M.S.,2005,University of Hawaii at Manoa,Microbiology 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • American Planning Association,Member • Green Infrastructure Implementation,WEF,2021 • Social marketing Association of North America,Member • Certified Inspector of Sediment and Erosion Control,2016 • Water Environment Federation,Member • Envision Sustainable Infrastructure,Institute for Sustainable Infrastructure,2016 • National Association of Environmental Professionals,Member • State of Hawaii,Green Business Award,Special Event,2019&2023 • National Society of Leadership and Success,Member • National Municipal Stormwater Award,Recognition for Program • Watershed Management Training Certificate,US EPA,2022 Management and Innovation,2022 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Storm Water Management Program for the State of Hawaii Department of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Transportation,Highways Division,0`ahu District(Honolulu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Serves as a Project Manager for the Storm Water Management Program at the State of Hawaii Department of Transportation,Highways Division(HDOT), providing compliance support for stormwater management.Ensuring adherence to local and federal regulations while developing and implementing effective stormwater management plans.Collaborating with stakeholders,including regulatory bodies and community groups,in a key role facilitating communication and gathering feedback.Establishing monitoring systems to assess stormwater runoff quality across HDOT infrastructure and regularly analyzing data for compliance reporting.Additionally,creating training materials to educate HDOT staff and the public on best practices in stormwater management,enhancing the program's overall effectiveness.Project Manager.$36,000,000. (1)T'TI_E AND I OC4T'ON(Cite and State) (2)YEAR COMPLETED Storm Water Public Education and Outreach Program for the City and County of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Honolulu(Kapolei,Hawaii) 2024 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm b• Served as section lead of the Storm Water Public Education and Outreach Program for the City and County of Honolulu.Provided compliance support to the Department of Facilities Maintenance,Storm Water Quality Division.Focused on educating the public about stormwater issues and promoting best practices for water quality protection.Created various outreach materials,including brochures,workshops,and community events to engage residents. Collaborated with local organizations to ensure broad reach and effective communication of key messages.Measured program effectiveness through regular assessments that informed future strategies for public education efforts.Community Relations Specialist.$12,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Waste Water Analyses&Research for the City and County of Honolulu PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Kapolei,Hawaii) 2012 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm C. Served as technical expert within the City and County of Honolulu's Water Quality Laboratory.Conducted comprehensive waste water analyses and research.Analyzed data to identify trends and issues related to waste water management.Developed recommendations for improving waste water treatment processes and enhancing overall system efficiency.Collaborated with local stakeholders to ensure alignment on research findings and proposed solutions.Presented findings at stakeholders meetings,fostering awareness and encouraging engagement in waste water management initiatives. Evaluated program outcomes to inform future research efforts and policy decisions in the region.Sanitary Chemist.$10,000,000. TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Development of Detection Methods and Evaluation of Non-Enteric Pathogens in PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Marine Waters,University of Hawaii 2005 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE n Check if project performed with current firm d. Served as lead research associate within the University of Hawaii Water Resources Research Center in collaboration with the Infectious Disease Department of Queens Medical Center. Developed detection methods for identifying non-enteric pathogens in marine waters.Evaluated various sampling techniques to optimize pathogen recovery and analysis.Conducted experiments to assess the prevalence and distribution of non-enteric pathogens across different sites.Collaborated with researchers to analyze data and interpret results,contributing valuable insights into marine health risks.Presented findings at academic conferences,enhancing knowledge sharing within the scientific community.Advised on published research outcomes in peer-reviewed journals,advancing methodologies for monitoring water quality.$2,000,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Codee Samala-Passos, P.E. Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM 8 1 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2014,Seattle University,Civil and Environmental Engineering Hawaii,Registered Professional Engineer(PE 21241) 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • OSHA 24-Hour HAZWOPER • 40-Hour Envirostat,Inc. • DOT 40-Hour HAZWOPER • Sampling for Defensible Environmental Decisions, • 40-Hour RCRA DoD Interservice Environmental Education Review • American Heart Association BLS/CPR • Board(ISEERB)Trainings 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED EPA Compliance,Storm Water Management Program for the Island of 0`ahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) State of Hawaii Department of Transportation(Honolulu,Hawaii) On-going a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Engineering design and regulatory compliance services for the State of Hawaii Department of Transportation to address storm water management requirements mandated by the NPDES MS4 Permit.Provide support for the erosion control,erosional outfall,and permanent best management practices programs.Serves as project engineer for erosion control and permanent best management practices for stormwater quality.$36,000,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Miscellaneous Storm Drain Improvements Projects,State of Hawaii Department PROFESSIONAL SERVICES CONSTRUCTION(If applicable) of Transportation—Highways Division,Maui District(Kahului,Hawaii) On-going b• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provides engineering design services for improvements to existing drainage structures of the HDOT Maui District MS4.Improvements included repair and raising existing grated inlets,raising existing manholes,pavement restoration,and repairing existing pipe connections.$25,000,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Compliance&Emergency Response Oversight, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Pearl Harbor Naval Shipyard(Honolulu,Hawaii) 2024 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm C• Served as Supervisory Environmental Protection Specialist overseeing environmental compliance,engineering support,and emergency response operations for the Pearl Harbor Naval Shipyard.Led a multidisciplinary team in planning and executing environmental programs,including hazardous substance spill response,stormwater management,and compliance with federal and state regulations.Developed and tracked multi-year budgets,procured environmental engineering services,equipment,and consumables,and ensured technical accuracy and timely delivery of projects.Represented the naval shipyard in regulatory negotiations,coordinated inspections,and supported infrastructure resilience through participation in major emergency response drills. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Stormwater Compliance&Erosion Control Enhancements, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) The Limtiaco Consulting Group(Honolulu,Hawaii) 2019 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm d. Served as Project Engineer supporting the City&County of Honolulu's compliance with NPDES stormwater and construction dewatering permit requirements.Coordinated and conducted erosion and sediment control inspections,enforced compliance with Federal,State,and City stormwater regulations,and trained construction personnel on BMP implementation.Developed,reviewed,and improved technical documents—including ESCPs, LID Plans,and SWPPPs—and presented updated SWPPP guidance to over 200 professionals at the City's annual Stormwater Workshops.Led internal audits and gap analyses,recommended corrective actions,and developed training programs to enhance compliance and regulatory understanding across engineering,inspection,and construction teams. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Sara Marvin Industrial Hygienist a.TOTAL b.WITHCURRENTFIRM 9 6 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2011,Portland State University,Organismal Biology 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.; • American Red Cross First Aid/CPR/AED Certification • EPA Lead Based Paint Inspector Certificate • EPA AHERA Asbestos Management Planner Certificate • EPA Lead Based Paint Risk Assessor Certificate • EPA AHERA Asbestos Project Designer Certificate • EPA Lead Based Paint Project Designer Certificate • EPA AHERA Asbestos Building Inspector Certificate • OSHA Scissor and Boom Lift Training • EPA AHERA Asbestos Project Monitor Certificate 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Services for Various Hawaii Department of Education Schools PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Provide environmental services for various renovation projects,including fire alarm system upgrades/replacement and other interior building renovations at DOE schools and facilities throughout the State of Hawaii.Services may include hazardous materials surveys,soil sampling and analysis,preparing abatement specifications,reviewing RFIs and contractor submittals,conducting abatement oversight/area air monitoring,and/or conducting visual clearance/clearance sampling following abatement.The work is assigned on a site-by-site and project-by-project basis as requested by the State of Hawaii DOE.To-date,ETC has conducted or is currently conducting more than 550 hazardous materials surveys and/or air monitoring projects throughout the State of Hawaii.Industrial Hygienist.$1,860,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Water Fixture Replacement Sampling for Various Hawaii Department of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Education Schools(Statewide,Hawaii) On-going b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Responsible for coordinating and conducting confirmation sample collection for the statewide effort to replace water fixtures at elementary schools across six islands. In addition,coordinates sample handling,management,and delivery with the Drinking Water Chemistry Section of the Hawaii State Environmental Health Analytical Services Branch,which is certified by the EPA for the analysis of lead in drinking water pursuant to the Safe Drinking Water Act.ETC has conducted or is currently conducting confirmation sampling of approximately1,480 water fixtures from the 170 elementary schools across Hawaii.$265,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lead-Based Paint Inspection and Risk Assessment,Hawaii Public Housing PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Authority(Statewide,Hawaii) 2024 C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Performed lead-based paint inspections of various interior and exterior areas at 45 public housing facilities utilizing portable x-ray fluorescence(XRF)analyzers in accordance with U.S.Department of Housing and Urban Development(HUD)standards and guidelines.Performed lead-based paint risk assessments of properties that were found to contain lead-based paint,resulting in over 77,000 lead readings across more than 1,000 dwelling unitsand 440 building exteriors.Prepared and submitted a comprehensive written report including documentation of hundreds of thousands of data points,findings and conclusions.Industrial Hygienist.$1,160,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED DOE Design Services for Job Order Contract Projects FY20, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Bowers+Kubota Consulting,Inc.