HomeMy WebLinkAbout2025-06-25 PL-INT-2025-010828 Sea Engineering, Inc. - Category PL.5 DeVera, Ashley
From: Brandie Markos <bmarkos@seaengineering.com>
Sent: Wednesday, June 25, 2025 9:18 AM
To: Planning Internet Mail
Subject: Sea Engineering Submittal for Professional Services FY 25/26
Attachments: Sea Engineering Professional Services 2025-2026.pdf; ltr of interest Planning Dept
2025-2026.pdf; DS Hawaii PE License (exp 04-30-2026).pdf; Goody PE License exp
04-30-2026.pdf
Aloha,
Please find attached our submittal for professional services for the upcoming fiscal year. I have also
included our cover letter and copies of the PE licenses for two our engineers.
If you should have any questions, please feel free to contact me.
6ra4".44.e. Mark.oy
Office Manager/Executive Administrative Assistant
A: 504 North Nimitz Hwy, Honolulu, HI 96817
Sea Engineering, Inc. I http://www.seaengineering.com
0: 808.536.3603 I D: 808.460.3430 I M: 808.372.6545 I E:bmarkos@seaengineering.com
1
.E .Sea Engineering, Inc.
504 N.Nimitz Highway,Honolulu, HI 96817 • Phone: (808) 536-3603 • Website:www.seaengineering.com
June 25, 2025
Mr. Jeffrey Darow, Planning Director
Planning Department, County of Hawai'i
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720
Subject: Professional Services, Fiscal Year 2025-2026
Dear Mr. Darrow:
This is in response to your solicitation for professional services dated June 1, 2025. We would be
pleased to provide professional engineering services to the County of Hawaii, Planning Department
during Fiscal Year 2025-2026 (July 1, 2025 to June 30, 2026).
Sea Engineering, Inc. (SE) specializes in coastal engineering, marine and coastal environmental
assessments, hydrographic and geophysical surveys, underwater inspection, marine construction, and
boat and diving services.
• We are specifically interested in providing services to your department in the following areas:
PL.4. Community Planning—(Community/Regional Plans, General Plan, Climate Adaptation)
-Coastal/Marine climate issues such as Sea Level Rise Vulnerability(SLR)
PL.5. Community Planning—(Environmental Planning,Environmental Assessments,
Environmental Impact Statements)—Coastal/Marine
A Federal Standard Form SF330 is enclosed presenting our experience and qualifications along with
a copy of the State of Hawaii, Professional License card for each licensed person referenced in our
submittal.
In addition, our qualifications are also available at our website: www.seaengineeering.com.
We look forward to possibly assisting the County of Hawaii, Planning Department during the coming
fiscal year. Should you desire any additional information please contact me at 808-536-3603 or by
email at cconger@seaengineering.com.
Very truly yours,
C----
Chris Conger
Vice President
ARCHITECT— ENGINEER QUALIFICATIONS
PART I—CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION(City and State)
County of Hawaii
Notice to Providers of Professional Services
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
June 1,2025 Fiscal Year 2025-2026
(July 1,2025 to June 30,2026)
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Chris Conger,Vice President 1
5. NAME OF FIRM 71 F
Sea Engineering,Inc. LJ
6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
(808) 536-3603 cconger@seaengineering.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
`o
a) r 12. FIRM NAME 13. ADDRESS 14. ROLE IN THIS
E m E CONTRACT
a a
> 2
0)
a.
Sea Engineering,Inc. Coastal and Ocean
Sea Engineering, Inc. 504 N.Nimitz Hwy Engineering,Marine
Honolulu,HI 96817 Construction,Boat
and Diving Services
b.
❑CHECK IF BRANCH OFFICE
c.
❑CHECK IF BRANCH OFFICE
d.
❑CHECK IF BRANCH OFFICE
e.
❑CHECK IF BRANCH OFFICE
f.
❑CHECK IF BRANCH OFFICE
9
❑CHECK IF BRANCH OFFICE
h.
