Loading...
HomeMy WebLinkAbout2025-06-25 PL-INT-2025-010828 Sea Engineering, Inc. - Category PL.5 DeVera, Ashley From: Brandie Markos <bmarkos@seaengineering.com> Sent: Wednesday, June 25, 2025 9:18 AM To: Planning Internet Mail Subject: Sea Engineering Submittal for Professional Services FY 25/26 Attachments: Sea Engineering Professional Services 2025-2026.pdf; ltr of interest Planning Dept 2025-2026.pdf; DS Hawaii PE License (exp 04-30-2026).pdf; Goody PE License exp 04-30-2026.pdf Aloha, Please find attached our submittal for professional services for the upcoming fiscal year. I have also included our cover letter and copies of the PE licenses for two our engineers. If you should have any questions, please feel free to contact me. 6ra4".44.e. Mark.oy Office Manager/Executive Administrative Assistant A: 504 North Nimitz Hwy, Honolulu, HI 96817 Sea Engineering, Inc. I http://www.seaengineering.com 0: 808.536.3603 I D: 808.460.3430 I M: 808.372.6545 I E:bmarkos@seaengineering.com 1 .E .Sea Engineering, Inc. 504 N.Nimitz Highway,Honolulu, HI 96817 • Phone: (808) 536-3603 • Website:www.seaengineering.com June 25, 2025 Mr. Jeffrey Darow, Planning Director Planning Department, County of Hawai'i 101 Pauahi Street, Suite 3 Hilo, Hawaii 96720 Subject: Professional Services, Fiscal Year 2025-2026 Dear Mr. Darrow: This is in response to your solicitation for professional services dated June 1, 2025. We would be pleased to provide professional engineering services to the County of Hawaii, Planning Department during Fiscal Year 2025-2026 (July 1, 2025 to June 30, 2026). Sea Engineering, Inc. (SE) specializes in coastal engineering, marine and coastal environmental assessments, hydrographic and geophysical surveys, underwater inspection, marine construction, and boat and diving services. • We are specifically interested in providing services to your department in the following areas: PL.4. Community Planning—(Community/Regional Plans, General Plan, Climate Adaptation) -Coastal/Marine climate issues such as Sea Level Rise Vulnerability(SLR) PL.5. Community Planning—(Environmental Planning,Environmental Assessments, Environmental Impact Statements)—Coastal/Marine A Federal Standard Form SF330 is enclosed presenting our experience and qualifications along with a copy of the State of Hawaii, Professional License card for each licensed person referenced in our submittal. In addition, our qualifications are also available at our website: www.seaengineeering.com. We look forward to possibly assisting the County of Hawaii, Planning Department during the coming fiscal year. Should you desire any additional information please contact me at 808-536-3603 or by email at cconger@seaengineering.com. Very truly yours, C---- Chris Conger Vice President ARCHITECT— ENGINEER QUALIFICATIONS PART I—CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION(City and State) County of Hawaii Notice to Providers of Professional Services 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER June 1,2025 Fiscal Year 2025-2026 (July 1,2025 to June 30,2026) B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Chris Conger,Vice President 1 5. NAME OF FIRM 71 F Sea Engineering,Inc. LJ 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS (808) 536-3603 cconger@seaengineering.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) `o a) r 12. FIRM NAME 13. ADDRESS 14. ROLE IN THIS E m E CONTRACT a a > 2 0) a. Sea Engineering,Inc. Coastal and Ocean Sea Engineering, Inc. 504 N.Nimitz Hwy Engineering,Marine Honolulu,HI 96817 Construction,Boat and Diving Services b. ❑CHECK IF BRANCH OFFICE c. ❑CHECK IF BRANCH OFFICE d. ❑CHECK IF BRANCH OFFICE e. ❑CHECK IF BRANCH OFFICE f. ❑CHECK IF BRANCH OFFICE 9 ❑CHECK IF BRANCH OFFICE h. ❑CHECK IF BRANCH OFFICE ❑CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑ (Attached) STANDARD FORM 330(6/2004) E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH THIS FIRM David A.Smith,Ph.D.,P.E. Senior Coastal Engineer 27 18 15. FIRM NAME and LOCATION(City and State) Sea Engineering,Inc. 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) Ph.D.,University of Hawaii-Manoa,Ocean Engineering Hawaii Professional Engineer M.S.,University of Hawaii-Manoa,Ocean Engineering Guam Professional Engineer B.S.,University of Hawaii-Manoa,Mathematics California Professional Engineer 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.) Member—ASCE PADI Open Water Diver Certification,Nitrox Certification 19. RELEVANT PROJECTS (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Kamehameha Highway Shoreline Erosion Mitigation Professional Services Construction Kaaawa,Oahu 2020 to present (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of temporary erosion protection for Kamehameha Highway at Kaaawa, Oahu. Work tasks include preparation of a basis of design report, an environmental assessment, construction drawings for selected plan, the Department of the Army permit application,as well as community outreach. Cost: $364,710 Role:Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Windward Highway Shore Protection Windward Oahu 2021 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm b. Sea Engineering, Inc., has been contracted by AECOM for HDOT Highways Division to prepare a Draft and Final Basis (BOD) report in support of the Windward Oahu Highway erosion mitigation project. Additional work tasks include consultations with Federal, State, City & County agencies, neighborhood boards, and citizen groups; prepare technical sections for a DEA;prepare construction plans and the necessary permit applications for construction. Cost: $721,231 Role:Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Hilo Harbor Breakwater Improvements—Basis of Design Professional Services Construction Hilo,Hawaii 2024 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Recent inspections of the Hilo breakwater have found areas of possible damage. As a result of the inspections,repairs have c. been recommended.In support of the need for repairs,Sea Engineering,Inc.(SE)had been contracted by Cardno GS and the U.S. Corps of Engineers(USCOE)to conduct high resolution numerical modeling of wave conditions on the breakwater at selected future sea levels to determine stability and vulnerability of the breakwater.SE then developed several repair designs to address the existing and future vulnerabilities. Cost: $381,189 Role:Project Manager/Senior Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Laupahoehoe Harbor Repair Design Professional Services Construction Laupahoehoe,Hawaii 2023 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm In 2019,USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE)to evaluate the d. condition of the existing breakwater,develop and compare alternative repair plans,and develop conceptual repair plans and rough order of magnitude construction costs under the U.S.Army Corps of Engineers(USACE)Operations&Maintenance (O&M)program.In 2020,USACE retained the services of Cardno GS,Inc.,and SE to develop the repair plan through final design. Cost:$141,640 Role:Project Manager/Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Waikoloa Beach Management Plan Professional Services Construction Waikoloa,Hawaii 2021 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded. To ensure the continued stability of e.. their beach, and address concerns about sea level rise,the Waikoloa Land Company and Waikoloa Beach Association had contracted Sea Engineering to develop a long-term plan for management and maintenance. Work included beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and construction documents. Cost: $36,760 Role:Coastal Engineer E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Christopher Goody,P.E. Senior Ocean Engineer a. TOTAL b. WITH FIRM 28 17 15. FIRM NAME and LOCATION(City and State) Sea Engineering,Inc. 