(Statewide,Hawaii) 2021 d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provide environmental services for various Job Order Contracting(JOC)construction projects at DOE schools and facilities throughout the State of Hawaii.Services include hazardous materials surveys,soil sampling and analysis,preparing abatement specifications,reviewing RFIs and contractor submittals,conducting abatement oversight/area air monitoring,and/or conducting visual clearance/clearance sampling following abatement.The work is assigned on a site-by-site and project-by- project basis as requested by the State of Hawaii DOE.Since October 2020,ETC has conducted more than 350 hazardous materials surveys on projects of various sizes throughout the State of Hawaii.Industrial Hygienist.Indefinite Quantity. (1)TITLE AND LOCATION(City and State, (2)YEAR COMPLETED Hazardous Materials Surveys and Asbestos Abatement,Various Renovations and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Demolition Projects,Tripler Army Medical Center(0`ahu,Hawaii) 2019 e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Conducted hazardous materials surveys and asbestos investigation/abatement activities at various locations throughout the Tripler Army Medical Center.The hazardous materials surveys included lead-based paint(utilizing portable x-ray fluorescence analyzers),asbestos,arsenic,mercury,mold and PCB inspections. Provided asbestos abatement activities including subcontracting abatement companies,providing project supervision,air monitoring,and various consultation services.Planned,coordinated and directed all aspects of the field sampling activities,data interpretation/validation,and report writing.Industrial Hygienist. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Akari Ihara Industrial Hygienist a.TOTAL b.WITH CURRENT FIRM 23 3 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) A.A.,Kapi`olani Community College,Business 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • EPA AHERA Asbestos Building Inspector Certificate •American Industrial Hygiene Association(AIHA),Member • EPA AHERA Asbestos Project Monitor Certificate •OSHA 30 Hour Construction Training • EPA Lead Based Paint Risk Assessor Certificate •EM385 Safety Training •Hazardous Waste Operation and Emergency Response Certified •GCA of Hawaii Construction Safety Hazard Awareness Training 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Services Various,Facilities Asset Management-Building Envelope PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Assessments and Design,Bowers+Kubota Consulting,Inc.(Statewide,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Provide environmental services for various renovation projects,including fire alarm system upgrades/replacement and other interior building renovations at DOE schools and facilities throughout the State of Hawaii.Services may include hazardous materials surveys,soil sampling and analysis,preparing abatement specifications,reviewing RFIs and contractor submittals,conducting abatement oversight/area air monitoring,and/or conducting visual clearance/clearance sampling following abatement.The work is assigned on a site-by-site and project-by-project basis as requested by the State of Hawaii DOE.To-date,ETC has conducted or is currently conducting more than 550 hazardous materials surveys and/or air monitoring projects throughout the State of Hawaii.Industrial Hygienist.$1,860,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lead-Based Paint Inspection and Risk Assessment,Hawaii Public Housing PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Authority(Statewide,Hawaii) 2024 b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Performed lead-based paint inspections of various interior and exterior areas at 45 public housing facilities utilizing portable x-ray fluorescence(XRF)analyzers in accordance with U.S.Department of Housing and Urban Development(HUD)standards and guidelines.Performed lead-based paint risk assessments of properties that were found to contain lead-based paint,resulting in over 77,000 lead readings across more than 1,000 dwelling unitsand 440 building exteriors.Prepared and submitted a comprehensive written report including documentation of hundreds of thousands of data points,findings and conclusions.Industrial Hygienist.$1,160,000 (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Water Fixture Replacement Sampling for Various Hawaii Department of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Education Schools(Statewide,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm C. Responsible for coordinating and conducting confirmation sample collection for the statewide effort to replace water fixtures at elementary schools across six islands. In addition,coordinates sample handling,management,and delivery with the Drinking Water Chemistry Section of the Hawaii State Environmental Health Analytical Services Branch,which is certified by the EPA for the analysis of lead in drinking water pursuant to the Safe Drinking Water Act.ETC has conducted or is currently conducting confirmation sampling of approximately1,480 water fixtures from the 170 elementary schools across Hawaii.Industrial Hygienist.$265,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Consulting and Rapid Response Services for Mahi Pono PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Pu`unene,Hawaii) On-going d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Performs environmental assessments and monitoring services on an as-need basis.Conducted multiple environmental assessments at Mahi Pono's Distribution and Packaging Center in Kahului,including:visual inspections for potential hazardous building materials and indoor air quality issues,hazardous materials surveys,lead dust wipe(for lead analysis)and soil sampling,indoor air quality evaluation for carbon monoxide and volatile organic compounds(VOCs)during typical work shifts. Industrial Hygienist.$120,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Kamehameha Schools Windward Mall,All except Macy's Asbestos Survey and Macy's PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Comprehensive NESHAPS Survey(Honolulu,Hawaii) 2021 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ri Check if project performed with current firm e. Performed lead-based paint inspections of various interior and exterior areas at 45 public housing facilities utilizing portable x-ray fluorescence(XRF)analyzers in accordance with U.S.Department of Housing and Urban Development(HUD)standards and guidelines.Performed lead-based paint risk assessments of properties that were found to contain lead-based paint.Prepared and submitted a comprehensive written report including documentation of hundreds of thousands of data points,findings and conclusions.Industrial Hygienist.$750,000. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Mailea Silvestre Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 8 4 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) Ph.D.,2017,Washington State University,Biological Sciences M.S.,2010,University of Rhode Island,Ecology B.S.,2007,Sonoma State University,Biology/Environmental Studies and Planning/Conservation and Restoration 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) • GIS and Geospatial Technology Certificate,University of California Los Angeles,2021 19.RELEVANT PROJECTS (1)T'TI_E 4ND I c C4T'CN(City;_=nd St=tr1 (2)YEAR COMPLETED Maui District M54 Program,Island of Maui,State of Hawaii Department of PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Transportation(HDOT),Highways Division(Island of Maui,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Provide environmental compliance and technical water quality support for the Department of Transportation Highways Division,Maui District(Maui Highways). Develop and implement a Debris Cleaning Assessment(DCA)study to characterize loads of nitrogen,phosphorus,and particulate matter collected by street sweeping and structure cleaning of the Maui Highways MS4.The study also investigated the relationship between pollutant loads,debris volume,route locations/land use,and seasons(wet/dry).Findings from the DCA study guides future pollution reduction strategies for Maui Highways. Conduct a spatial data analysis and OS geoprocessing to analyze the relationship between Maui Highway's MS4 assets and receiving water bodies. Conducts internal reviews of the programs and analyzes trends,goals,and compliance to measure and ensure effectiveness.$25,000,000. TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Water Quality Consultant for Hawaii Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Division,0`ahu District(Honolulu,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm b. Technical water quality advisor on Hawaii State water quality standards and policy related to nutrients,turbidity,chlorophyll,and fecal indicator bacteria. Synthesized and analyzed water quality datasets for development of standards to meet Clean Water Act regulatory compliance for policy development.GIS specialist for production of thematic maps and reports using GIS.Researched and developed projects using GIS to answer questions about water quality,and the health of humans and ecosystems.$36,000,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lahaina Fires Emergency Response for Hawaii Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Lahaina,Hawaii) On-going c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Provided GIS technical support for rapid structure mapping in Lahaina following the 2023 wildfires,directly supporting emergency response and recovery operations.Utilized ArcGIS Field Maps and Survey123 to collect,manage,and visualize critical geospatial data in real-time,contributing to informed decision- making during a high-pressure disaster response. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Consulting Services,Maui District MS4 Program PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Island of Maui,Hawaii) 2023 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Assisted with preparing Annual Reports for the Department of Transportation,Highways Division,Maui District(Maui Highways)MS4 Program,which d. documented and summarized the implementation of the Stormwater Management Plan(SWMP)for each calendar year with the one major goal being continuous improvement for the following year.Part of the Annual Report assessment of effectiveness includes five minimum control measures(MCMs), comprising the status of achieving the measurable goals for each best management practice(BMP)from the SWMP.Compiled,analyzed,and graphed program data from the Annual Report to create a Measuring Program Effectiveness Assessment Report that summarized the Maui Highways progress and effectiveness for each of its five MCMs between each reporting period.The data was used to demonstrate those measures that were effective,and to guide the adaptive management of the Maui Highways MS4 Program.Also,conducted a cost-analysis to assess annual program costs on a per BMP basis.This data was used to determine which programs were cost-effective,and areas where funds could be shifted from one BMP to another for maximum benefit. STANDARD FORM 330(REV.7/2021) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Christopher Gallacher Environmental Scientist a.TOTAL b.WITH CURRENT FIRM 6 6 15.FIRM NAME AND LOCATION(City and State) EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) B.S.,2018,Oregon State University,Environmental Science: ESCP Coordinator Aquatic Biology M.B.A.,2024,Hawaii Pacific University 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) Professional Certificate:Google Project Management 19.RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Commercial Harbors Environmental Compliance Support Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Transportation-Harbors Division(Statewide,Hawaii) On-going (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. Provides environmental engineering and compliance support services for the DOT-Harbors.Such services include but are not limited to soil and groundwater (e.g.UST)investigations,storm drain outfall reconnaissance inventory and mapping,EMS and construction inspector training,tenant BMP and construction inspections,public outreach and involvement,illicit discharge inspections,revisions to SWMPP,enhancement of Asset Management System(AMS),and assist with other stormwater compliance.Project Scientist.$400,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Management and Monitoring Services for the Villages of Kapolei, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Hawaii Housing Finance and Development Corporation(Kapolei,Hawaii) On-going b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm Project Scientist for Contract No.DEV 23-10,to prepare NOI submissions for NPDES permits authorizing discharges of stormwater associated with construction activities,and updating the existing SWPPP,and completing a Drainage Injection Well Permit Renewal Application for the DOH Safe Drinking Water Branch.In addition,he manages field inspectors conducting permit required inspections,monitoring,and properly operating and maintaining the UIC injection wells.