❑CHECK IF BRANCH OFFICE
❑CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑ (Attached)
STANDARD FORM 330(6/2004)
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL b. WITH THIS FIRM
David A.Smith,Ph.D.,P.E. Senior Coastal Engineer 27 18
15. FIRM NAME and LOCATION(City and State)
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
Ph.D.,University of Hawaii-Manoa,Ocean Engineering Hawaii Professional Engineer
M.S.,University of Hawaii-Manoa,Ocean Engineering Guam Professional Engineer
B.S.,University of Hawaii-Manoa,Mathematics California Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
Member—ASCE PADI Open Water Diver Certification,Nitrox Certification
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Kamehameha Highway Shoreline Erosion Mitigation Professional Services Construction
Kaaawa,Oahu 2020 to present
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm
a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of
temporary erosion protection for Kamehameha Highway at Kaaawa, Oahu. Work tasks include preparation of a basis of
design report, an environmental assessment, construction drawings for selected plan, the Department of the Army permit
application,as well as community outreach.
Cost: $364,710 Role:Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Windward Highway Shore Protection
Windward Oahu 2021 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
b. Sea Engineering, Inc., has been contracted by AECOM for HDOT Highways Division to prepare a Draft and Final Basis
(BOD) report in support of the Windward Oahu Highway erosion mitigation project. Additional work tasks include
consultations with Federal, State, City & County agencies, neighborhood boards, and citizen groups; prepare technical
sections for a DEA;prepare construction plans and the necessary permit applications for construction.
Cost: $721,231 Role:Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Hilo Harbor Breakwater Improvements—Basis of Design Professional Services Construction
Hilo,Hawaii 2024 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Recent inspections of the Hilo breakwater have found areas of possible damage. As a result of the inspections,repairs have
c. been recommended.In support of the need for repairs,Sea Engineering,Inc.(SE)had been contracted by Cardno GS and the
U.S. Corps of Engineers(USCOE)to conduct high resolution numerical modeling of wave conditions on the breakwater at
selected future sea levels to determine stability and vulnerability of the breakwater.SE then developed several repair designs
to address the existing and future vulnerabilities.
Cost: $381,189 Role:Project Manager/Senior Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Laupahoehoe Harbor Repair Design Professional Services Construction
Laupahoehoe,Hawaii 2023 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
In 2019,USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE)to evaluate the
d. condition of the existing breakwater,develop and compare alternative repair plans,and develop conceptual repair plans and
rough order of magnitude construction costs under the U.S.Army Corps of Engineers(USACE)Operations&Maintenance
(O&M)program.In 2020,USACE retained the services of Cardno GS,Inc.,and SE to develop the repair plan through final
design.
Cost:$141,640 Role:Project Manager/Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Waikoloa Beach Management Plan Professional Services Construction
Waikoloa,Hawaii 2021 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded. To ensure the continued stability of
e.. their beach, and address concerns about sea level rise,the Waikoloa Land Company and Waikoloa Beach Association had
contracted Sea Engineering to develop a long-term plan for management and maintenance. Work included beach change
monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach
maintenance/management plan, environmental assessment and permit application, and detailed design and construction
documents.
Cost: $36,760 Role:Coastal Engineer
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Christopher Goody,P.E. Senior Ocean Engineer a. TOTAL b. WITH FIRM
28 17
15. FIRM NAME and LOCATION(City and State)
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
MS,Ocean Engineering,University of Hawaii at Manoa Hawaii Professional Engineer(Civil)
BS,Ocean Engineering,Florida Institute of Technology
18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
American Society of Civil Engineers,Marine Technology Society
SCUBA certified
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Kamehameha Hwy Shoreline Erosion Mitigation Professional Services Construction
Kaaawa,Oahu 2020 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm
a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of
temporary erosion protection for Kamehameha Highway at Kaaawa,Oahu.Work tasks include preparation of a basis of design
report,an environmental assessment,construction drawings for selected plan,the Department of the Army permit application,
as well as community outreach.
Cost: $364,710 Role: Senior Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Hilo Harbor Breakwater Improvements—Basis of Design
Hilo,Hawaii 2024 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Recent inspections of the Hilo breakwater have found areas of possible damage. As a result of the inspections,repairs have
b. been recommended.In support of the need for repairs,Sea Engineering,Inc.(SE)had been contracted by Cardno GS and the
U.S. Corps of Engineers (USCOE)to conduct high resolution numerical modeling of wave conditions on the breakwater at
selected future sea levels to determine stability and vulnerability of the breakwater. SE then developed several repair designs
to address the existing and future vulnerabilities.