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) MS,Ocean Engineering,University of Hawaii at Manoa Hawaii Professional Engineer(Civil) BS,Ocean Engineering,Florida Institute of Technology 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.) American Society of Civil Engineers,Marine Technology Society SCUBA certified 19. RELEVANT PROJECTS (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Kamehameha Hwy Shoreline Erosion Mitigation Professional Services Construction Kaaawa,Oahu 2020 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of temporary erosion protection for Kamehameha Highway at Kaaawa,Oahu.Work tasks include preparation of a basis of design report,an environmental assessment,construction drawings for selected plan,the Department of the Army permit application, as well as community outreach. Cost: $364,710 Role: Senior Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Hilo Harbor Breakwater Improvements—Basis of Design Hilo,Hawaii 2024 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Recent inspections of the Hilo breakwater have found areas of possible damage. As a result of the inspections,repairs have b. been recommended.In support of the need for repairs,Sea Engineering,Inc.(SE)had been contracted by Cardno GS and the U.S. Corps of Engineers (USCOE)to conduct high resolution numerical modeling of wave conditions on the breakwater at selected future sea levels to determine stability and vulnerability of the breakwater. SE then developed several repair designs to address the existing and future vulnerabilities. Cost: $381,189 Role: Senior Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Hilo Wastewater Treatment Plant Outfall Inspection Professional Services Construction Hilo,Hawaii 2023 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering,Inc(SE),has been contracted by the County of Hawaii Wastewater Division to inspect the Hilo Wastewater c. Treatment Plant(WWTP)Ocean Outfall as part of the requirement in the facility's National Pollutant Discharge Elimination System permit (NPDES Permit No. HI 00213 77). Work tasks include a visual and dye inspection, and a color video documenting the inspection,a written report summarizing the results of the inspection noting all identified defects and their location. Cost: $25,995 Role: Senior Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Laupahoehoe Harbor Repair Design Professional Services Construction Laupahoehoe,Hawaii 2023 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE) to evaluate the d• condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and rough order of magnitude construction costs under the U.S. Army Corps of Engineers(USACE) Operations& Maintenance (O&M)program. In 2020,USACE retained the services of Cardno GS, Inc.,and SE to develop the repair plan through final design. Cost:$141,640 Role: Senior Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Laniakea Highway Relocation Coastal Assessment Professional Services Construction Haleiwa,Oahu 2022 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm The Hawaii Department of Transportation was interested in moving Kamehameha Highway inland at Laniakea on the North e. Shore of Oahu to alleviate hazardous traffic and pedestrian crossing. In support of planning and preparation of an environmental assessment (EA) for the proposed project, Sea Engineering, Inc (SE) was contracted by WSP for HDOT Highways division to complete a tsunami and wave runup and inundation analyses, and a coastal assessment of the project site. Cost: $60,460 Role: Senior Ocean Engineer E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH THIS FIRM Christopher L.Conger,Vice President Project Manager/Coastal Scientist 20 14 15. FIRM NAME and LOCATION(City and State) Sea Engineering,Inc. 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) M.Sc.,University of Hawaii-Manoa,Coastal Geology B.S.,University of Hawaii-Manoa,Geology and Geophysics 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.) 100 ton near shore Captains License,Navy Second Class Diver Certification,Commercial Diver Certification(ADC Supervisor) 19. RELEVANT PROJECTS (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater Professional Services Construction Inspection and Permitting 2015 to Present n/a Hawaii Island,Kauai,&Oahu (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm a. The State Department of Transportation has assessed 27 bridges across the State for possible scour repairs. Sea Engineering completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu. SE is also responsible for requiring permits for the repair work. Cost: $319,655 Role:Project Manger (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Route 50 Kauai Sea Level Rise Feasibility Study Professional Services Construction Kauai,Hawaii 2023 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm Sea Engineering, Inc has been contracted by Bowers and Kubota and the State of Hawaii, Department of Transportation to b. evaluate coastal hazards, sea level rise vulnerability, and wave flooding for different resiliency alternatives in the Route 50 project area. Work tasks include field investigations, review of existing available information, overview of sea level rise projections,high-resolution sea-level rise and wave inundation modeling for future sea level rise scenarios,evaluation of coastal mitigation and resiliency alternatives,and a detailed report presenting the results. Cost: $71,700 Role:Project Manger (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Sea Level Rise Wave Inundation Study,Honoapiilani Highway Realignment Professional Services Construction Olowalu and Ukumehame,Maui,Hawaii 2023 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm Sea Engineering,Inc.(SE)has been contracted by WSP and the State of Hawaii,Department of transportation to conduct a sea c. level rise (sir) and wave inundation study for proposed roadway alignment alternatives along Honoapiilani Highway at Ukumehame and Olowalu,Maui.Project tasks included a comprehensive summary of the current slr projections,review of the Hawaii sea level rise exposure area,numerical modeling of wave induced flooding for a future sea level of 0.98 m(3.2 ft)for existing topography and each of the four(4)highway realignment alternatives,and summary of project area FEMA flood hazard zones. Cost: $58,350 Role:Project Manager (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Kaumalapau Harbor Hydrographic Survey Professional Services Construction Lanai,Hawaii 2024 n/a d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering,Inc(SE)was contracted by HDR and the Hawaii Department of Transportation to conduct a multibeam hydrographic survey of Kaumalapau Harbor to include navigable waters between Kaumalapau Wharf and the outer channel markers.Deliverables included an xyz data file,CAD chart of sounding and contours and a survey report. Cost: $42,7255 Role:Project Manager (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Mauna Kea Shoreline Restoration Project Professional Services Construction Kohala Coast,Hawaii 2018 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm e. The Mauna Kea Resort on Hawaii Island planned improvements to their shoreline and hotel. Sea Engineering had been contracted by Hookuleana LLC, Prince Resorts Hawaii to conduct detailed oceanographic and shoreline investigations to support implementation of these improvements. Cost: $81,800 Role:Project Manager E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH FIRM Marc Ericksen,Senior Executive Officer Project Manager 34 34 15. FIRM NAME and LOCATION(City and State) Sea Engineering,Inc. 