$447,000. (1)TITLE AND LOCATION(City and State (2)YEAR COMPLETED Environmental Engineering and Compliance Support Services,Mahipapa LLC PROFESSIONAL SERVICES CONSTRUCTION(If apprcable) (Lihu`e,Kauai) 2024 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm C. Project Scientist providing environmental engineering and compliance support services for the Pacific Current,LLC(Mahipapa)three sites:Power Plant,Wood Chip Drying Bed,and Kalepa Baseyard.Such services include but are not limited to site investigations,gap analysis of current compliance,storm drain outfall reconnaissance inventory and mapping,NPDES permitting and SWPPP development,SPCC development,DOH- Clean Air Branch source permitting and testing,DLNR water well permitting and tree species approvals,DOH-CWB wastewater permitting,USDA Soil and Water Conservation Plans,County of Hawaii Grubbing and Grading Exemption and Detention Basin Agreement,Multi-Site Environmental Compliance Plan,Annual compliance support(e.g.,reporting,training),and assist with other stormwater compliance.Project Scientist.$80,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Environmental Engineering Management and Inspection Services,State of Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Department of Transportation-Airports Division(Statewide,Hawaii) 2022 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm d. Project Scientist for Contract No.67649,to provide technical support to DOTA to meet its NPDES MS4 Permit compliance requirements.These requirements include developing and implementing HNL Individual Permit and OGG General Permit minimum control measure requirements that address all aspects of public education and outreach,illicit discharge detection and elimination,construction site runoff control,post construction best management practices,pollution prevention and good housekeeping,and tenant activities discharge management.Responsibilities also include to ensure that reports and other required submittals are prepared and submitted to the regulatory authorities in a timely manner.$9,000,000. STANDARD FORM 330(REV.7/2021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 1 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Stormwater Management Program for the Island of 0`ahu PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Honolulu,Hawaii) 2028 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Department of Transportation-Highways Division Rodney Gerard (808)489-0917 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) �a n EnviroServices&Training Center(ETC)serves as the Master Consultant for the State of Hawaii Department s iWcar , ry of Transportation,Highways Division,0`ahu District's(DOT Highways),supporting compliance with the ` Municipal Separate Storm Sewer System(MS4)National Pollutant Discharge _ r �; Elimination System(NPDES)Permit No.HI S000001.In 2018,the Water — Environment Federation awarded DOT Highways with a Gold Level in Program OFFICIAL RECRUIT Management and Silver Level in Innovation as a part of the organization's National Municipal Stormwater and Green Infrastructure Awards Program. Since 2009,ETC's Stormwater Management Program business division,through Contract Nos.HWY-OM-2009-46,HVVY-OW-2016-01,and HWY-OW-2021-01 , (current),has successfully developed and implemented the following DOT Lam : Highways'program components. b .p dS 11 ETC has provided continuous environmental compliance and stormwater management services to HDOT Highways since 2009,delivering strategic support across all six MS4 minimum control measures under a$36 million contract. Public Education:ETC has helped develop HDOT Highways award winning public education program.In response to the COVID-19 pandemic,ETC expanded the Hawaii Storm Patrol brand by producing a series of animated videos to virtually educate keiki on the storm drain system.During the 2020-2021 school year,the videos received over 5,800 views and was recognized with a Silver Pele Award by the American Advertising Federation,Hawaii Chapter. Illicit Discharge Detection:ETC is responsible for the detection and elimination of illegal connections and illicit discharges by inspecting over 2,100 outfalls annually and providing rapid response to complaints and spills.Additionally,ETC inspects over 125 industrial and commercial facilities annually for potential storm water pollutants.Through enhanced education efforts,inspection deficiencies per facility have decreased by 11%over the past five years.ETC also collaborated with the HDOT Highways'Deputy Attorney General to strengthen its enforcement through an improved Memorandum of Understanding with the Department of Health. Construction Site Runoff ETC assists in reducing the discharge of pollutants from DOT Highways'construction activities by conducting approximately 300 independent construction inspections annually.The results of ETC's efforts have reduced the number of identified major deficiencies by 700/0 over the past five years.Additionally,ETC authored the revised Construction Best Management Practices(BMP)Manual which provides the standards for DOT Highways construction BMP selection and implementation across its projects.ETC is also responsible for the organizing the annual Protect Our Water Conference, increasing attendance to this construction training event by 58%over the past five years,with over 500 attendees in 2021. Post-Construction Site Runoff ETC authored the 2021 Storm Water Post-Construction Best Management Practices Manual,establishing statewide standards that integrated low impact development strategies into HDOT project design. ETC also led the design of post-construction BMP improvement projects totaling$25 million in estimated construction costs.ETC is responsible for the execution of service contracts to maintain post-construction BMPs, resulting in over 350 cleanings,removing over 200 cubic yards of debris. Good Housekeeping:ETC develops and maintains a comprehensive Asset Management System(AMS)to monitor 20,000 drainage assets and 250 lineal miles of DOT Highways rights-of-way.ETC is responsible for the execution of service contracts to maintain DOT Highways'drainage infrastructure,removing over 23,300 cubic yards of debris through various activities including street sweeping and MS4 structure cleaning.ETC developed and implemented a novel photo-based visual trash assessment,using car mounted cameras to qualitatively assess trash levels in compliance with DOT Highways'trash reduction requirements. Water Quality:ETC successfully negotiated favorable waste load allocations(WLA)for six Total Maximum Daily Load watersheds.Through the successful management of DOT Highways'program,ETC achieved compliance with the Ala Wai Canal,Waimanalo Stream,and Kawai Stream WLAs and is on schedule for compliance with the remaining watersheds.ETC conducts monitoring to assess watershed health and effectiveness of post-construction BMPs.ETC has collected 2,000 samples from 14 different watersheds. Contract Amount: $36,000,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawaii Prime Consultant STANDARD FORM 330(REV.712021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 2 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Environmental Engineering and Consulting Services for Maui District MS4 Program, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Island of Maui(Wailuku,Hawaii) 2028 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawai`i,Department of Transportation-Highways Division Ty Fukuroku (808)873-3535 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) -sir '""" 44* EnviroServices&Training Center(ETC)was contracted to provide environmental compliance support to the State of Hawaii Department of Transportation(DOT),Highways Division,Maui District(HWY-M)to meet stormwater compliance requirements associated with their municipal separate storm sewer system w (MS4).Specifically,HWY-M was issued an MS4 NPDES Permit that required them to develop and implement control measures to prevent polluted runoff from entering and discharging from their MS4. = ASJ! �.. ETC helped to establish and implement the following: . Program Management-As part of the Water Environment Federation's annual National Stormwater and Green Infrastructure Awards,which recognizes high performing MS4 program throughout the country,the ETC/HWY-M team was awarded the 2023 MS4 Phase II Overall Award.This award is given to the single Phase II MS4 that demonstrates excellence in both Program Management and Innovation. "We're proud of each and every member of Highways Maui District's team for attaining this prestigious * , honor,which will serve as a model for other MS4s across the country,"said State of Hawaii Department of Transportation Deputy Director of Highways Robin Shishido. Mapping of MS4 Structures-ETC developed an inventory of M54 structures within the HWY-M M54 area and created GIS maps of the hundreds of structures,including inlets,manholes,pipes,culverts, outfalls,open channels,and junctions. Asset Management System-ETC designed an Asset Management System to identify and display the M54 network inventory,store assets and records,track task performance,schedule preventative maintenance and site inspections,create inspection and summary reports,and deliver program analytic. Public Education and Outreach-ETC developed public education and outreach programs,materials, and partnerships to provide stormwater awareness and training to targeted audiences that included Relevant Services HWY-M M54 users,contractors,DOT personnel,maintenance staff,industrial and commercial businesses,schools,and other stakeholders. Illicit Discharge Detection and Elimination-ETC developed and implemented procedures to respond Stormwater Compliance to detect and eliminate against illicit discharges and illegal connections that impact the HWY-M MS4, v_� Inspections including use of field investigations,industrial and commercial facility inspections,and outfall screening. Construction Best Management Practices-ETC developed and implemented construction plan review, Q_ Geographic Information inspection,and enforcement procedures to manage compliance with sediment and erosion control System(GIS) requirements on HWY-M construction projects. Post-Construction Best Management Practices-ETC developed and implemented procedures to inspect and maintain existing post-construction measures,in addition to review and ensure C Environmental implementation of new post-construction measures that mitigate stormwater runoff on HWY-M Engineering construction projects. ETC also participated in inter-governmental collaboration to revise the DOT Storm Water Post-Construction BMP Manual. Pollution Prevention and Good Housekeeping-ETC assisted in the development of contract bid specifications for the inspection and maintenance of MS4 structures and roadways.These bid In 2023,DOT Maui Highways specifications included requirements for drain inspection and cleaning,pipe inspection and cleaning,and was awarded the"MS4 Phase street sweeping. ETC also engineered plans,specifications,and estimates to repair erosional areas and II Overall Award"by the Water install low impact development(LID)assets. Environment Federation. Contract Amount: $25,000,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Wailuku,Hawai'J Prime Consultant STANDARD FORM 330(REV.712021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.IEXAMPLE PROJECT IKEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 3 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Lahaina Post-Wildfire Stormwater Mitigation&Infrastructure Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Lahaina,Hawaii) On-going 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Department of Transportation Ty Fukuroku (808)873-3535 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) Following the devastating August 2023 wildfires in Lahaina,EnviroServices&Training " Center(ETC)mobilized alongside the U.S.EPA,FEMA,Hawaii Department of Health, Maui County,the Federal Highway Administration,and Hawaii DOT—Highways Maui n'j `'" District(HWY-M)to safeguard coastal waters and rehabilitate roadway infrastructure. Rapid Response Contamination Mitigation As HWY-M's Stormwater Management Program Manager,ETC quickly and safely assessed the damage to DOT and Maui County infrastructure within the burn zone. Priority runoff areas with loose ash and soil were immediately identified were quickly �'�" •" stabilized with an environmentally safe soil tackifier by leveraging existing maintenance _ contracts.Simultaneously,ETC engineers assessed the State-owned and Federally- aided roadway segments that intersect the burn zone for rapidly available and easily deployable solutions to keep ash,heavy metals,and petroleum based pollutants out of = the storm drainage system and the Pacific Ocean.Through a combination of accelerated street sweeping,storm drain system cleaning,and deployment of customized Envirosoxx®for overland runoff filtration and inlet protection,our team successfully protected nearshore water quality. Stormwater Capture,Convey,and Treatment System As the winter rainy season quickly approached before potential burn zone pollutants could be completely stabilized or removed,ETC was asked to provide consultation and design a temporary stormwater treatment system that would collect contaminated runoff using the existing county drainage system.ETC engineers in collaboration with other partners designed a temporary aboveground conveyance system to divert upslope .