Cost: $381,189 Role: Senior Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Hilo Wastewater Treatment Plant Outfall Inspection Professional Services Construction
Hilo,Hawaii 2023 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc(SE),has been contracted by the County of Hawaii Wastewater Division to inspect the Hilo Wastewater
c. Treatment Plant(WWTP)Ocean Outfall as part of the requirement in the facility's National Pollutant Discharge Elimination
System permit (NPDES Permit No. HI 00213 77). Work tasks include a visual and dye inspection, and a color video
documenting the inspection,a written report summarizing the results of the inspection noting all identified defects and their
location.
Cost: $25,995 Role: Senior Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Laupahoehoe Harbor Repair Design Professional Services Construction
Laupahoehoe,Hawaii 2023 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE) to evaluate the
d• condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and
rough order of magnitude construction costs under the U.S. Army Corps of Engineers(USACE) Operations& Maintenance
(O&M)program. In 2020,USACE retained the services of Cardno GS, Inc.,and SE to develop the repair plan through final
design.
Cost:$141,640 Role: Senior Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Laniakea Highway Relocation Coastal Assessment Professional Services Construction
Haleiwa,Oahu 2022 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
The Hawaii Department of Transportation was interested in moving Kamehameha Highway inland at Laniakea on the North
e. Shore of Oahu to alleviate hazardous traffic and pedestrian crossing. In support of planning and preparation of an
environmental assessment (EA) for the proposed project, Sea Engineering, Inc (SE) was contracted by WSP for HDOT
Highways division to complete a tsunami and wave runup and inundation analyses, and a coastal assessment of the project
site.
Cost: $60,460 Role: Senior Ocean Engineer
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL b. WITH THIS FIRM
Christopher L.Conger,Vice President Project Manager/Coastal Scientist 20 14
15. FIRM NAME and LOCATION(City and State)
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
M.Sc.,University of Hawaii-Manoa,Coastal Geology
B.S.,University of Hawaii-Manoa,Geology and Geophysics
18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
100 ton near shore Captains License,Navy Second Class Diver Certification,Commercial Diver Certification(ADC Supervisor)
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater Professional Services Construction
Inspection and Permitting 2015 to Present n/a
Hawaii Island,Kauai,&Oahu
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
a. The State Department of Transportation has assessed 27 bridges across the State for possible scour repairs. Sea Engineering
completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on
Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu. SE
is also responsible for requiring permits for the repair work.
Cost: $319,655 Role:Project Manger
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Route 50 Kauai Sea Level Rise Feasibility Study Professional Services Construction
Kauai,Hawaii 2023 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
Sea Engineering, Inc has been contracted by Bowers and Kubota and the State of Hawaii, Department of Transportation to
b. evaluate coastal hazards, sea level rise vulnerability, and wave flooding for different resiliency alternatives in the Route 50
project area. Work tasks include field investigations, review of existing available information, overview of sea level rise
projections,high-resolution sea-level rise and wave inundation modeling for future sea level rise scenarios,evaluation of coastal
mitigation and resiliency alternatives,and a detailed report presenting the results.
Cost: $71,700 Role:Project Manger
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Sea Level Rise Wave Inundation Study,Honoapiilani Highway Realignment Professional Services Construction
Olowalu and Ukumehame,Maui,Hawaii 2023 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
Sea Engineering,Inc.(SE)has been contracted by WSP and the State of Hawaii,Department of transportation to conduct a sea
c. level rise (sir) and wave inundation study for proposed roadway alignment alternatives along Honoapiilani Highway at
Ukumehame and Olowalu,Maui.Project tasks included a comprehensive summary of the current slr projections,review of the
Hawaii sea level rise exposure area,numerical modeling of wave induced flooding for a future sea level of 0.98 m(3.2 ft)for
existing topography and each of the four(4)highway realignment alternatives,and summary of project area FEMA flood hazard
zones.
Cost: $58,350 Role:Project Manager
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Kaumalapau Harbor Hydrographic Survey Professional Services Construction
Lanai,Hawaii 2024 n/a
d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc(SE)was contracted by HDR and the Hawaii Department of Transportation to conduct a multibeam
hydrographic survey of Kaumalapau Harbor to include navigable waters between Kaumalapau Wharf and the outer channel
markers.Deliverables included an xyz data file,CAD chart of sounding and contours and a survey report.