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) M.S.Coastal Geology B.S.Earth Sciences 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.) Member—ASCE,MTS,ACECH,SAME,WEDA,WEF,ASBPA Certified Hydrographer—National Society of Professional Surveyors/Hydrographic Society of America 19. RELEVANT PROJECTS (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED HIC-2 Interisland Cable Route Bathymetry and Biological Surveys Oahu,Molokai,Maui,and Hawaii Island 2024 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm a. Hawaiian Telcom is proposing to establish the Hawaii Interconnector Cable 2 (HIC-2) submarine fiber optic cable system connecting Kauai,Oahu,Molokai,Maui and Hawaii. In support of the planning,design and environmental permitting for the proposed cable system,Sea Engineering,Inc.(SE)has been contracted by RM Towill and Hawaiian Telcom to conduct towed camera,bathymetry,and marine biological surveys of the proposed cable landing sites. Cost: $$1,320,620.00 Role:Project Manager (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Kalihiwai Stream Hydrographic Survey Professional Services Construction Kauai,Hawaii 2024 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm b. Sea Engineering,Inc.(SE)has been contracted by Park Engineering and the State of Hawaii Department of Transportation to provide a multibeam hydrographic survey of the Kalihiwai Stream in support of scour repairs at Kalihiwai River Bridge.The survey extends from the stream mouth to the plunge pool upstream of Kalihiwai Bridge,roughly 4500 feet.Survey deliverables include an xyz file of the data,contour,and color-coded charts of stream depths. Cost: $66,400 Role:Project Manger (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Laupahoehoe Biological Surveys and Environmental Support Professional Services Construction Laupahoehoe,Hawaii 2022 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm c. Sea Engineering,Inc.,was contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine environment within and adjacent to the Laupahoehoe Harbor breakwater.Work tasks include generating habitat maps,conduct quantitative surveys, develop a report presenting key findings and providing qualitative information that characterizes presence/absence and abundance of fish,macroalgae,and non-coral macroinvertebrates species. Cost: $38,036 Role:Project Manager (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Mokapu Ocean Outfall NPDES Oceanographic Measurements Kaneohe,Hawaii 2020 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm In support of the City and County of Honolulu's NPDES permit requirements to conduct oceanographic measurements for the d. Kailua Regional Wastewater Treatment Plant Mokapu ocean outfall, Sea Engineering, Inc. (SEI) was responsible for deployment of 2 acoustic Doppler current profilers for a 1-year period, collection of water samples, CTD profiles, diver reconnaissance of proposed buoy anchor locations,fabrication of buoy sensor mounting platforms,and deployment/inspection of two scientific monitoring buoys in the outfall vicinity. Cost: $200,000 Role:Project Manager (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Flilo WWTP Outfall Inspection Hilo,Hawaii 2018 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm e. Sea Engineering,Inc.(SE)was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of the Hilo Wastewater Treatment Plant(WWTP) outfall. SE performed inspections on the outfall in 1987, 1990, 2001, 2005, 2011,and 2012 and again in September of 2018. The inspection was conducted by a five-man dive team using SCUBA and covered the submerged length of the outfall. Cost: $22,400 Role:Project Manager E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH THIS FIRM Ian Hardy Ocean Engineer 8 8 15.FIRM NAME and LOCATION(City and State) Sea Engineering,Inc. 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) M.S.University of Hawaii-Manoa,Ocean and Resources Engineering B.A.Sc.,University of British Columbia,Civil Engineering Dip.Tech.,Camosun College,Civil Engineering Technology 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) AAUS Scientific Diver Boater Safety Course 19. RELEVANT PROJECTS (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Kamehameha Highway Shoreline Erosion Mitigation Professional Services Construction Kaaawa,Oahu 2020 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of temporary erosion protection for Kamehameha Highway at Kaaawa,Oahu.Work tasks include preparation of a basis of design report,an environmental assessment,construction drawings for selected plan,the Department of the Army permit application, as well as community outreach. Cost: $3640,710 Role:Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Route 50 Kauai Sea Level Rise Feasibility Study Professional Services Construction Kauai,Hawaii 2023 to Present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering, Inc. (SE)has been contracted by Bowers Kubota and the State of Hawaii Department of Transportation to b. evaluate coastal hazards, sea level rise vulnerability, and wave flooding for different resiliency alternatives in the Route 50 project area. Work tasks include field investigations, reviewing existing available information, overview of sea level rise projections,high-resolution sea-level rise and wave inundation modeling for future sea level rise scenarios,evaluation of coastal mitigation and resiliency alternatives,and a detailed report presenting the results. Cost: $71,700 Role:Project Manager/Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Sea Level Rise Wave Inundation Study,Honoapiilani Highway Realignment Professional Services Construction Honoapiilani Highway—Olowalu and Ukumehame,Maui,Hawaii 2023 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering,Inc.(SE)has been contracted by WSP and by the State of Hawaii Department of Transportation to conduct a c. sea level rise (sir) and wave inundation study for proposed roadway alignment alternatives along Honoapiilani Highway at Ukumehame and Olowalu, Maui. Project tasks include a comprehensive summary of the current SLR projections,review of the Hawaii sea level rise exposure area(SLR-XA),numerical modeling of wave induced flooding for future sea level of 0.98 m (3.2 ft)for existing topography and a summary of project area FEMA flood hazard zones. Cost: $58,350 Role;Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Sea level Rise Inundation and ASCE Tsunami Analyses-Kalaeloa Facility Professional Services Construction Kalaeloa,Hawaii 2023 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering has been contracted by PERC Water Corporation to conduct a sea level rise (SLR)flooding hazard analyses d. and ASCE tsunami flow analyses for the proposed Kalaeloa Seawater Desalination Facility. The proposed scope of work includes assessment of natural hazards associated with 100-year wave/storm events and tsunamis while incorporating sea level rise. In addition, tsunami flow depths and velocities were determined for the project site at proposed structure locations per ASCE7-16 design guidelines in support of structural design for tsunami loads. Cost:$109,922 Role:Ocean Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Magic Island Lagoon Retaining Wall and Walkway Improvements Professional Services Construction Honolulu,Hawaii 2025 n/a e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering, Inc. (SE) was contracted by the City and County of Honolulu to provide project management, permitting, plans,specifications,and contract documents for design of repairs of the CRM seawall and replacement of the walkway. Cost: $405,000 Role:Ocean Engineer E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Morgan Stephenson Coastal Engineer a. TOTAL b. WTH 14 14 14SFIRM 15. FIRM NAME and LOCATION(City and State) Sea Engineering,Inc. 