— runoff to a geomembrane-lined basin converted from an existing drainage canal.The detained contaminated stormwater would then be treated using a customized modular treatment train system to remove suspended solids prior to discharge to the ocean. Permanent Drainage&Highway Rehabilitation Relevant Services ETC's civil and environmental engineers are currently advancing long-term infrastructure repairs within the HWY-M right-of-way.Complete plans,specifications, Civil Engineering and estimates have been produced to replace fire-damaged reinforced-concrete culverts and storm lines,raise and reconnect drainage structures,and repave or rehabilitate more than 12 miles of roadway along Honoapi`ilani Highway and connecting routes Rapid Response impacted by wildfire evacuations. Contamination Mitigation Contract Amount: $1,250,000 Stormwater Management Services 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant STANDARD FORM 330(REV.712021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 4 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Lead Service Line Inventory,Water Quality Study,and Related Technical Services PROFESSIONAL SERVICES CONSTRUCTION(If applicable) for the Island of 0`ahu(Honolulu,Hawaii) On-going 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Honolulu Board of Water Supply Erwin Kawata (808)748-5850 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) Via, `'. EnviroServices&Training Center(ETC)provides professional water quality and technical services as a subconsultant for the Honolulu Board of Water Supply(BWS)in support of the recently finalized Environmental Protection Agency(EPA)Lead and Copper Rule Revision(LCRR)compliance efforts.The ' purpose of the LCRR is to provide better protection to consumers,especially children at schools and childcare facilities,from the risks of lead exposure by identifying and removing potential sources of lead contamination from public and private water systems. More specifically,ETC's work includes: I 1)Assisting in the development of a lead service line inventory to identify the materials of service lines connected to the public water distribution system by reviewing databases,engineering plans, specifications,as built drawings,and plumbing codes.Creating a list of all laterals and materials, , including unknown materials(e.g.,lead status unknown).Conducting field investigations for laterals of unknown materials by opening meter boxes and conducting physical tests and observations including magnetic check,scratch test,color inspection,joints and fittings inspection and in field lead tests on both utility owned and customer owned sides of the meter. 2)Developing and implementing a Sampling Plan based on the revised tiering criteria of the LCRR to classify all service lines in the inventory,selecting the required number of sites to be sampled(based on water system size/population served),developing standard operating procedures,submitting samples to a certified lab,reviewing and compiling results,and providing technical guidance. Implementing"Find and Fix"procedures,including water quality parameter sampling and follow-up sampling as necessary.Notification of tap sample results to customers. 3)Assisting with the development of full and partial Lead Service Line(LSL)Replacement Plans.The Relevant Services LSL replacement plans include procedures for notifying customers of replacement actions,providing and tracking water pitcher filters,replacement goal rates in the event the lead trigger level is Lead Service Line exceeded,procedures for flushing,risk mitigation,and replacing plumbing. Inventory Development 0 4)Identifying and compiling a list of school and childcare facilities served by the water system.Similar to residential sampling efforts,preparing a sampling plan,communicating with stakeholders, developing standard operating procedures,submitting samples to a certified lab,reviewing and Customer Tap Water compiling results,and providing technical guidance. Sampling Plan Notable Project Accomplishments: • Optimized sampling activities through the implementation of productive workflow processes and highly-trained staff.Frequent and early communication with stakeholders also fostered positive School&Childcare interactions with residents,school administrators,analytical laboratories certified by the EPA,and �°fn_°1 Facilities Sampling Plan regulators.This effort increased tap sampling participation rates in all water systems and reduced the number of invalid samples due to sampling errors and laboratory handling. • Utilization of innovative technology to track and centralize project data in a Geographic Information Through 2025,ETC will also be System(GIS)database,which allowed the project team to visualize water meters,service line working with the Kauai Dept of laterals,and property parcel data leading to more efficient execution of field activities • Gathered meta-data from all field activities providing additional metrics to improve time Water,Hawai I Dept.of Water management and overall performance. Supply,and the HHFDC on LCRR projects totaling more than$3M. Contract Amount:$1,270,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawaii Subconsultant STANDARD FORM 330(REV.7/2021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 5 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Off-Site Contamination Unit,Site Investigation,and Remedial Action PROFESSIONAL SERVICES CONSTRUCTION(If applicable) at Kapalama Incinerator Site(Honolulu,Hawaii) On-going 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER City&County of Honolulu Department of Environmental Services Julie Ann Leano (808)768-3424 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) EnviroServices&Training Center(ETC)was retained by the City&County of Honolulu, Department of Environmental Services(ENV)as the prime consultant to provide environmental consulting services associated with further remediation and investigation of residual contaminants associated with historical incinerator operations. Project tasks included the preparation of a Summary Analysis Report to gather site-related ti_- information into a single document and a Corrective Action Work Plan to detail activities to be __ _ performed to address residual contaminants located within the former incinerator site boundaries. - r Corrective Action was implemented through collection of multi-incremental soil samples to further characterize areas of suspect contaminant impact(remedial investigation phase), excavation/segregation/hauling/disposal of contaminated soils and incinerator ash,and collection of confirmation soil samples to evaluate the effectiveness of the removal action.A Corrective rv° Action Report was prepared to document findings of the initial remedial investigation phase,_ removal/transportation/disposal of nearly 500 tons of residual contaminated soil and ash,results " sA. is of the air monitoring activities implemented during the removal action,results of the confirmation soil samples,and the remaining environmental hazards at the site associated with the residual contaminant concentrations. .. . ETC was also tasked with modeling ash dispersion from the former incinerator stack using a commercial version of the USEPA AERMOD dispersion model to predict potential areas of concern pertaining to impacts from ash outfall.An Off-Site Investigation Work Plan presented the planned approach objectives,and methodology for the initial phase of the off-site investigation to address perceived gaps in the existing data associated with the extent of potential impacts from former incinerator operations.Implementation of the Off-Site Investigation Work Plan included collection Relevant Services of multi-incremental surface soil samples,discrete subsurface soil samples,and discrete sediment samples from the Kapalama Drainage Canal.Findings from the investigation were documented in a Site Investigation Report and Environmental Hazard Evaluation.Thereafter,an Environmental Phase III Remedial Hazard Management Plan was prepared to document and address the existing environmental Investigation hazards.Furthermore,an interim engineering control consisting of geotextile fabric cover was installed over exposed surface soils containing elevated lead concentrations within the Kokea Street parking lot.This interim control is currently being monitored and maintained on a monthly dArnI Environmental Hazard basis until the start of planned site development. Evaluation(EHE) Contract Amount:$640,000 Environmental Hazard Management Plan 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawaii Prime Consultant STANDARD FORM 330(REV.712021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 6 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Voluntary Response Program-Environmental Site Investigation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) of Former Waialua Sugar Mill(Waialua,Hawaii) 2019 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Castle&Cooke Waialua,LLC Chris Lovvorn (808)548-3714 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Based on historical operations at the Waialua Sugar Mill facility,the suspect contaminant sources generally included former underground and aboveground fuel storage tank systems,pesticide mixing and loading activities,vehicle maintenance activities,electrical transformer storage,former I 40110111-, sugarcane processing operations,and a commercial vehicle towing baseyard. `� ! Under the VRP,ETC investigated the extent of soil and groundwater contamination for metals (arsenic,cadmium,lead,mercury,thallium,vanadium,zinc);herbicides/pesticides;dioxins/ furans;polychlorinated biphenyls(PCBs);total petroleum hydrocarbons as diesel/gas/oil(TPH-D, TPH-G,TPH-0);methyl tertiary-butyl ether/benzene/toluene/ethylbenzene/xylenes(MBTEX); dimethyl phthalate;polynuclear aromatic hydrocarbons(PAHs);and halogenated volatile organic compounds(HVOCs).In order to assess the potential impacts,the site was divided into 27 surface and/or subsurface decision units.Discrete and multi-increment soil samples were collected from these 27 decision units.Monitoring wells were also installed and sampled using low-flow _,.... methodology to assess potential impacts to the underlying groundwater.Approximately 80 discrete soil samples,multi-increment soil samples,and groundwater samples were collected - „ A and analyzed.In addition,ETC also conducted personal,perimeter,and work area air monitoring, .46 during all aspects of the project to protect the workers and surrounding public. Deliverables for the project included a Phase I ESA,conceptual site model,and general and ,. detailed site investigation plan.Specifically,a Site Investigation Report and Environmental Hazard ,.. *! Evaluation(SI-EHE)was prepared to document site investigation activities,compare data to applicable DOH EALs,and evaluate/discuss all potential environmental hazards associated with the site.A Remedial Alternatives Analysis(RAA)evaluated four potential remedial alternatives, which were then compared to nine evaluation criteria.Upon completion of the RAA,a Draft Remedial Action Memorandum(Draft RAM)was created to summarize findings and activities performed to date.A Public Participation Plan was also developed to solicit input from members of the affected public regarding the planned work to be completed on portions of the site to mitigate environmental hazards.A Public Meeting was then held and comments obtained through the public participation program were used to create a Final RAM and develop a Remedial Action Work Plan. Relevant Services Prior to implementation of the selected remedial action,an interim Environmental Hazard Management Plan(EHMP)was prepared for use by the site contractor.Construction activities for Environmental Site the implementation of the selected remedial action were monitored to ensure adequate controls Assessment(ESA) were maintained to minimize or eliminate airborne contaminant hazards.Following completion of construction,a Remedial Action Report was completed to document the implementation of the d final remedy and a final EHMP for managing the remaining environmental hazards on-site was el CO Environmental Hazard prepared.In December 2018,the DOH issued a Letter of Completion,subject to the terms and - , Evaluation conditions of an Environmental Covenant Agreement,the final EHMP,and the completion of a Groundwater Monitoring Program. ^©- Remedial Action "• &Design Contract Amount:$750,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant STANDARD FORM 330(REV.7/2021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 7 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Environmental Remedial Action for Various Sites in the Naval Facilities Engineering PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Command Pacific Area of Responsibility On-going 2022 