Cost: $42,7255 Role:Project Manager
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Mauna Kea Shoreline Restoration Project Professional Services Construction
Kohala Coast,Hawaii 2018 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
e. The Mauna Kea Resort on Hawaii Island planned improvements to their shoreline and hotel. Sea Engineering had been
contracted by Hookuleana LLC, Prince Resorts Hawaii to conduct detailed oceanographic and shoreline investigations to
support implementation of these improvements.
Cost: $81,800 Role:Project Manager
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL b. WITH FIRM
Marc Ericksen,Senior Executive Officer Project Manager 34 34
15. FIRM NAME and LOCATION(City and State)
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
M.S.Coastal Geology
B.S.Earth Sciences
18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
Member—ASCE,MTS,ACECH,SAME,WEDA,WEF,ASBPA
Certified Hydrographer—National Society of Professional Surveyors/Hydrographic Society of America
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
HIC-2 Interisland Cable Route Bathymetry and Biological Surveys
Oahu,Molokai,Maui,and Hawaii Island 2024 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm
a. Hawaiian Telcom is proposing to establish the Hawaii Interconnector Cable 2 (HIC-2) submarine fiber optic cable system
connecting Kauai,Oahu,Molokai,Maui and Hawaii. In support of the planning,design and environmental permitting for the
proposed cable system,Sea Engineering,Inc.(SE)has been contracted by RM Towill and Hawaiian Telcom to conduct towed
camera,bathymetry,and marine biological surveys of the proposed cable landing sites.
Cost: $$1,320,620.00 Role:Project Manager
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Kalihiwai Stream Hydrographic Survey Professional Services Construction
Kauai,Hawaii 2024 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
b. Sea Engineering,Inc.(SE)has been contracted by Park Engineering and the State of Hawaii Department of Transportation to
provide a multibeam hydrographic survey of the Kalihiwai Stream in support of scour repairs at Kalihiwai River Bridge.The
survey extends from the stream mouth to the plunge pool upstream of Kalihiwai Bridge,roughly 4500 feet.Survey deliverables
include an xyz file of the data,contour,and color-coded charts of stream depths.
Cost: $66,400 Role:Project Manger
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Laupahoehoe Biological Surveys and Environmental Support Professional Services Construction
Laupahoehoe,Hawaii 2022 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
c. Sea Engineering,Inc.,was contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine
environment within and adjacent to the Laupahoehoe Harbor breakwater.Work tasks include generating habitat maps,conduct
quantitative surveys, develop a report presenting key findings and providing qualitative information that characterizes
presence/absence and abundance of fish,macroalgae,and non-coral macroinvertebrates species.
Cost: $38,036 Role:Project Manager
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Mokapu Ocean Outfall NPDES Oceanographic Measurements
Kaneohe,Hawaii 2020 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
In support of the City and County of Honolulu's NPDES permit requirements to conduct oceanographic measurements for the
d. Kailua Regional Wastewater Treatment Plant Mokapu ocean outfall, Sea Engineering, Inc. (SEI) was responsible for
deployment of 2 acoustic Doppler current profilers for a 1-year period, collection of water samples, CTD profiles, diver
reconnaissance of proposed buoy anchor locations,fabrication of buoy sensor mounting platforms,and deployment/inspection
of two scientific monitoring buoys in the outfall vicinity.
Cost: $200,000 Role:Project Manager
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Flilo WWTP Outfall Inspection
Hilo,Hawaii 2018 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
e. Sea Engineering,Inc.(SE)was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of
the Hilo Wastewater Treatment Plant(WWTP) outfall. SE performed inspections on the outfall in 1987, 1990, 2001, 2005,
2011,and 2012 and again in September of 2018. The inspection was conducted by a five-man dive team using SCUBA and
covered the submerged length of the outfall.
Cost: $22,400 Role:Project Manager
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL b. WITH THIS FIRM
Ian Hardy Ocean Engineer 8 8
15.FIRM NAME and LOCATION(City and State)
Sea Engineering,Inc.
16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
M.S.University of Hawaii-Manoa,Ocean and Resources
Engineering
B.A.Sc.,University of British Columbia,Civil Engineering
Dip.Tech.,Camosun College,Civil Engineering Technology
18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
AAUS Scientific Diver
Boater Safety Course
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Kamehameha Highway Shoreline Erosion Mitigation Professional Services Construction
Kaaawa,Oahu 2020 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of
temporary erosion protection for Kamehameha Highway at Kaaawa,Oahu.Work tasks include preparation of a basis of design
report,an environmental assessment,construction drawings for selected plan,the Department of the Army permit application,
as well as community outreach.