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) M.S.Coastal Engineering M.S.Civil Engineering B.S.Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.) Member—ASCE 19. RELEVANT PROJECTS (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Piilani Highway,Kalepa Revetment and Seawall Repair Professional Services Construction Kalepa,Maui 2016 to present n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Sea Engineering,Inc.,was contracted by the County of Maui,Department of Public Works to provide the design and permitting a. of shore and road protection along an approximate 450-ft reach of the Piilani Highway at the Kalepa headland.Work included: Topographic survey,planning and permitting,project permits,and project design.Design elements include the shore protection revetment, shore protection seawall/retaining wall, roadway improvements (asphalt paving and guardrail installation), and additional bank stabilization and possible shore protection. Cost: $881,688 Role:Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Laupahoehoe Harbor Repair Design Professional Services Construction Laupahoehoe,Hawaii 2023 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE) to evaluate the b• condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE) Operations & Maintenance (O&M)program. In 2020,USACE retained the services of Cardno GS, Inc., and SE to develop the repair plan through final design. Cost:$141,640 Role:Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction Puna,Hawaii 2020 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm c. Sea Engineering was contracted by the Dept Intent of Land&Natural Resources—DOBOR to provide coastal engineering and environmental permitting services to determine the scope of work,environmental permitting requirements,and cost estimates to repair and improve the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island. Cost: $42,960 Role: Coastal Engineer (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Kalaeloa Harbor Channel&Basin Hydrographic Survey Professional Services Construction Kalaeloa Harbor,Oahu 2019 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm d. Sea Engineering, Inc (SE)was contracted by Control Point Surveying for HDOT Harbors Division to provide a Multibeam hydrographic Survey of the channel and basin areas of Kalaeloa Barbers Point Harbor.Project deliverables included an xyz file of the bathymetry data and a color-coded DEM. Cost: $20,300 Role:Coastal Engineer/Hydrographic Surveyor (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED Lahaina Small Boat Harbor Maintenance Dredging Design Services Professional Services Construction Lahaina,Maui 2018 n/a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm Lahaina Small Boat Harbor consisted of 16 berths, 83 moorings, loading docks, a fuel facility, and restrooms. The harbor e. experienced extensive damage during the August 8,2023,wildfires. Most of the harbor infrastructure and vessels were either destroyed in the fire or damaged beyond repair. Sea Engineering, Inc (SE)was contracted by Department of Land&Natural Resources — DOBOR to provide a harbor and channel post fire investigation. Work tasks include design and dredging multibeam surveys;preparation of dredge plans,specifications and bidding documents;pre and post dredge biological surveys; and obtaining all required permitting. Cost: $300,442 Role:Coastal Engineer/Hydrographic Surveyor F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 1 agency,or 10 projects,if not specified. Complete one Section F for each project) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Hilo Harbor Breakwater Improvements—Basis of Design PROFESSIONAL SERVICES CONSTRUCTION Hilo,Hawaii 2024 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL U.S. Army Corps of Ben Berridge—Cardno GS 808-476-0067 Engineers 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) The Hilo Harbor breakwater is an approximately two-mile-long rubble mound rock structure that protects inner Hilo Bay's port facilities from direct wave exposure. �. �� Recent inspections of the Hilo breakwater have found areas of possible damage, mostly limited to - local areas along the structure. • Multiple visual inspections of the breakwater were conducted as part of the annual Project Condition Surveys (PCS), which were performed by a mix of USACE and Sea Engineering, Inc. (SE) inspection teams in 2015, 2016, 2017, 2018, 2020, and 2021. Observed irregularities were found to include displaced armor units, attrition of supportive core stone (hollowing out of core),structure slumping,and excessive settling. As a result of the inspections,repairs have been recommended in numerous locations 15610°W 15508°W 15506.W 100.111 W identified along the breakwater and vary in E I size from very localized to hundreds of feet in length. ' In support of the need for repairs to the -•,Y: f0• breakwater, SE was contracted by Cardno GS and the U.S. Army corps of Engineers to develop, analyze, organize and summarize all necessary design ' conditions, that will constitute an updated Basis of Design(BoD). � y •t 4�s $ 5iY'i7i ry n 15505°W 15504.W This project won the 2023 ASCE OCEA Award for Best Studies and Research Project—Future Stability and Adaptation Under Sea Lever Rise at Hilo Breakwater. Cost: $381,189 • (1)FIRM NAME (2)FIRM LOCATION (3)ROLE (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 2 agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Laupahoehoe Harbor Breakwater Repair Basis of Design PROFESSIONAL SERVICES CONSTRUCTION Laupahoehoe,Hawaii 2023 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL U.S. Army Corps of Cardno GS,Inc.—Ben Berridge 808-476-0067 Engineers 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Laupahoehoe Harbor is located on the Hamakua Coast on the northeast side of the Island of Hawaii, approximately 25 miles north- ,, northwest of Hilo. The facility includes a boat launch ramp and protective, 200-foot-long - — s IMP " �`°- - breakwater that was built in 1988. The usability — ." of the boat ramp has decreased since the facility n " was built and the breakwater has lost - '',Y y" fir. effectiveness in reducing wave energy at the sue' "y= .i boat ramp, decreasing functionality of the harbor. ,-' ` In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea �a ` a eln+bnV Engineering,Inc. (SE)to evaluate the condition . 