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER NAVFAC Pacific Jennifer George (808)472-1462 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) • ': I� ETC formed a joint venture named EATC JV and was awarded a contract to support the j -40 environmental remedial action program at various sites in the NAVFAC Pacific AOR.NAVFAC �, , Pacific awarded four such fixed-price remedial action contracts to small businesses,with an ' ` t,. Fy overall contract pool worth up to$40 million over a 5-year ordering period. Under the contract,the EATC At competed with other contract holders to secure task orders that facilitate remedial actions at environmentally impaired sites,predominately at Navy and Marine Corps installations.Although services targeted various sites primarily on the Island of 0`ahu,the contract also included work to be performed at sites within the NAVFAC Pacific AOR,including Guam,the Commonwealth of Northern Mariana Islands,United States Minor ' outlying Islands,Japan(including Okinawa),and Diego Garcia.The contract targets Superfund National Priority List(NPL)ranked as well as non-NPL sites,Resource Conservation and Recovery Act(RCRA),underground storage tanks(USTs),operational small arms firing ranges, and other sites that require remedial action and other long-term management activities. ` Our services included,but were not limited to,the following: • Removal and remedial action construction and operations • Excavation,hauling and disposal of solid and hazardous wastes • Closure and/or replacement of underground storage tanks and above ground storage tanks • Long-term monitoring,operations and maintenance of remedial action systems; • Inspection and maintenance of land use controls,and Relevant Services • Preparation of appropriate documentation of planned and completed actions wri Solid&Hazardous The EATC JV was awarded 19 of 37 task orders issued by NAVFAC.Tasks included:Closure ¶111 Waste Management of a UST and installation of release response groundwater monitoring wells within Joint Base Pearl Harbor Hickam,with a project value of$155,000;Excavation,packaging,removal, disposal and confirmation sampling of buried drums of petroleum waste at Polaris Point, © Remedial Action Guam,with project value of$360,000;Long-term monitoring of 7 sites at Joint Base Pearl &Design Harbor Hickam,with a project value of$385,000;and Long-term management,remedial action operations,groundwater monitoring and land use controls inspections for 4 sites at Joint Base Pearl Harbor Hickam,with a project value of$180,000.Long term management ' Underground Storage and munitions response in Waikane Valley,with a project value of$105,000. All work was Tank(UST)Closure performed in strict accordance with US Army Corps of Engineers EM385-1-1 Health and Safety Manual which NAVFAC has adopted for this contract.Additionally,ETC employees have received 40 hours of EM385-1-1 training and 30 hours of OSHA Construction Safety Training. Contract Amount:$1,835,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EATC JV(EnviroServices&Training Center,LLC) Honolulu,Hawai'J Prime Consultant STANDARD FORM 330(REV.712O21) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.IEXAMPLE PROJECT IKEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 8 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Hazardous Materials Removal for Various Hawaii Department of Education Schools PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) On-going 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Department of Education,Safety and Security Branch Orasa Fernandez (808)586-3457 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) EnviroServices&Training Center(ETC)provides the State of Hawaii,Department of Education,with the necessary environmental services to support the operations of public schools statewide.ETC conducts identification,sampling and analysis,packaging, flitt transportation,and disposal of various types of solid and hazardous waste throughout , *, the school system.Additionally,we administer emergency spill response,post-cleanup soil and groundwater characterization,and air monitoring services to document cleanup/ Yr remediation efforts. 1. The majority of the work is performed for the science and trades departments. Thousands of unwanted hazardous materials are inventoried and categorized according to chemical compatibility and applicable ultimate treatment technologies.These hazardous materials are then packaged,labeled,and transported in accordance with Department of Transportation hazardous materials regulations to a disposal site. DOT hazardous classes managed during the execution of the contract include: •Class 2 flammable,non-flammable,and toxic gases Relevant Services •Class 3 flammable and combustible liquids •Class 4 flammable solids,spontaneous combustibles,and dangerous when wet rn-ri— Solid&Hazardous •Class 5 oxidizers and organic peroxides Mt Waste Management •Class 6 poisons •Class 7 radioactive •Class 8 acids and caustics /,\ Emergency Chemical •Class 9 miscellaneous substances Spill Response Contract Amount:$1,000,000 /' Waste Characterization: �..� Sampling&Analysis 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant STANDARD FORM 330(REV.712O21) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.IEXAMPLE PROJECT IKEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 9 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Lead-Based Paint Inspection and Risk Assessment of Various Public Housing Sites PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) 2025 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Hawaii Public Housing Authority Lisa Izumi (808)832-5374 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) ; EnviroServices&Training Center(ETC)was contracted by the Hawaii Public Housing Authority(HPHA)to conduct lead-based paint inspections and testing at forty- five multi-family residential facilities located throughout the State of Hawaii.The inspections were performed in accordance with the U.S.Department of Housing and ^ _ Urban Development(HUD)standards b U.S.EPA-certified Lead Risk Assessors utilizing P y 9i x-ray fluorescence(XRF)analyzers.Specific tasks included: • Determination of the appropriate number of dwelling units,common areas,and :. exterior areas requiring testing at each facility in accordance with HUD standards for multi-family housing. • Selection of random units for inspection at each facility. • Identification and testing of building component types and testing combinations at t` c:. each facility. • Preparation of a Lead-Based Paint Inspection Report for each facility. • Lead-based paint inspections resulted in over77,000 lead readings across forty-five • of the forty-seven facilities.A total of over 1,000 dwelling units and over 440 building exteriors were inspected and tested. 1/1 ETC was also issued supplemental contracts to conduct lead risk assessments at eighteen facilities where lead-based paint had been identified.Specifically,the risk :t assessments included visual inspections of the various building components coated with tw lead-based paint to identify deteriorated paints(paint lead hazards),collection of dust wipe samples to identify dust lead hazards where deteriorated lead-based paints were identified,and collection of soil samples to identify potential soil lead hazards. As a continuation to the existing contract,ETC provided architectural and engineering Relevant Services services for lead-based paint abatement design for four facilities.Services included the preparation of plans and specifications,bidding assistance,bid review,contractor submittal review and construction administration.During construction,ETC also Q Hazardous Materials provided abatement oversight,daily environmental air monitoring,and lead clearance Inspections&Surveys sampling. Lead-Based Paint In 2023 and 2024,an additional nine Lead-Based Paint Inspections and eleven Lead- ' Abatement Design Based Paint Risk Assessments were performed. Air Monitoring, Contract Amount: $1,160,000 Clearance Sampling& Abatement Oversight 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant STANDARD FORM 330(REV.712021) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 10 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Environmental Services for Various Hawaii Department of Education Schools PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (Statewide,Hawaii) On-going 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Hawaii,Department of Education Hae-Dong Lee (808)836-7787 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) EnviroServices&Training Center(ETC)was retained by Bowers+Kubota Consulting to provide environmental services for a variety of projects at Department of Education (DOE)schools and facilities throughout the State of Hawaii.The work has been performed under a number of DOE programs including Design Services for Job Order Contracting(JOC),Facilities Asset Management(FAM)—Building Envelope Assessments and Design,District Project Coordination(DPC)at Various Facilities in the State of Hawaii,and Various Statewide Architectural,Building Envelope and Fire Assessments ° and Design—School Facilities Authority(SFA)Preschools.The work is assigned on a site-by-site and project-by-project basis as requested by the DOE.To-date,ETC has — conducted or is currently conducting more than 550 hazardous materials surveys and/or air monitoring projects throughout the State of Hawaii. , Specifically,ETC's services included: • Reviewing existing Asbestos Hazard Emergency Response Act(AHERA)reports and any supplemental hazardous materials survey reports. Relevant Services • Inspecting and identifying known or suspect hazardous materials. • Sampling and analyzing materials known or suspected to contain asbestos,lead paint, Hazardous Materials arsenic,mercury,and/or PCBs. Q Inspections&Surveys • Conducting soil sampling and analysis as required. • Preparing a comprehensive report for each facility documenting hazardous materials inspection,sampling,and analysis. Abatement Oversight& • Preparing contract documents(abatement specifications)containing detailed Construction Monitoring information and instructions for the removal and disposal of known hazardous materials that may be encountered during renovation. /, \ Asbestos&Lead • Preparing hazardous materials abatement cost estimates. Air Monitoring • Reviewing RFIs and contractor submittals • Providing project monitoring services during construction to ensure hazardous materials were removed in their entirety and that removal and disposal activities were conducted in accordance with Federal and State regulations. To-date,ETC has conducted or • Conducting area air monitoring during removal work,visual and/or air/wipe sampling is currently conducting more after removal to clear the area for re-occupancy and monitoring the disposal practices than 550 hazardous materials of the abatement contractors.Reviewing abatement closeout documentation for surveys and/or air monitoring record keeping compliance. projects throughout the State of Hawaii. Contract Amount: $1,860,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Subconsultant STANDARD FORM 330(REV.7/2021) G.KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28.EXAMPLE PROJECTS LISTED IN SECTION F 26.NAMES OF KEY PERSONNEL 27.ROLE IN THIS CONTRACT (Fill in"Example Projects Key"section below before completing table.Place"X"under (From Section E,Block 12) (From Section E,Block 13) project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Kyson Morikuni Managing Principal X X X X X X X X X X Michael Yee Principal/Project Manager X X X X X X X X X X Gregory Perry Principal/Waste Management X X X X X X Project Manager Brant Tanaka Principal/Project Manager X X X X X X X X Damon Hamura Principal/Project Manager X X X X X X X X X Mark Ohigashi,P.E. Project Manager/ X X X X Environmental Engineer Vijaya Tummala,P.E. Senior Civil/Environmental X X X X X Engineer Matthew Stimpson Project Manager/Senior X X X X Environmental Scientist Kylie Luke Waste Management Manager X X X X X X X Matthew Tolley Senior Environmental Scientist X X X X Tonya Ketza Project Manager/ X X Environmental Planner Codee Samala-Passos,P.E. Civil/Environmental Engineer X X Sara Marvin Industrial Hygiene X X X X Supervisor Akari Ihara Industrial Hygienist X X X Mailea Miller-Pierce Environmental Scientist X X X Christopher Gallacher Environmental Scientist X X 29.EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) Storm Water Management Program for the Island of 0`ahu, 6 Voluntary Response Program,Environmental Site Department of Transportation Investigation of Former Waialua Sugar Mill Environmental Engineering and Consulting Services for Fixed Price Remediation Action Contract(FRAC)for Various Sites in the Maui District MS4 Program,Island of Maui Naval Facilities Engineering Command Pacific Area of Responsibility 3 Lahaina Post Wildfire Stormwater Mitigation&Infrastructure Rehab 8 Hazardous Materials Removal for Various Schools for Department of Education 4 EPA Lead and Copper Rule Revision(LCRR)Compliance 9 Lead-Based Paint Inspection and Risk Assessment, Hawaii Public Housing Authority Kapalama Incinerator,Off-Site Contamination Unit, Environmental Services for the Department of Education, 5 Site Investigation and Remedial Action 10 Various Schools Statewide STANDARD FORM 330(REV.7/2021) H.ADDITIONAL INFORMATION 30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY.ATTACH ADDITIONAL SHEETS AS NEEDED. ENVIRONMENTAL CONSULTING & ENGINEERING SERVICES We'll Take Care of It. 505 Ward Avenue,Suite 202 Honolulu,Hawaii 96814 (808)839-7222 info®gotoetc.com i /Si, enviro SERVICES www.gotoetc.com &TRAINING CENTER,LLC . . �� enviro Statement of Qualifications �� SERVICES EnviroServices&Training Center(ETC) is a Hawaii-based environmental consulting and engineering firm that has been serving our WhyChoose Islands and the Pacific since 1994.With nearly 60 full-time professionals , based on 0`ahu and Maui, our team brings deep experience,technical EnviroServices? expertise, and local perspective to every project. In 2024, ETC was proud to be ranked #1 on Pacific Business News' Hawaii Environmental Consulting Firms List and #16 on their Hawaii Engineering Firms List—recognitions that reflects our long-standing commitment to quality and service. 