Cost: $3640,710 Role:Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Route 50 Kauai Sea Level Rise Feasibility Study Professional Services Construction
Kauai,Hawaii 2023 to Present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering, Inc. (SE)has been contracted by Bowers Kubota and the State of Hawaii Department of Transportation to
b. evaluate coastal hazards, sea level rise vulnerability, and wave flooding for different resiliency alternatives in the Route 50
project area. Work tasks include field investigations, reviewing existing available information, overview of sea level rise
projections,high-resolution sea-level rise and wave inundation modeling for future sea level rise scenarios,evaluation of coastal
mitigation and resiliency alternatives,and a detailed report presenting the results.
Cost: $71,700 Role:Project Manager/Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Sea Level Rise Wave Inundation Study,Honoapiilani Highway Realignment Professional Services Construction
Honoapiilani Highway—Olowalu and Ukumehame,Maui,Hawaii 2023 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc.(SE)has been contracted by WSP and by the State of Hawaii Department of Transportation to conduct a
c. sea level rise (sir) and wave inundation study for proposed roadway alignment alternatives along Honoapiilani Highway at
Ukumehame and Olowalu, Maui. Project tasks include a comprehensive summary of the current SLR projections,review of
the Hawaii sea level rise exposure area(SLR-XA),numerical modeling of wave induced flooding for future sea level of 0.98 m
(3.2 ft)for existing topography and a summary of project area FEMA flood hazard zones.
Cost: $58,350 Role;Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Sea level Rise Inundation and ASCE Tsunami Analyses-Kalaeloa Facility Professional Services Construction
Kalaeloa,Hawaii 2023 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering has been contracted by PERC Water Corporation to conduct a sea level rise (SLR)flooding hazard analyses
d. and ASCE tsunami flow analyses for the proposed Kalaeloa Seawater Desalination Facility. The proposed scope of work
includes assessment of natural hazards associated with 100-year wave/storm events and tsunamis while incorporating sea level
rise. In addition, tsunami flow depths and velocities were determined for the project site at proposed structure locations per
ASCE7-16 design guidelines in support of structural design for tsunami loads.
Cost:$109,922 Role:Ocean Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Magic Island Lagoon Retaining Wall and Walkway Improvements Professional Services Construction
Honolulu,Hawaii 2025 n/a
e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering, Inc. (SE) was contracted by the City and County of Honolulu to provide project management, permitting,
plans,specifications,and contract documents for design of repairs of the CRM seawall and replacement of the walkway.
Cost: $405,000 Role:Ocean Engineer
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Morgan Stephenson Coastal Engineer a. TOTAL b. WTH 14 14 14SFIRM
15. FIRM NAME and LOCATION(City and State)
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
M.S.Coastal Engineering
M.S.Civil Engineering
B.S.Civil Engineering
18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
Member—ASCE
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Piilani Highway,Kalepa Revetment and Seawall Repair Professional Services Construction
Kalepa,Maui 2016 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc.,was contracted by the County of Maui,Department of Public Works to provide the design and permitting
a. of shore and road protection along an approximate 450-ft reach of the Piilani Highway at the Kalepa headland.Work included:
Topographic survey,planning and permitting,project permits,and project design.Design elements include the shore protection
revetment, shore protection seawall/retaining wall, roadway improvements (asphalt paving and guardrail installation), and
additional bank stabilization and possible shore protection.
Cost: $881,688 Role:Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Laupahoehoe Harbor Repair Design Professional Services Construction
Laupahoehoe,Hawaii 2023 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SE) to evaluate the
b• condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and
rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE) Operations & Maintenance
(O&M)program. In 2020,USACE retained the services of Cardno GS, Inc., and SE to develop the repair plan through final
design.
Cost:$141,640 Role:Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction
Puna,Hawaii 2020 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
c. Sea Engineering was contracted by the Dept Intent of Land&Natural Resources—DOBOR to provide coastal engineering and
environmental permitting services to determine the scope of work,environmental permitting requirements,and cost estimates
to repair and improve the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island.