'f' of the existing breakwater,develop and compare r` � alternative repair plans, and develop conceptual ,.,_. �,� '� i: �. repair plans and rough order of magnitude . '' �' , ,,. construction costs under the U.S. Army Corps �fr �` of Engineers (USACE) Operations & 'r 4, " :. °� Maintenance (O&M)program. In 2020,USACE retained the services of Cardno a , " o"1,-'--- `4 F `'` GS, Inc., and SE to develop the repair plan � ,"i-c,„ through final design. '4 L'`s 1 5;Z5- 'S, , ti.t � , GPA.P-IC G;,LE: as A q Cost: $141,640 fi FW.fl as RFi Arnr LO NIA' •'J'' i� Sex . ,a. " (1)FIRM NAME (2)FIRM LOCATION (3)ROLE E (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 3 agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Hawaii DOT Scour Critical Bridge Project—Bathymetry PROFESSIONAL CONSTRUCTION SERVICES and Underwater Inspection Hawaii Island,Kauai, Oahu,HI 2015 to present n/a 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL State of Hawaii,DOT Kai Hawaii—Mike Hunneman 808-533-2210 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) ' ' ' :r,.t ,4 The State Department of �' ' z "' ,. Transportation is assessing up to 27 , ' �yt, bridges across the State for possible w k �0 ' scour repairs. In support of this E 13, ��f'` , �� h M � a"` 41 effort, Sea Engineering completed Iiiii:1,1 -:;.' ,-,i,...:.,':11...-1 bathymetry surveys and underwater ' � , � a1„, ; inspections of 5 bridges, including — _ w,, ii _ _,, ro„�.r Kolekole Bridge and Paheehee Bridge on Hawaii Island, Wailua River Bridge and Wailua River Plantation Bridge on Kauai, and the Waimea River Bridge on Oahu. The underwater inspections were conducted by a three-man dive team using surface supplied air. Sea Engineering was also responsible for obtaining all required permits for the proposed repair activities. g.. - ' / , ' ,_--: --';7,-,:'-,;i: - INATilliiiitillrY V •Ct-r7ill* ' $ ' -.( , S x _ .� -..\ P� Cost: 319,655 (1)FIRM NAME (2)FIRM LOCATION(City and (3)ROLE State Sea Engineering,Inc. Waimanalo, Oahu, Coastal/Ocean Engineering` Hawaii F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 4 agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Pohoiki Boat Ramp Repair Relocation Study PROFESSIONAL SERVICES CONSTRUCTION Puna District, Island of Hawaii 2019 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL State of Hawaii,DLNR Edward Underwood(DOBOR) 808-587-1966 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Hawaii Island's Kilauea Volcano 41, lower East Rift Zone began erupting on May 3, 2018, ultimately transforming , + ' N the landscape of the Lower Puna GRAPHIC SCALE district on the southeast coast of the island. When the eruption stopped in POHOIKI BOAT RAMP • August 2018 lava had covered more ;,;r; than 13 square miles of residential, 'fra • farm, industrial and natural lands, and '�'''�+ t' ra created some 875 acres of new land • extending into the ocean. At Pohoiki �' • ;.� s •C ' it° y, I Bay, site of the State DLNR-Division � sy- ti i{ ��i 4� of Boating and Ocean Recreation (DOBOR) Pohoiki Boat Ramp facility, large volumes of volcanic debris (rocks, cobbles and sand) began to fill in the bay and the vicinity of the boat ramp. By the spring of 2019 the bay was filled, and the boat ramp was land locked by a 200-foot-wide black sand and cobble beach. Sea Engineering was contracted by the 'IWO Department of Land and Natural Resources, Division of Boating and Ocean Recreation, to prepare a concept screening study for re-opening the existing ramp facility or relocating it to an A - alternate site. The work involved coastal - " 47 engineering to develop concepts for evaluation, - and development of a rough-order-of-magnitude (ROM) construction cost estimate for the two concepts. Planning, design and permitting costs were also estimated. Cost: $43,960 (1)FIRM NAME (2)FIRM LOCATION (3)ROLE (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 5 agency,or 10 projects,if not specified Complete one Section F for each project) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Waikoloa Beach Management Plan PROFESSIONAL SERVICES CONSTRUCTION Waikoloa,Hawaii 2017 to present 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL Waikoloa Beach Association Scott Head 808-886-1000 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Waikoloa Beach Resort is located on the west coast of 1 the island of Hawaii, and the southern portion encompasses the shoreline of Anaehoomalu Bay. During a tsunami in March 2011 the beach was severely P 44.70 eroded,a 200-foot-wide breach was created through the beach into the fishpond depositing sand in the pond,and a a much of the fishpond rock wall which acted as a backstop for the beach was destroyed. Following completion of repairs, the beach has been relatively stable,and the additional beach crest height has reduced wave overtopping. . 4 To ensure the continued stability of their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long- term plan for management and maintenance of their valuable beach resource. Work includes Beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach maintenance/management plan,environmental assessment and permit application, and detailed design and construction documents. • ti PACIFIC OCEAN Cost: $12,560 (1)FIRM NAME (2)FIRM LOCATION (3)ROLE (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 6 agency,or 10 projects,if not specified Complete one Section F for each project) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Mauna Kea Shoreline Restoration Project PROFESSIONAL SERVICES CONSTRUCTION Kohala Coast,Hawaii 2018 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL Hookuleana LLC— Prince Resorts Hawaii Peter Young 808-226-3567 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) The Mauna Kea Resort on Hawaii Island is planning improvements to their shoreline and hotel. Sea Engineering has been contracted to conduct detailed oceanographic and shoreline investigations to support implementation of these improvements. Work tasks included: VAN 1. Wave analyses including deepwater wave �� climate, extreme deepwater wave height, 5\ numerical wave modeling of wave ° transformation to shallow water, wave runup, 44 analysis of a particular extreme wave event that resulted in backshore flooding, and sea I level rise impacts. 'ter I' 2. Site investigations including beach profile " measurements, beach topographic survey, 1 sand sampling and analysis, and assessment of coastal processes. 3. Development of a dune restoration plan based on regional,typical dune morphologies. Sea level impacts were considered, and a design report prepared. JN Graphic Scale ._.. � 75 0 75 15n :v ,.. •:,a m," "`w".j!`c . ":k""' , .m"r'' � 4}:°«rae °wiz-«.., k Cost: $81,855 (1)FIRM NAME (2)FIRM LOCATION (3)ROLE (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 7 agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Project Conditions Survey Inspections of Federal Coastal PROFESSIONAL SERVICES CONSTRUCTION Navigation Structures 2015,2016,& n/a Hilo, Kawaihae,Laupahoehoe,Pohoiki 2017 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL USACE Mike Hunneman—KAI Hawaii 808-533-2210 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Sea Engineering was contracted to perform inspections of 24 federal coastal navigation structures (CNS)throughout Hawaii, Guam, Rota, and American Samoa operated and maintained by rt f = the U.S. Army Corps of Engineers (USACE), , ?4V.:" Pacific Ocean Division (POD), Honolulu District b YY • (POH). The purposes of the inspections were to � verify the current condition of the structures,locate .; � - areas of concern on each structure, and identify and ,,, recommend future maintenance requirements. tr,f . Specific work tasks included: • " Kawaihae Small Boat Harbor 1) Categorizing each CNS into distinct reaches according to type of construction (rubble- mound, concrete armor, sheet pile, etc.); unique structural feature (head, trunk, root, etc.); and cross-sectional features (crest elevation, side slopes, toe protection, etc.). 2) Conducting inspections by physically walking the length of each CNS and inspecting areas including the crest, slopes, and toe of the structure. Damage was located with accurate GPS, described and photographed. 