1111 't%iip t+761ic*�iu !!1u■ ®e.cat.e !-, : .r 3 ETC OFFICES ,r , +� �" ' , ON 2 ISLANDS / .` '41 z. , ,,, ,1 1 -4—...": - ( ' A R` f \ t i -'''''' i7:' mitim ` ENVIRONMENTAL rr;,&..'•.,. .. . . .. . v CONSULTING FIRM We provide a comprehensive range of environmental services, including IN HAWAI`I stormwater management,environmental compliance and permitting 2024 Pacific Business News'List site investigations and assessments, hazardous materials and waste management, air monitoring, health and safety planning, remediation support, and regulatory training.Our team has successfully led thousands of projects across the state and throughout the Pacific region—including Guam, Saipan, Kwajalein,Johnston Atoll, and the Federated States of Micronesia. Many of the challenges our clients face are time-sensitive, high-stakes, and We've learned heavily regulated. Our ability to respond quickly with experienced, in-house clients want to hear professionals sets us apart. By maintaining core capabilities internally,we five very simple reduce reliance on subcontractors, improve quality control, and remain agile even during surge workloads. words, "We'll Our multidisciplinary team includes biologists,geologists, environmental Take Care of It" scientists, engineers, inspectors, GIS specialists, industrial hygienists, and hazardous materials technicians—all working together to deliver thoughtful, At ETC, we strive practical solutions tailored to Hawaii's unique environmental landscape. to turn those words At ETC,we don't just check boxes—we solve problems.We do it with into a promise. urgency,with integrity, and always with Hawaii in mind. I, www.gotoetc.com SENRVICES CENTER LLC We Are a Full -Service Environmental Consultancy We are the only Hawaii-based company designed to help our clients navigate a myriad of environmental regulations with our in-house, multi-disciplined professionals. Our range of services include: 0Environmental Site Investigation Compliance & Remediation • Environmental Compliance Plan Preparation • Phase I and Phase II Environmental Site • Environmental Management System (EMS) Assessments (ESA) Planning & Implementation • Environmental Hazard Evaluations and • National Pollutant Discharge Elimination System Environmental Hazard Management Plans (NPDES) Permitting & Compliance • Remedial Investigation,Action, and Design • Spill Prevention Control &Countermeasure (SPCC) • Underground Storage Tank(UST) Closures Preparation and Compliance and Release Response • EPA/DOT/OSHA Compliance Training Stormwater 2 Industrial Hygiene ./,. Management & Safety • Asset Management System/Geographic • Hazardous Materials (Asbestos, Lead,Arsenic) Information System Implementation Surveys and Compliance Plans • NPDES Program Design & Implementation • Abatement Design Specifications (M54, Industrial, Construction, Dewatering) • Air Monitoring, Clearance Sampling and • Stormwater Management Plan (SWMP) Abatement Oversight Preparation and Implementation • Indoor Air Quality Investigations Solid & Hazardous Drinking Water Waste Management U Quality Compliance • Emergency Chemical Spill Response • EPA Lead &Copper Rule Revisions • Waste Identification, Packaging, Profiling, (LCRR) Compliance Transportation, and Disposal • Lead Service Line Inventory Development • Small Business Drop-Off Program • Customer Tap Water Sampling • Waste Process Audit and Minimization Contact Us 505 Ward Avenue,Suite 202,Honolulu,HI 96814 • (808) 839-7222 • info®gotoetc.com SERVICES Environmental Compliance d—' yp°y, a a.R t'n - e 7 w \..,_ � ' g,�. 417.00, ( % A -,..-.7' - x 7�[ Eyed�'� • nz � a � Y e - 4 � • �.-.-'�'`- �, . q t C.^'Ys, ,H••...,a ' II «.a,5.`i.. _ ""+I EnviroServices &Training Center (ETC) has built its reputation for SERVICES excellence in the environmental compliance field by assisting clients • Environmental Compliance Plan in understanding their short- and long-term environmental liabilities • National Pollutant Discharge Elimination and developing targeted programs to help mitigate their risks in this System(NPDES) complex and ever-changing regulatory arena. Our diverse expertise • Permitting and Compliance enables us to assist various industrial, commercial, institutional, and • Spill Prevention Control and government agencies. Countermeasure(SPCC)Plan • Stormwater Pollution Prevention Plan • Erosion and Sediment Control ti Stormwater Compliance • Best Management Practices(BMP)Plan y�. As Hawaii's leader in stormwater compliance solutions, • Solid Waste Management ETC can provide a roadmap to navigate the many • Environmental Management System stormwater hurdles faced by industrial, commercial, and construction activities. TRAINING AND CERTIFICATIONS • Certified Inspector of Sediment and —�, Environmental Compliance Plan Erosion Control(CISEC) .(©_J ETC assists clients by identifying applicable environmental • Certified Professional in Municipal regulatory requirements, and providing customized plans Stormwater Management(CPMSM) that include site maps, asset/liability inventories, permitting • that Professional in Erosion and Sediment Control(CPESC) requirements, inspection and maintenance frequencies, roles • Certified Professional in Industrial and responsibilities, and training and reporting requirements. Stormwater Management(CPISM) • Erosion and Sediment Control O Spill Prevention Control and Countermeasure (SPCC) Coordinator(ESCP)for City&County Honolulu Ho ETC has licensed professionals who who can prepare of of Ho Certified• Water Pollution Plan Preparer and certify SPCC Plans that meet the EPA's Oil Pollution (CWPPP) Prevention requirements. • Field Sampling and Testing Qualification Program • Certified Hazardous Materials Manager LEARN MOR at www.gotoetc.com or scan the QR code above. (CHMM) CONTACT US at(808) 839-7222 or info@a gotoetc.com. e RAC E Site Investigation & Remediation &TRAINING CENTER,LLC 'Ma STOP r s fW Sys a,w hvL`Yi 15" 6� v -;;;4,,/ r a^^ _ '' , �* ram' `fie i(1.111' - — --- '�'# -7 yr a ®‘ .� dr,. ',X\ E ., - 1<TMaet� \ .-' '�gym ,! 4'. .tr EnviroServices &Training Center(ETC) offers clients a practical approach SERVICES to meeting their environmental site assessment, investigation, and remediation goals. Our personnel have provided a wide variety of services Phase I Environmental Site Assessments and Preliminary for landowners, developers,attorneys, architects, engineers,contractors, Investigations and federal/state/county agencies throughout the State of Hawaii. • Phase II Environmental Site Assessments and Site Investigations 4ESAEnvironmental Site Assessments (ESA) • Remedial Investigations and 's • are conducted by our Environmental Professionals Feasibility Studies (EPs) who offer over 20 years of experience conducting • Remedial Action and Design ESAs throughout the State of Hawaii. ETC is known for our • Environmental Hazard Evaluations thorough assessments and our ability to formulate practical • Environmental Hazard Management strategies to address environmental issues that may be Plans discovered through the ESAs. • Underground Storage Tank(UST) Closures and Release Response 4 Environmental Hazard Evaluations and Environmental ____� Hazard Management Plans TRAINING AND CERTIFICATIONS Environmental hazard evaluations (EHEs) utilize site • OSHA 40 Hour HAZWOPER investigation data to assist in developing potential response • OSHA 8 Hour HAZWOPER, actions. ETC personnel have been closely involved with the Supervisor Hawaii DOH's implementation of EHEs and Environmental • OSHA Permit-Required Confined Hazard Management Plans within the State's regulatory Space framework. • DOT Hazardous Materials Handling • Army Corps of Engineers, © Remedial Action and Design Construction Quality Management 1 . ETC's staff is well-versed in the guidelines provided in the for Contractors Hawaii DOH's Technical Guidance Manual, which allows ETC to collaborate with its clients to develop and design effective, cost-efficient remedial solutions that comply with regulatory goals. LEARN MORE at www.gotoetc.com or scan the QR code above. CONTACT US at (808)839-7222 or info@gotoetc.com. nrmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmom Client References SERVICES &TRAINING CENTER LLC The following are names and phone numbers of clients who may be contacted, many of whom have rendered services from EnviroServices &Training Center during the preceding year. ,°F TRgNp Rodney Gerard, P.E. Environmental Management Section Engineer z State of Hawaii Department of Transportation s> Highways Division-Oahu District �rE°F 14/`4' (808)489-0917 of TRgN n° Ty Fukuroku, P.E. Environmental Management Section Program Manager z State of Hawaii Department of Transportation s> Highways Division-Maui District 14-OF .I'ts (808)873-3535 Sean O'Keefe ���;, Director of Environmental Affairs ALEXAN DER&BALDWI N Alexander&Baldwin, Inc. (808)877-2959 Brian Bowers, P.E. Principal Me‘ Bowers+ Kubota BOWERS•KUBOTA (808)836-7787 Kyle Morrison HAWAI`I KAPI'OLANI Director PACIFIC PALI MOMI STRAUB HEALTH WILCOX Pali Momi Hospital (808)485-4481 enviro Licenses: Professional Engineer a TRAINING CENTER,LLc SERVICES m CLASSES(ACTIVE):CE Civil License Number Expiration date PE-17812 4/30/2026 STATE OF HAWAII DEPARTMENT OF PROFESSIONAL ENGINEER COMMERCE AND CONSUMER PEEP. ❑ tiO CLASS(ES):CE CIVIL MARK TOHIGASHI ..."'� • SIGNATURE OF LICENSEE _- CLASSES(ACTIVE):CE Civil I License Number Expiration dale ❑� - -❑� PE-15516 4/30/2026 } v et- t. .�CFHAY II�P.ThEra AND UWR„FFu� 4 r y i PROFESSIONAL ENGINEER 0i=p CLASS(ES):CE CIVIL VIJAYA LTUMMALA I I I I I I SIGNATURE 0 CENSEE: �f •.. h;II: CLASSES(ACTIVE):CE Civil License Number Expiration date rl PE-21241 4/30/2026 STATE OF HAWAII DEPARTMENT OF COMMERPROFESSIONAL ENGINEER ce o MEanrraias ■ ie CLASS(ES):CE CIVIL - ti 0 CODEE TORAO NALUKEApAAdq.' A SAMALA-PASSOS SIGNATURE OF LICENSEE • um um u. enviro Licenses/Accreditations: SERVICES &TRAINING CENTER,LLC Industrial Hygiene Sara Marvin State of Hawai'i State of Hawai'i Asbestos Certification Lead Based Paint Activities Certification \ Training Course Exp.Dates Expiration Dates: ' "A Inspector- n;a W nia MP 09/05/25Supervisor- .a t rileCS nla PO 04/05/25 Risk Assessor- 09/25/2027 '' I + INS 09/05/25 PM 09/27/23 Project Designer- 12/01/2026 M 1' Worker- n/a W=Worker i Marvin CS=Cont./Sup. Marvin 1), Sara INS=Inspector EnviroServices&Training Center,LLC PD=Project Designer Sara HIASB-4361 MP=Mgmt.Planner State Exp. Date PM=Project Monitor Certification# PB-0973 Akari Ihara State of Hawaii STATE OF HAWAI'I Lead Based Paint Activities Certification s, 'fi'',1 ASBESTOS CERTIFICATION Expiration Dates: i;a.„.