Cost: $42,960 Role: Coastal Engineer
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Kalaeloa Harbor Channel&Basin Hydrographic Survey Professional Services Construction
Kalaeloa Harbor,Oahu 2019 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
d. Sea Engineering, Inc (SE)was contracted by Control Point Surveying for HDOT Harbors Division to provide a Multibeam
hydrographic Survey of the channel and basin areas of Kalaeloa Barbers Point Harbor.Project deliverables included an xyz file
of the bathymetry data and a color-coded DEM.
Cost: $20,300 Role:Coastal Engineer/Hydrographic Surveyor
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Lahaina Small Boat Harbor Maintenance Dredging Design Services Professional Services Construction
Lahaina,Maui 2018 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Lahaina Small Boat Harbor consisted of 16 berths, 83 moorings, loading docks, a fuel facility, and restrooms. The harbor
e. experienced extensive damage during the August 8,2023,wildfires. Most of the harbor infrastructure and vessels were either
destroyed in the fire or damaged beyond repair. Sea Engineering, Inc (SE)was contracted by Department of Land&Natural
Resources — DOBOR to provide a harbor and channel post fire investigation. Work tasks include design and dredging
multibeam surveys;preparation of dredge plans,specifications and bidding documents;pre and post dredge biological surveys;
and obtaining all required permitting.
Cost: $300,442 Role:Coastal Engineer/Hydrographic Surveyor
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 1
agency,or 10 projects,if not specified. Complete one Section F for each project)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Hilo Harbor Breakwater Improvements—Basis of Design PROFESSIONAL SERVICES CONSTRUCTION
Hilo,Hawaii 2024
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
U.S. Army Corps of
Ben Berridge—Cardno GS 808-476-0067
Engineers
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
The Hilo Harbor breakwater is an
approximately two-mile-long
rubble mound rock structure that
protects inner Hilo Bay's port
facilities from direct wave
exposure. �. ��
Recent inspections of the Hilo
breakwater have found areas of
possible damage, mostly limited to -
local areas along the structure. •
Multiple visual inspections of the
breakwater were conducted as part
of the annual Project Condition Surveys (PCS), which were performed by a mix of USACE and Sea
Engineering, Inc. (SE) inspection teams in 2015, 2016, 2017, 2018, 2020, and 2021. Observed
irregularities were found to include displaced armor units, attrition of supportive core stone (hollowing
out of core),structure slumping,and excessive settling. As a result of the inspections,repairs have been
recommended in numerous locations
15610°W 15508°W 15506.W
100.111 W identified along the breakwater and vary in
E I size from very localized to hundreds of feet
in length.
' In support of the need for repairs to the
-•,Y:
f0• breakwater, SE was contracted by Cardno
GS and the U.S. Army corps of Engineers
to develop, analyze, organize and
summarize all necessary design
' conditions, that will constitute an updated
Basis of Design(BoD).
� y •t 4�s $ 5iY'i7i ry n
15505°W 15504.W
This project won the 2023 ASCE OCEA Award for Best Studies and Research Project—Future Stability
and Adaptation Under Sea Lever Rise at Hilo Breakwater.
Cost: $381,189
• (1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 2
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Laupahoehoe Harbor Breakwater Repair Basis of Design PROFESSIONAL SERVICES CONSTRUCTION
Laupahoehoe,Hawaii 2023
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
U.S. Army Corps of
Cardno GS,Inc.—Ben Berridge 808-476-0067
Engineers
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Laupahoehoe Harbor is located on the Hamakua
Coast on the northeast side of the Island of
Hawaii, approximately 25 miles north- ,,
northwest of Hilo. The facility includes a boat
launch ramp and protective, 200-foot-long - — s IMP " �`°- -
breakwater that was built in 1988. The usability — ."
of the boat ramp has decreased since the facility n "
was built and the breakwater has lost - '',Y y"
fir.
effectiveness in reducing wave energy at the sue' "y= .i
boat ramp, decreasing functionality of the
harbor. ,-' `
In 2019, USACE retained the services of
Nagamine Okawa Engineers, Inc. and Sea �a ` a
eln+bnV
Engineering,Inc. (SE)to evaluate the condition . 'f'
of the existing breakwater,develop and compare r` �
alternative repair plans, and develop conceptual ,.,_. �,� '� i:
�.
repair plans and rough order of magnitude . '' �' , ,,.
construction costs under the U.S. Army Corps �fr �`
of Engineers (USACE) Operations & 'r 4, " :.
°�
Maintenance (O&M)program.