3) Preparing draft and final post-inspection {. " reports that summarize the findings documented during the site inspection. 4) Preparing a plan-view map including the aerial imagery of the project site, stationing, : structure components, CEPD benchmark, and the GPS location of each finding recorded during the site inspection. Cost: $131,994 (1)FIRM NAME (2)FIRM LOCATION (3)ROLE (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the g agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Anaehoomalu Bay Tsunami Damage Repair PROFESSIONAL CONSTRUCTION SERVICES Anaehoomalu,Waikoloa, South Kohala,Hawaii 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL Waikoloa Beach Association Eleanor Mirikitani 808-886-1000 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) ) Scope: On March 11, 2011, a tsunami generated by a massive earthquake in Japan struck the Q Hawaiian Islands and caused significant damage along portions of • the State's shoreline. Waikoloa ' .'itio s Beach on the island of Hawaii was directly impacted, with inundation reaching the backshore historical fishpond, subsequently destroying the pond wall and creating a 200- foot-wide breach through the beach fronting the pond. ✓��` Sea Engineering,Inc.was contracted to obtain permits and do emergency The tsunami breach at VF:aikolon Beach,as photographed 03/17/2011' repair work to close the breach, and this work was completed in July of 2011. A sand-filled geotextile tube barrier was installed to close the gap in the beach. The emergency repair * work was accomplished as an intermediate step to protect the fishpond while a long-term, • permanent repair/restoration plan for the pond and beach can be developed. Permanent repairs would include rebuilding the fishpond wall ._ . and restoration of the beach to its - pre-tsunami condition. ,ru Cost: $235,000 March 14,2012 Shoreline (1)FIRM NAME (2)FIRM LOCATION(City and (3)ROLE State) Sea Engineering,Inc. Waimanalo, Oahu, Coastal/Ocean Engineering Hawaii F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 9 projects,if not specified Complete one Section F for each project) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Keauhou Bay Offshore Mooring Design PROFESSIONAL CONSTRUCTION SERVICES Keauhou Bay,North Kona,Island of Hawaii 2013 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL State of Hawaii—DLNR Eric Yuasa 808-327-9585 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Scope: Sea Engineering Inc., was - contracted by the State of Hawaii Division of Boating and Ocean Recreation (DOBOR), DLNR to redesign the mooring p�= layout and mooring assembly design for Keauhou Bay, Hawaii. The purpose is to 'B3 more effectively accommodate vessels and improve mooring assembly design and vessel and user safety. o goo Sao The work included the following: • Detailed site investigation to map existing moorings and bottom �eLOLrc � composition • Design of a gravity mooring _ anchor system suitable for the \\ variable,rocky,rubbly substrate in '\ of the bay . • Design of a mooring layout that maximizes vessel capacity in a safe manner •Acquisition of a Department of the Army permit for the mooring buoys In total, the proposed moorings will accommodate 14 vessels ranging from 30 to 60 feet in length.Mooring locations have been selected to avoid areas with high benthic marine life as far as practicable. The mooring plan calls for six 30ft vessels,three 40ft vessels,three 50ft vessels, and two 60ft vessels. Cost: $50,700 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE .fgro, Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the IO agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Hilo WWTP Outfall Inspection PROFESSIONAL SERVICES CONSTRUCTION Hilo, Hawaii 2024,2018,2012, 2011 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL County of Hawaii Wastewater Curtis Bailey 808-961-8338 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Sea Engineering, Inc. (SE) was contracted by the Hawaii County Wastewater Division to perform an \ > underwater inspection of the Hilo Wastewater Treatment Plant (WWTP) • N aka )': Outfall outfall. The purpose of the inspection was to satisfy requirements of the U.S. r Environmental Protection Agency Administrative Order. H I\ SE performed inspections on the outfall in 1987, 1990, 2001, 2005, 2011, 2012 ` ' "� '�` f 2018 and 2024. The inspection was conducted by a five-man dive team using SCUBA and covered the submerged length of the outfall. Stationing was established by dropping orange plastic markers along the outfall and video was recorded along the entire length of the outfall. To help identify any leaks from the pipe, Bright Dyes® fluorescent yellow/green tracer dye was injected into the pipe through a manhole located on land near the entry point of the pipe into the ocean. No leaks were detected along the length of the outfall. SE is scheduled to perform this upcoming inspection in 2024. Cost: $48,995 (1)FIRM NAME (2)FIRM LOCATION (3)ROLE (City and State) Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 11 projects,if not specified Complete one Section F for each project) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL CONSTRUCTION Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES Hilo,Hawaii 2015 n/a 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Scope: Tropical Storm Iselle hit the east side of Noterie=,oeo,tFestorm=H^azafaoueconaiiions^an=,Waeo,i-n=^— Hawaii Island at approximately 11:00 pm on August 7, 2014,with near hurricane force winds of 70 mph. Concerns that the Hilo Harbor channel would be 381, compromised by sunken debris or other obstructions LPM'me,:pram„ 8 PM Mon �s,a�ski due to the effects of the storm prompted harbor closure until a hydrographic survey could be eyed e. completed to verify that the channel was clear of °~ 8 PM Sun -- 8PMSat obstacles. Sea Engineering,Inc. (SE)was notified at „„,--„ „pM Thn approximately noon on August 7,2014,that a survey -z y , would be necessary the following day at Hilo Harbor. dMh.r, ' .. — ssa` ,d Tropical Storm Iselle Current Information. • Forecast Positions. Two survey engineers from Sea Engineering with :• ce°=er o=a,o°,a.oN s.,w •rroa calcvc aaeP°39Troo cal Max sa:,amea wma mv" sunamemph H 7 o< mon equipment flew to Hilo mid-morning on August 8 to Potential Track Area: curer Watches: twat, p Wa'73 95„,4„o mph n >„omoa conduct the survey. The survey was successfully o°av,-3� „av45 "er"`aae °ostorm "°'"`aae�rr°a.8,orm completed,and results were communicated to the USACOE-POH at 7:00 pm on August 8,2014.The Harbor was immediately re-opened. `` s 2'' 37 I � ,_" , J 13 Co 43 M l 38 / 14 f ) 13 13 �� 14 9 39 38 3g sa 35 13 rnaer, 19 • 14 LATFORM g • 11 13 - _ pyr'y'li` Em.Lree 5�... `°e.�,eJ"..r• 4'r" 23 --'- rea:,MaAxs - 4.---ctor'61E' t', ''''' '"--,,,,7` AIA. -4,,,nii'1.r 1 ''‘ 36 ` I "42 �7,,,- ' 28 1` rr=v.. � .. tiM - - -- - _ e ua�s 31 5 10 +d 5 IV rR 60 ANCHORAGE AREA h � 9. f°° 9 g 1 i 0.t28h(see note A} 8 g, k Rk F,d• 7 h 10 4i Scan sonar mosaic of Federal Project Area,Hilo Harbor Cost: $15,000 �� (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE -�iI�JC Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 12 projects,if not specified. Complete one Section F for each project.) 