�" Inspector- n/a I�� Supervisor- n/a Akari R. Risk Assessor- 09/17/2025 EnviroServices&Training Center,LLC Project Designer- n/a �' HIASB-1014 Worker- n/a - Tnsining Course Exp Dates Ihara w n/e w=worker CS "le CS=Cont/Sup INS WIMPS INS Inspector Akari MP ale PD Project Designer --- t PD o/03rna am Na,�PManager STATE©CP.DATE4/20/2026 Certification# PB-0056 1' >„ Jacob Vasquez State of Hawaii State of Hawaii Lead Based Paint Activities Certification Asbestos Certification Expiration Dates: TCaining Coulee Exp.Dates Inspector- 03/27/2027 W n/a MAP 09/27/2S Supervisor. nfa Illt :..,-r, CS n/a PD Oa Risk Assessor- n/a'_` INS 09125/25 PM Oa Protect Designer- nfa Worker- nra 1.. , W=Worker li r,, „.. Vasquez CS=Cont/Sup. Vasquez Jacob M. (NS=Inspector EnviroServices Si Training Center PD-Project Designer Jacob Marc jh HIASB-5676 MP=Mgmt Planner State Exp.Date 10/07/2025 PM=Project Monitor Certification'# PB-1446 Stevie Ward State of Hawaii State of Hawaii Asbestos Certification Lead Based Paint Activities Certification Expiration Dates: Training Course Exi Dates Inspector- 09/26/2025 rrM tV a MP n a 'Supervisor-in/a CS ma PO n Risk Assessor- n/a • " INS 07/27/23 PM 10/:3/23 "/ Project Designer: rva 1 Worker- n/a •�± Ws Works F,,,, - Ward . CS=Cant Sup Ward Stevie L. INS=Inspector EnviroServices and Training Center,LLC Pp=Project Designer Stevie.L. HIASB-5234 MP=Mgmt Planner State Exp.Date 07:29/2023 PM=Project Monitor Certification# PB-1311 i H ;1'95p I 174 ' p 'rid: 2 �" . ' a° 0Hp RINp. STATE OF HAWAII STATE PROCUREMENT OFFICE CERTIFICATE OF VENDOR COMPLIANCE This document presents the compliance status of the vendor identified below on the issue date with respect to certificates required from the Hawaii Department of Taxation(DOTAX),the Internal Revenue Service,the Hawaii Department of Labor and Industrial Relations (DLIR),and the Hawaii Department of Commerce and Consumer Affairs (DCCA). Vendor Name: ENVIROSERVICES & TRAINING CENTER, LLC Issue Date: 04/08/2025 Status: Compliant Hawaii Tax#: New Hawaii Tax#: GE-0051929088-01 FEIN/SSN#: XX-XXX1305 UI#: XXXXXX9320 DCCA FILE#: 831 Status of Compliance for this Vendor on issue date: Form Department(s) Status A-6 Hawaii Department of Taxation Compliant 8821 Internal Revenue Service Compliant COGS Hawaii Department of Commerce&Consumer Affairs Compliant LIR27 Hawaii Department of Labor&Industrial Relations Compliant Status Legend: Status Description Exempt The entity is exempt from this requirement Compliant The entity is compliant with this requirement or the entity is in agreement with agency and actively working towards compliance Pending A status determination has not yet been made Submitted The entity has applied for the certificate but it is awaiting approval Not Compliant The entity is not in compliance with the requirement and should contact the issuing agency for more information ACOREP CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) �...----- 12/26/2024 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Kari Baekkelund ACW Group, LLC PHONE 808 535 5061 FAX 1000 Bishop Street, Suite 600 (A/C,No,Ext): (NC,"°): Honolulu HI 96813 ADDARESS: kbaekkelund@acwhawaii.com INSURER(S)AFFORDING COVERAGE NAIC# License#:0M63276 INSURERA:Admiral Insurance Company 24856 INSURED ENVI&TR-01 INSURER B: First Insurance Company of Hawaii EnviroServices&Training Center, LLC. 505 Ward Ave., Ste. 202 INSURER C:Crum&Forster Indemnity Honolulu HI 96814 INSURERD: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1745939311 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE INSD DDL S W UBR POLICY EFF POLICY EXP NSD VD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY Y Y FEI-ECC-12158-12 1/1/2025 1/1/2026 EACH OCCURRENCE $1,000,000 DAMAGE RETED CLAIMS-MADE X OCCUR PREMISESO(Ea occurrence) $50,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY PRO- JECT LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ B AUTOMOBILE LIABILITY Y Y CBA1000223231-28 1/1/2025 1/1/2026 COMBINED SINGLE LIMIT $ (Ea accident) X ANY AUTO BODILY INJURY(Per person) $1,000,000 OWNED SCHEDULED BODILY INJURY(Per accident) $1,000,000 AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE $1,000,000 AUTOS ONLY AUTOS ONLY (Per accident) A UMBRELLA LIAB X OCCUR Y Y FEI-EXS-12159-12 1/1/2025 1/1/2026 EACH OCCURRENCE $4,000,000 X EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ C WORKERS COMPENSATION Y 4087480338 1/1/2025 1/1/2026 X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBEREXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 A Pollution Y Y FEI-ECC-12158-12 1/1/2025 1/1/2026 PER OCC$1,000,000 $2000000 A Professional(Inc!E&O) Y Y FEI-ECC-12158-12 1/1/2025 1/1/2026 PER OCC$1,000,000 $2000000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) PROOF ONLY CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ""PROOF OF INSURANCE"" AUTHORIZED REPRESENTATIVE ''' ''; (5%-- ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Additional Information: Contract Management At EnviroServices&Training Center(ETC),we take a strategic,structured approach to project management to ensure successful execution across all assignments.Our methodology focuses on maintaining scope,schedule,and budget while proactively identifying and mitigating risks.Through a combination of experienced personnel, proven project controls,and technical expertise, we efficiently manage concurrent projects while maintaining the highest standards of quality and compliance. Our Approach At ETC,we take a proactive, results-driven approach to managing projects.Our fully staffed team has the capacity to execute all work efficiently,ensuring timely completion without sacrificing quality. Rather than handling tasks in a strict sequence,we operate on a concurrent schedule,allowing us to manage multiple assignments at once while staying flexible to project demands. How We Work Every project starts with a clear end goal. From there,we focus on five key areas:team,coordination, monitoring,action,and completion.We build the right team for the job,assigning work based on each team member's specialized qualifications and experience.This ensures tasks are handled by professionals with the right expertise while maintaining balance across workloads. Our Project Managers and Technical Leads provide oversight to maintain a high level of commitment and ensure capacity is never a limiting factor in successfully executing concurrent project assignments. Staying on Track Communication and tracking are at the core of our project management approach.To ensure each project stays on track with its scope,schedule,and budget,the Project Manager will monitor task and project progress on a weekly basis,tracking key elements like labor,costs,and deliverables.A Master Schedule will be developed and maintained, using tools such as Gantt charts to establish and oversee concurrently performed work assignments. In more complex scenarios,we will employ Critical Path Method (CPM)and/or Program Evaluation and Review Technique(PERT)flowcharting to ensure that dependencies and timelines are accurately managed. To further enhance collaboration and streamline communication,our team has integrated Monday.com,a cloud-based work management platform,across our office network.This platform helps organize and track projects while enabling seamless collaboration with stakeholders, including subconsultants and clients. Monday.com's integration tools allow us to synchronize efforts,ensuring alignment and transparency throughout the entire project lifecycle. In addition,we leverage traditional project management software like Microsoft Project,SureTrak,and Primavera to monitor task progress and keep projects moving forward efficiently. Problem Solving Challenges are an inevitable part of any project,but we prioritize identifying emerging problems early to minimize their impact. To do this, ETC sets clear milestones and performance indicators,allowing us to proactively monitor a project's progress.Status reports are shared at three levels:first with the team,then with management,and finally with the client.These reports provide a snapshot of the project's status,including a brief description,the final deadline,the current schedule and budget status,and any variances,along with expectations for the future. When issues arise, ETC takes swift corrective action. In many cases,cost overruns are linked to labor-related issues,which may require reevaluating the team composition and resource allocation—not just increasing personnel.Additionally,we conduct a post-project evaluation and final review to ensure every detail is completed,with an in-depth critique conducted by the review team for quality control purposes. Project Closeout A project isn't considered complete until every detail is addressed.We conduct a post-project evaluation to assess outcomes and identify areas for improvement.The final review includes a critique from the review team to ensure quality control and that all deliverables meet our high standards.By maintaining continuity throughout the project lifecycle,we capture lessons learned, prevent the duplication of past efforts,and ensure that all regulatory and stakeholder relationships are properly managed.This ongoing review process helps us fine-tune workflows, reduce risks,and apply best practices to future projects. Additional Information (cont.) Project Management Structure ETC's project management structure is designed to ensure seamless coordination,effective communication,and timely project delivery.Our approach is built on key principles that guide the execution of every project: • Integrated CTO Team:We begin with the early deployment of a dedicated Contract Task Order(CTO)team,bringing together all technical disciplines needed for the project lifecycle.This integrated team ensures alignment and comprehensive coverage of all project needs. • Clear Objectives&Continuous Oversight: From the outset,clear project performance objectives are established and maintained throughout the project.This consistency enables us to manage scope,schedule,and budget effectively and make adjustments as necessary to meet client needs. • Continuity of Key Personnel:To ensure project consistency and capture valuable insights, key personnel remain assigned to the project throughout its lifecycle.This continuity helps avoid duplication of efforts,fosters strong stakeholder relationships, mitigates risks,and supports schedule and cost management. • Empowerment&Accountability:We assign responsibility and authority at the appropriate levels,ensuring decision-making is efficient and well-managed. Each team member is empowered to make decisions within their scope,streamlining project execution and ensuring accountability. • Clear Communication&Authority Understanding:Communication between the CTO team,Contracting Officer(KO),and Contracting Officer's Technical Representative(KOTR)is prioritized to ensure all project changes, particularly those related to cost,schedule,and scope,are clearly communicated and handled in alignment with contractual obligations. CTO Staffing Project managers select the most qualified professionals based on their experience,technical discipline,and past performance. The team is chosen for their expertise in managing various contract types and their familiarity with the project's location and requirements.All project managers have been trained in DOD processes and procedures, Federal Acquisition Regulation(FAR) requirements,and CERCLA processes.The project team will use existing site information,conduct a site visit if necessary to identify uncertainties and data gaps,and define an optimal technical approach to achieve the project's objectives. Subcontractor Management ETC has established strong partnerships with a diverse network of subcontractors across the State,including laboratories,drillers, geophysical firms,surveyors, haulers,and recycling/disposal facilities.These subcontractors are selected for their expertise, reliability,and alignment with our project standards.When needed,they are integrated into the project team.Subcontractor management is delegated to the appropriate level of the team,whether that be a project manager or technical specialist.We hold subcontractors to the highest industry standards,and if performance issues arise related to technical,safety,quality, budget,or schedule compliance,a corrective action plan will be required.The ETC Team will closely monitor and support subcontractors in addressing any deficiencies, but we won't hesitate to remove non-performing subcontractors if necessary to keep the project on track. If required, liquidated damages will be imposed for any subcontracted elements that fail to meet expectations. Project Workflow At ETC,our project workflow is designed to support consistent,high-quality execution across a range of environmental and engineering projects—whether they're straightforward or complex,fast-moving or long-term. From initial planning to closeout, we emphasize flexibility,accountability,and proactive communication to keep things moving efficiently. Planning with Purpose Every successful project starts with a solid plan.We begin with scoping and kickoff meetings that bring together technical leads, project managers,and stakeholders to align on expectations and identify project-specific needs.We build out a detailed Work Breakdown Structure(WBS)to organize tasks into manageable components, laying the groundwork for scheduling, resourcing, and budgeting. Additional Information (cont.) Our planning process addresses logistical and regulatory complexities early—whether it's coordinating with site operations, managing site access and security,anticipating subsurface clearance requirements,or identifying long-lead items.We also evaluate constructability,value engineering opportunities,and any permitting or stakeholder coordination that may impact execution. Work Plans Site-specific work plans serve as both execution guides and compliance tools. Depending on the scope,these may include: • Quality Control