My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-25 PL-INT-2025-010828 Sea Engineering, Inc. - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-25 PL-INT-2025-010828 Sea Engineering, Inc. - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:27:18 AM
Creation date
6/26/2025 8:18:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the g <br /> agency,or 10 projects,if not specified. Complete one Section F for each project.) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Anaehoomalu Bay Tsunami Damage Repair PROFESSIONAL CONSTRUCTION <br /> SERVICES <br /> Anaehoomalu,Waikoloa, South Kohala,Hawaii 2016 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> Waikoloa Beach Association Eleanor Mirikitani 808-886-1000 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> ) <br /> Scope: On March 11, 2011, a <br /> tsunami generated by a massive <br /> earthquake in Japan struck the Q <br /> Hawaiian Islands and caused <br /> significant damage along portions of • <br /> the State's shoreline. Waikoloa ' .'itio s <br /> Beach on the island of Hawaii was <br /> directly impacted, with inundation <br /> reaching the backshore historical <br /> fishpond, subsequently destroying <br /> the pond wall and creating a 200- <br /> foot-wide breach through the beach <br /> fronting the pond. ✓��` <br /> Sea Engineering,Inc.was contracted <br /> to obtain permits and do emergency The tsunami breach at VF:aikolon Beach,as photographed 03/17/2011' <br /> repair work to close the breach, and <br /> this work was completed in July of <br /> 2011. A sand-filled geotextile tube <br /> barrier was installed to close the gap <br /> in the beach. The emergency repair * <br /> work was accomplished as an <br /> intermediate step to protect the <br /> fishpond while a long-term, <br /> • <br /> permanent repair/restoration plan for <br /> the pond and beach can be <br /> developed. Permanent repairs would <br /> include rebuilding the fishpond wall <br /> ._ . <br /> and restoration of the beach to its - <br /> pre-tsunami condition. ,ru <br /> Cost: $235,000 <br /> March 14,2012 Shoreline <br /> (1)FIRM NAME (2)FIRM LOCATION(City and (3)ROLE <br /> State) <br /> Sea Engineering,Inc. Waimanalo, Oahu, Coastal/Ocean Engineering <br /> Hawaii <br />
The URL can be used to link to this page
Your browser does not support the video tag.