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Laupahoehoe Boat Ramp Repair PROFESSIONAL CONSTRUCTION SERVICES Hawaii (Big Island) 2010 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL County of Hawaii Dept. of Parks and Recreation James Komata (808)961-8531 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Scope: Laupahoehoe Park is located on the Hamakua Coast on the northeast side of the Island of Hawaii, approximately 25 miles north-northwest of Hilo. The park contains a boat launch ramp facility and protective 250-foot-long breakwater built in 1988. The site is exposed to rough trade wind seas and north swells, and the condition of the boat ramp has deteriorated. In the summer of 2009, the launch ramp was closed due to hazardous conditions, including erosion of deep grooves in the ramp surface, exposed reinforcing rebar, and loss of traction. Sea Engineering, Inc. (SE) and Arnold T. Okubo & Associates were contracted by the County of Hawaii to investigate site conditions of the ramp, design repairs to the ramp, prepare the necessary environmental and permit documents, and provide engineering support through construction. Cost: $200,000 y flOrAtV ..dam,. *^`�. I •. `o+" .... • 7-10e414 II �If!II, h 07/2010 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE E Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in`Example Projects Key"section below before completing table. Place'X"under project key number for (From Section E,Block (From Section E,Block participation in same or similar role.) 12) 13) 1 2 3 4 5 6 7 8 9 10 11 12 David Smith, P. E. Coastal Engineer X X X X X Chris Goody, P.E. Ocean Engineer X X X X Chris Conger Project Manager X X X X X X Marc Ericksen Project Manger X X X X Ian Hardy Ocean Engineer X X X Morgan Stephenson Ocean Engineer X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) 1 Hilo Harbor Breakwater Improvements—Basis of Design 2 Laupahoehoe Harbor Breakwater Repair Basis of Design 3 Hawaii DOT Scour Critical Bridge Project 4 Pohoiki Boat Ramp Repair Relocation 5 Waikoloa Beach Management Plan 6 Mauna Kea Shoreline Restoration Project 7 Project Conditions Survey Inspections of Federal Coastal Navigation Structures 8 Anaehoomalu Bay Tsunami Damage Repair 9 Keauhou Bay Offshore Mooring Design 10 Hilo WWTP Outfall Inspection 11 Post-Storm Hydrographic Survey Hilo Harbor 12 Laupahoehoe Boat Ramp Repair H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS REQUIRED. A. SPECIALIZED EXPERIENCE OF THE FIRM Sea Engineering, Inc. (SE) specializes in coastal and ocean engineering, and marine environmental services. Experienced staff is available to undertake a wide range of projects. With experience in Hawaii, California and throughout the Pacific Basin, SE can respond rapidly to project needs, drawing on an in-house database and the knowledge gained from extensive work in the different island groups. Coastal Engineering: Marina and harbor design; coastal planning; beach nourishment design; dredging planning and analysis;design and evaluation of coastal structures for erosion control,shore protection and navigation; storm inundation analyses;beach erosion and coastal processes studies. Sea Level Rise (SLR) analysis and adaptation measures. Numerical Modeling: State-of-the-science 2- and 3-dimensional hydrodynamic and transport modeling for applications including sediment transport; contaminant transport; water quality; beach response; and discharges into marine and freshwater environments. Modeling of deep-water to nearshore wave transformation using both 2-D steady-state models and 3-D fully non-linear Boussinesq models. High resolution computational fluid dynamics (CFD). Ocean Engineering: Determination of engineering oceanographic design criteria; storm wave propagation and wave- driven circulation modeling; armor design; measurement and analysis of waves, tides currents and other parameters for planning and design; submarine pipeline and cable route selection and conceptual design. Marine Environmental: Preparation of Environmental Assessments and Impact Statements;preparation of Federal,State and City permit applications for marine projects; measurement and analysis of sediment and contaminant transport and water quality; turbidity analysis; water quality monitoring; analysis and assessment of the impact of coastal facilities on the marine environment; oceanographic studies; search and recovery of hazardous materials. SLR modeling and potential impact studies. Marine Construction Services: Fully equipped commercial diving locker to provide diving services in support of the construction and repair of pipelines, wharves, cable landings, breakwaters, offshore oil moorings, and other coastal and offshore marine facilities. Repair and construction of waterfront structures, including wharves,piers, intakes, small boat ramps and other structures. Hydrographic and Geophysical Surveys: Fully automated hydrographic and geophysical survey capability including bathymetry,side scan sonar,subbottom profiling,UXO detection,and ROV surveys. Surveys tasks have included dredge monitoring and payment, dredge design, cable route reconnaissance and selection, environmental assessment, bottom mapping,object location,and sand deposit mapping. Logistical Support: Support for oceanographic or research projects includes a fully equipped shop on the Honolulu Harbor waterfront and vessels ranging from 17 to 84 feet long. b. PROFESSIONAL QUALIFICATIONS OF STAFF TO BE ASSIGNED TO THE PROJECTS SE principals, engineers and scientists have graduate level degrees in ocean engineering and coastal geology. Most employees have worked for the firm for over 10 years. Senior level managers and engineers have worked for SE for over 20 years. Resumes of key personnel are included in this submittal. c. PAST PERFORMANCE ON SIMILAR PROJECTS SE has completed numerous contracts for the State of Hawaii and County of Hawaii on the Big Island. Sea Engineering. Inc. projects are completed within budget, on schedule and with the highest attention to quality control. Representative projects SE has worked in Hawaii County and for the State of Hawaii include the following projects: Protect Date Firm Hawaii DOT Scour Critical Bridge Project—Bathymetry& Underwater Inspections,and Permitting 2015 to present State of Hawaii DOT,KAI Hawaii Waikiki Beach Restoration 2016 to present State of Hawaii,DLNR Lahaina SBH and Mala Boat Ramp Maintenance Dredging 2023 to present State of Hawaii,DLNR Windward Highway Shore Protection 2021 to present State of Hawaii,DOT,AECOM Kamehameha Highway Shoreline Erosion Mitigation 2020 to present State of Hawaii,DOT,AECOM Wailoa Small Boat Harbor Hydrographic Survey 2024 State of Hawaii,DLNR&Element Environmental Kona Village Resort Beach Restoration 2024 Kona Village Resort Hilo Harbor Breakwater Improvements—Basis of Design 2024 USACE,Cardno GS Laupahoehoe Harbor Repair Design 2023 USACE,Cardno GS Lahaina Small Boat Harbor and Mala Boat Ramp Maintenance 2023 State of Hawaii,DLNR Dredging Regional Shoreline Strategy Scoping Study for OPSD 2023 State of Hawaii,Office of Planning& Sustainable Development,Tetra Tech Hilo WWTP Outfall Inspection 2018&2023 County of Hawaii,Wastewater Division Laupahoehoe Marine Biological Surveys&Environmental 2022 USACE,Cardno GS support Kalaeloa Fuel Pier Development 2021 State of Hawaii DOT,Mitsunaga& Associates Royal Hawaiian Groin Replacement 2020 State of Hawaii,DLNR Waikoloa Beach Management Plan 2020 Waikoloa Beach Association Harbors Oahu District Baseyard Improvements 2019 State of Hawaii DOT,RM Towill Corp Pohoiki Boat Ramp Repair-Relocation Study 2019 State of Hawaii,DOBOR Pier 28-33 Hydrographic Survey Honolulu Harbor 2019 State of Hawaii DOT,Westin Solutions Pohoiki Boat Ramp Repair Relocation 2019 State of Hawaii,DOBOR Hilo Ocean Outfall Inspection 2018 County of Hawaii Laupahoehoe Harbor Breakwater Repair 2018 USCOE,Nagamine Okawa,Engineers, Mauana Kea