Plan (QCP) • Remedial Action Work Plan (including design analysis) • Site Health &Safety Plan(SHSP) • Sampling and Analysis Plan (SAP) • Chemical Quality Control Plan • Transportation &Disposal Plan These documents define how the scope will be carried out,outline the technical requirements,clarify roles,and establish performance standards.They also incorporate DQOs(Data Quality Objectives), permitting needs, material specifications,site control measures,and reporting protocols.All plans are prepared in alignment with state and federal guidelines to ensure regulatory compliance and consistent implementation. Clear and Consistent Communications Communication is integrated into every step of our workflow. Project managers serve as the central point of contact and provides regular status reports summarizing task progress,deliverables,scheduling updates,subcontractor coordination,and expenditures. These updates help identify any emerging issues early—so we can resolve them before they impact the schedule or budget. We maintain open, respectful communication not only with clients but also with regulators,subcontractors,and community stakeholders.When changes arise,we work quickly to assess impacts, propose solutions,and present a clear path forward. Monitoring Tools Our internal Contract Management System(CMS)is the backbone of our project tracking and control process. Interactive access for system users from both office and remote-site locations to provide our Project Managers with the tools and information needed to track and forecast cost and schedule,and effectively administer the contract.They provide information that: • Presents an accurate picture of work in progress through daily cost and schedule tracking • Identifies potential problems by tracking planned production rates versus actual • Succinctly summarizes and presents this information to the client in monthly progress reports. With the flexibility to support projects ranging from a few thousand to several million dollars,our CMS enables ETC to stay responsive,accurate,and accountable—no matter the project size or complexity. Resource Management ETC builds each project team around a core group of key personnel and adjusts staffing levels as needed to match the phase of work.This agile resourcing approach ensures we're always operating at the right scale—never under-resourced or over- committed. Each week,the project manager meets with technical leads to review labor and equipment allocations,identify upcoming needs, and resolve any resource conflicts across concurrent projects.We also apply advanced planning to procurement,identifying "critical path"materials or services early to ensure timely delivery and cost control.When warranted,we self-perform sensitive or undefined scope items to reduce risk. For well-defined tasks,we rely on our network of proven local subcontractors. Additional Information (cont.) Staying Ahead of Delays Avoiding delays is built into every part of our workflow.We identify factors that could impact the schedule—such as difficult site conditions, long-lead equipment,or permitting timelines—and build strategies to address them before they cause delays. Our strong relationships with regulators(e.g., Hawaii DOH, EPA)and knowledge of the permitting process allow us to navigate approvals efficiently and avoid surprises. Because we're locally based,our teams understand the unique challenges of working in Pacific environments—from remote logistics to community engagement.Our strong regional presence,combined with deep experience,gives us the ability to adapt quickly when conditions change,or challenges arise. Scheduling and Performance Tracking At ETC,scheduling isn't just about timelines—it's a tool for aligning teams,anticipating needs,and delivering with precision.We build each project schedule from a detailed Work Breakdown Structure(WBS),integrating scope, resource needs,and cost into a single, unified plan. Our schedules aren't static.We use them to run"what-if"scenarios,evaluate alternatives,and resolve conflicts across multiple concurrent task orders.The result is a living tool that supports decision-making, keeps teams aligned,and ensures project milestones are met on time and within budget. Quality Control Process ETC is committed to delivering high-quality work—safely,consistently,and in full compliance with all applicable standards. Our quality control process is embedded throughout the project lifecycle and is supported by experienced personnel,structured procedures,and proactive oversight. Integrated Health and Safety Oversight Safety is a core part of our quality commitment. ETC has established a Corporate Health and Safety Program that complies with OSHA standards(1920.120,1926.65),USACE EM 385-1-1, UFGS 013529,and other applicable guidance.Our Health and Safety Manager oversees the development of Site Health and Safety Plans(SHSPs), leads pre-field safety reviews,and ensures safety is built into the design,construction,and operation phases of every project.Safety expectations are reinforced during the preparatory,initial,and follow-up phases of quality control.With an excellent safety record and a strong safety culture, ETC prioritizes the well-being of our employees,subcontractors,clients,and communities. Project Quality Control Program ETC's Quality Control (QC) Program is led by a dedicated Quality Control Manager(QCM)who oversees the development and implementation of project-specific QC plans.These plans provide a structured framework for monitoring workmanship, reviewing procedures,validating documentation,and managing subcontractor and supplier performance.The QCM works closely with field personnel to identify and resolve quality issues,initiate corrective actions,and ensure compliance with project requirements— both on and off site.This proactive,continuous approach to quality helps reduce rework, prevent delays,and maintain client confidence. Chemical Quality Control Program For projects involving environmental sampling and analysis, ETC implements a Chemical Data Acquisition Plan(CDAP)to ensure the generation of technically and legally defensible data.This plan outlines how analytical services will be managed—including sample scheduling,collection, handling,and laboratory coordination.A Sampling and Analysis Plan (SAP)is used to guide fieldwork,define Data Quality Objectives(DQOs),and outline procedures for identifying and correcting data quality issues.We also audit laboratories and data validators to ensure compliance with regulatory standards and contractual requirements. Additional Information (cont.) Construction Quality Control For construction-related work, ETC uses a proven three-phase quality control system that is fully integrated with our project management process.This system includes: • Phase I—Preparatory Inspections:Conducted before work begins on any definable feature of work.This includes reviewing contract requirements,verifying field conditions and dimensions,checking material compliance,and confirming that required QC testing and safety provisions are in place. • Phase II—Initial Inspections:Completed once a representative portion of work is installed.These inspections focus on workmanship,control testing,dimensional accuracy,and early identification of issues.This is also the point where quality expectations are reviewed and agreed upon with the team. • Phase Ill—Follow-Up Inspections: Performed daily as work progresses to verify continued compliance. Final inspections are conducted before new work begins,ensuring all deficiencies are addressed.The QCM provides clients with advance notice of inspections and maintains thorough records in the Daily Quality Control Report. Resources ETC has used field analytical equipment/methods to expedite project schedules.A brief description of the equipment and applications are listed below: • Immunoassay Kit- During investigation/remediation operations at a salvage yard in Lihue contaminated with PCB, petroleum hydrocarbons,and lead, ETC utilized an immunoassay kit which enabled us to receive expedited results,thereby minimizing the costs associated with mobilizing and demobilizing;while decreasing lab costs. • Portable Gas Chromatograph (GC) - During investigation/remediation activities at a former dry-cleaning facility in Honolulu contaminated with mineral spirits in the soil, ETC leased a portable GC.The GC enabled ETC to receive expedited results, thereby minimizing the costs associated with mobilizing and demobilizing during remediation efforts. • Passive Soil Gas Survey(PSGS) -To minimize the time and cost associated with drilling operations,as well as to identify potential off-site sources of petroleum contamination, ETC utilized a PSGS,which allowed ETC to obtain a relative screening of the petroleum contamination in the subsurface&provide an indication of the contaminant plume locations. • Phase Contract Microscope(PCM)-As a consultant to DAGS, ETC utilized our PCM to verify that abatement contractors adequately removed asbestos from buildings,such as during the renovation of various teacher cottages in Kona and Hilo. • ISCO Water Quality Samplers—We have experience deploying client-owned ISCO water quality samplers to assess stormwater treatment device efficiencies and evaluate representative stormwater runoff from industrial facilities and municipal separate storm sewer systems. • Various ETC owned and operated field analytical equipment-ETC's field testing instrumentation include:CO2 meter, protimeter to monitor ambient humidity/temperature/moisture content,4-gas meter to monitor hydrogen sulfide/ combustible gas/oxygen/carbon monoxide, particulate meter to calculate worker exposure concentrations,Geiger meter to measure radiation,and photoionization detector. • X-Ray Fluorescence(XRF)Meter-The XRF is utilized to identify lead concentrations in paint.The XRF uses a radioactive source that,when exposed to lead containing building components,emits x-rays with a characteristic frequency or energy. The intensity of the radiation is then measured by the instrument and reported as lead in milligrams per square centimeter. ETC was able to use the XRF to determine lead content in lead containing paint and characterize the lead content in soil at various sites for the Hawaii Public Housing Authority(HPHA). • Proficient in: MS Office Professional,ArcGIS, IBM Maximo,AutoCAD I.AUTHORIZED REPRESENTATIVE The foregoing is a statement of fads 31.SIGNATURE 32.DATE 4..., �- 05/01/2025 33.NAME AND TITLE Kyson Morikuni,Managing Principal 1.SOLICITATION NUMBER(If any) ARCHITECT-ENGINEER QUALIFICATIONS PART II - GENERAL QUALIFICATIONS (If a firm has branch offices,complete for each specific branch office seeking work) 2a. FIRM(or Branch Office)NAME 3.YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER EnviroServices&Training Center, LLC 1994 CFDEJJZSK9LS 2b.STREET 5.OWNERSHIP 505 Ward Avenue,Suite 202 a.TYPE 2c.CITY 2d.STATE 2e.ZIP CODE Limited Liability Company Honolulu Hawaii 96814 b.SMALL BUSINESS STATUS Small Business 6a. POINT OF CONTACT NAME AND TITLE Kyson Morikuni, Managing Principal 7. NAME OF FIRM(If Block 2a is a Branch Office) 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS (808)839-7222 kmorikuni@gotoetc.com 8a. FORMER FIRM NAME(S)(If any) 8b.YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c.Number of Employees a. Profile c.Revenue Index Code b.Discipline Code b.Experience Number (1)FIRM (2)BRANCH 02 Administrative 8 A10 Asbestos Abatement 1 04 Aeronautical Engineer 1 E09 EIS,Assessments or Statements 1 07 Biologist 4 Eli Environmental Planning 1 08 CADD Technician 1 E12 Environmental Remediation 4 11 Chemist 1 E13 Environmental Testing and Analysis 6 12 Civil Engineer 5 G04 Geographic Information System Services 5 15 Construction Inspector 6 H02 HazMat Handling and Storage 1 19 Ecologist 1 H03 Hazardous,Toxic,Radioac.Waste 5 23 Environmental Engineer 2 103 Industrial Waste Treatment 1 24 Environmental Scientist 8 R09 Resource Recovery;Recycling 2 29 GIS Specialist 3 SO4 Sewage Collection,Treatment,&Disposal 1 30 Geologist 2 S13 Storm Water Handling and Facilities 8 34 Hydrologist 1 T02 Testing and Inspection Services 4 36 Industrial Hygienist 4 W02 Water Resources;Hydrology;Groundwater 4 48 Project Manager 5 W03 Water Supply;Treatment and Distribution 5 58 HazMat Technician 4 58 IT Support Analyst 1 Civil/Environmental Engineering 6 Total 57 11.ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 1. Less than$100,000 6. $2 million to less than$5 million 2. $100,000 to less than$250,000 7. $5 million to less than$10 million a.Federal Work 5 3. $250,000 to less than$500,000 8. $10 million to less than$25 million b.Non-Federal Work 8 4. $500,000 to less than$1 million 9. $25 million to less than$50 million c.Total Work 8 5. $1 million to less than$2 million 10. $50 million or greater a.NAME AND TITLE 12. AUTHORIZED REPRESENTATIVE Kyson Morikuni,Managing Principal The foregoing is a statement of facts. a.SIGNATURE b.DATE 05/01/2025