Shoreline Restoration Project 2018 Hookuleana LLC,Prince Resorts Hawaii Kahului Harbor Pier 2 High Spot Hydrographic Survey 2018 State of Hawaii DOT,Control Point Surveying Anaehoomalu Bay Tsunami Damage Repair 2016 Waikoloa Beach Association d. CAPACITY TO ACCOMPLISH WORK SE has a proven capacity for accomplishing work on time and on budget. We have participated in numerous design projects which have been successfully constructed. We have an experienced staff available to undertake a wide variety of coastal-related engineering projects,and our projected workload will permit timely accomplishment of future work. e. KNOWLEDGE OF THE LOCALITY SE is located in Honolulu, Hawaii. We have performed engineering studies throughout the Pacific Basin, including all the main Hawaiian Islands, Guam, the Northern Marianas, American Samoa, the Marshall Islands, Okinawa, the Federated States of Micronesia, the Republic of Palau, as well as Alaska and California. SE has considerable "local" knowledge for the Pacific region, and an extensive in-house database for the Pacific area. Sea Engineering, Inc. is a Small Business - 541330 Exception 3 —Marine Engineering & Naval Architecture and 237990—Other Heavy and Civil Engineering and Construction. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE June 25,2025 41. NAME and TITLE(Print or type) Chris Conger,Vice President 1. SOLICITATION NUMBER(if any) ARCHITECT-ENGINEER QUALIFICATIONS County of Hawaii FY 2025-2026 PART II—GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM(OR BRANCH OFFICE)NAME 3. YEAR 4. DUNS NUMBER ESTABLISHED SEA ENGINEERING,INC. - � 1973 DUNS#: 066273905 7�% CAGE: 0H711 2b. STREET 504 N.Nimitz Hwy 5. OWNERSHIP 2c. CITY 2d. STATE 2e. ZIP CODE a. TYPE Honolulu HI 96817 Corporation 6a. POINT OF CONTACT NAME and TITLE b. SMALL BUSINESS STATUS Chris Conger,Vice President Small Business-Engineering Services, Marine Engineering 6b. TELEPHONE NUMBER 6d. E-MAIL ADDRESS 7. NAME OF FIRM(If block 2a is a branch office) (808) 536-3603 cconger@seaengineering.com 8a. FORMER FIRM NAMES(S)(If any) 8b. YR. 8c. DUNS NUMBER ESTABLISHED 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL 9. EMPLOYEES BY DISCIPLINE AVERAGE REVENUE FOR LAST 5 YEARS a. c. No.of Employees c.Revenue a.Profile Function b. Discipline (2) b. Experience Index No. Code (1)Firm Branch Code (see below) 01 Administrative 5 0 B02 Bridges 1 12 Civil Engineer 4 0 C05 Coastal Engineering 6 30 Geologist 3 0 D04 Design-Build 2 Ocean Engineer 7 1 E08 EIS 5 Coastal Engineer 6 0 HO1 Harbors,jetties, etc. 3 44 Oceanographer 1 0 H13 Hydrographic Surveying 3 23 Environmental Engineer 1 0 002 Oceanographic Engineering 4 42 Mechanical Engineer 1 0 R04 Marinas 1 R11 Rivers, Canals,Waterways 1 Total 28 1 S 10 Surveying,mapping 2 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES PROFESSIONAL SERVICES REVENUE INDEX NUMBER OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 1. Less than$100,000 6. $2 million to less than$5 million a. Federal Work 5 2. $100,000 to less than$250,000 7. $5 million to less than$10 million 3. $250,000 to less than$500,000 8. $10 million to less than$25 million b. Non-Federal 5 4. $500,000 to less than$1 million 9. $25 million to less than$50 million Work 5. $1 million to less than$2 million 10. $50 million or greater c. Total Work 6 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE i ( ) June 25,2025 c. NAME OF AUTHORIZED(Print or type) d. TITLE(Print or type) Chris Conger Vice-President Sea Engineering, Inc. 504 N. Nimitz Hwy • Honolulu, Hawaii 96817 Phone: (808) 536-3603• Website:www.seaengineering.com SE CORPORATE REFERENCES Professional Services (July 2025 to June 2026) Ms. Elaine Morisato, Civil Engineer Department of Design & Construction 650 So. King St., 11th Floor Honolulu, HI 96813 Mr. Ross Tanimoto, Deputy Director City & County of Honolulu, Dept. of Environmental Services 1000 Uluohia St., Suite 308 Kapolei, Hawaii 96707 Mr. Mike Hunneman, Vice President KAI Hawaii 50 S. Beretania Street, #C-119C Honolulu, HI 96813 Phone: (808) 533-2210 Mr. Rick Heltzel, President Healy Tibbitts Builders, Inc. 99-994 lwaena Street, #A Aiea, Hawaii 96701 Phone: (808) 487-3664 Mr. Michael Cain, Administrator Department of Land & Natural Resources Office of Conservation and Coastal Lands Kalanimoku Building 1151 Punchbowl St., Rm 131 Honolulu, Hawaii 96813 Phone: (808) 587-0377 ` '.E Sea Engineering, Inc. g g� 504 N.Nimitz Hwy• Honolulu, HI 96817 • Phone: (808) 536-3603• Website:www.seaengineering.com SE AWARDS: • 2025 ACEC Engineering Excellence Honor Award — Optimizing Breakwater Repairs for a Changing Climate • 2024 ASCE Best Transportation Project - Single-Platform Integrated, Simultaneous Multibeam Bathymetric and LiDAR Topographic Data Acquisition System — Kaumalapau Harbor, Emergency Survey • 2023 GCA Build Hawaii Awards—USS Arizona Memorial Shoreside Dock Replacement • 2023 ASCE OCEA Award for Best Studies and Research Project—Future Stability and Adaptation Under Sea Level Rise at Hilo Breakwater • 2022 ASBPA Robert L. Weigel Award—Iroquois Point Beach Nourishment and Stabilization • 2022 ASBPA Best Restored Beach—Waikiki Beach Maintenance • 2021 ASCE Project of the Year, Region 8. Less than $10M Royal Hawaiian Groin Replacement • 2020 ASCE Best Small Project—Punaluu Beach Park Emergency Erosion Protection Design-Build • 2020 GCA Build Hawaii Awards—GRAND AWARD—U.S.S. Arizona Memorial & Floating Dock Damage Repairs • 2020 GCA Build Hawaii Awards—EXCELLENCE AWARD—Kewalo Basin Harbor Improvements • 2020 GCA Build Hawaii Awards—MERIT AWARD—Haleiwa Beach Park Emergency Stabilization • 2020 ASCE Best Special Project—Royal Hawaiian Groin Replacement& Engineering Services • 2019 ASCE Best Research Project- Saipan Lagoon Hydrodynamic Study • 2018 ASCE Best Large Project—Governor Eloy S. Inos Peace Park Puerto Rico, Saipan, CNMI • 2014 ASBPA National Award- Best Restored Beach, Iroquois Point Beach, Oahu. • 2012 ASCE Hawaii Best Special Project Award—Waikiki Beach Maintenance Project • 2009 ASCE Hawaii Best Small Project Award—Analysis and Prediction of Waves and Surge in Kahului Harbor • 2008 ASCE Hawaii Outstanding Civil Engineering Achievement Award for the Design of Kaumalapau Harbor Breakwater Modification • 2006 U.S. Small Business Administration Administrator's Award of Excellence Region IX Subcontractor • 2004 ASCE Outstanding Civil Engineering Achievement Award for the Sewer Outfall Extension at Fort Kamehameha, Pearl Harbor, Oahu, Hawaii. PE-11453 DAVID A SMITH SEA ENGINEERING, INC. MAKAI RESEARCH PIER 41-305 KALANIANAOLE HWY WAIMANALO, HI 96795 PROFESSIONAL ENGINEER NOTICE THIS POCKET ID CARD IDENTIFIES YOU TO THE PUBLIC AS BEING CURRENTLY LICENSED AND SHOULD BE KEPT IN YOUR POSSESSION AT ALL TIMES. CLASSES(ACTIVE):CE Civil License Number Expiration date • PE-11453 4/30/2026 STATE OF HAWAII DEPARTMENT OF COMMERCE AND CONSUMER AFFAIRS PROFESSIONAL ENGINEER 17.11 CLASS(ES):CE CIVIL El ti 0 DAVID A SMITH SEA ENGINEERING,INC.MAKAI RESEARCH PIER 41-305 KALANIANAOLE HWY WAIMANALO,HI 96795 SIGNATURE OF LICENSEE E c, 0 O :!tiEIP Y la LVL it 13 U 0 To to O a as R us a U y,, 51 m I LU I `i a) y r. -,, c A z 1 ' - C _ a s 'av c a) E o J as on yod _ 013 ` N �7 O O n. c <D r. all w a) .V T..)z 0_ w Cl) i2 0. 0 ce I I— I fA I U I 5 a a. a a IS 2 a) a) 0 0 U) LL= _- 0 a) a) U c co CQ ati U a) u ca Cs Z a) c d c J r-- O 0 3 ~ ❑ V LL c N RI N CO co — Q LU ? Q Q O o LU o Y O c A' N 5)• c a.) CDo w u 33 4. C o Ce III as w 00 CD a V z E O❑ 0 CD a, J 5 co p z N C r n w Z z a .� a d y a C — H V N i 15. es rCD UHuIHI Al as ® Z 0 •, J d J d J U co U m 1 0