In 2020,USACE retained the services of Cardno a , " o"1,-'--- `4 F `'`
GS, Inc., and SE to develop the repair plan � ,"i-c,„
through final design. '4 L'`s
1 5;Z5- 'S,
,
ti.t � ,
GPA.P-IC G;,LE: as A q
Cost: $141,640
fi FW.fl as RFi Arnr LO NIA' •'J'' i� Sex .
,a. "
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
E (City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 3
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Hawaii DOT Scour Critical Bridge Project—Bathymetry PROFESSIONAL CONSTRUCTION
SERVICES
and Underwater Inspection
Hawaii Island,Kauai, Oahu,HI 2015 to present n/a
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
State of Hawaii,DOT Kai Hawaii—Mike Hunneman 808-533-2210
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
' ' ' :r,.t ,4
The State Department of �' ' z "' ,.
Transportation is assessing up to 27 , ' �yt,
bridges across the State for possible w k �0 '
scour repairs. In support of this E 13, ��f'` , �� h M � a"` 41
effort, Sea Engineering completed Iiiii:1,1 -:;.' ,-,i,...:.,':11...-1
bathymetry surveys and underwater ' � , � a1„, ;
inspections of 5 bridges, including — _ w,, ii _ _,, ro„�.r
Kolekole Bridge and Paheehee
Bridge on Hawaii Island, Wailua
River Bridge and Wailua River
Plantation Bridge on Kauai, and the
Waimea River Bridge on Oahu. The
underwater inspections were
conducted by a three-man dive team using surface supplied air. Sea Engineering was also responsible for
obtaining all required permits for the proposed repair activities.
g.. - ' / , ' ,_--: --';7,-,:'-,;i: - INATilliiiitillrY V •Ct-r7ill*
' $ ' -.( ,
S x
_ .�
-..\ P�
Cost: 319,655
(1)FIRM NAME (2)FIRM LOCATION(City and (3)ROLE
State
Sea Engineering,Inc. Waimanalo, Oahu, Coastal/Ocean Engineering`
Hawaii
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 4
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Pohoiki Boat Ramp Repair Relocation Study PROFESSIONAL SERVICES CONSTRUCTION
Puna District, Island of Hawaii 2019
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
State of Hawaii,DLNR Edward Underwood(DOBOR) 808-587-1966
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Hawaii Island's Kilauea Volcano
41,
lower East Rift Zone began erupting on
May 3, 2018, ultimately transforming , + ' N
the landscape of the Lower Puna GRAPHIC
SCALE
district on the southeast coast of the
island. When the eruption stopped in POHOIKI
BOAT RAMP •
August 2018 lava had covered more ;,;r;
than 13 square miles of residential, 'fra •
farm, industrial and natural lands, and '�'''�+
t' ra
created some 875 acres of new land •
extending into the ocean. At Pohoiki �' • ;.� s •C
' it° y, I
Bay, site of the State DLNR-Division � sy- ti i{ ��i 4�
of Boating and Ocean Recreation
(DOBOR) Pohoiki Boat Ramp facility, large volumes of volcanic debris (rocks, cobbles and
sand) began to fill in the bay and the vicinity of the boat ramp. By the spring of 2019 the bay
was filled, and the boat ramp was land locked by a 200-foot-wide black sand and cobble beach.
Sea Engineering was contracted by the
'IWO Department of Land and Natural Resources,
Division of Boating and Ocean Recreation, to
prepare a concept screening study for re-opening
the existing ramp facility or relocating it to an
A - alternate site. The work involved coastal
- " 47 engineering to develop concepts for evaluation,
- and development of a rough-order-of-magnitude
(ROM) construction cost estimate for the two
concepts. Planning, design and permitting costs
were also estimated.
Cost: $43,960
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 5
agency,or 10 projects,if not specified Complete one Section F for each project)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Waikoloa Beach Management Plan PROFESSIONAL SERVICES CONSTRUCTION
Waikoloa,Hawaii 2017 to present
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
Waikoloa Beach Association Scott Head 808-886-1000
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Waikoloa Beach Resort is located on the west coast of 1
the island of Hawaii, and the southern portion
encompasses the shoreline of Anaehoomalu Bay.
During a tsunami in March 2011 the beach was severely P 44.70
eroded,a 200-foot-wide breach was created through the
beach into the fishpond depositing sand in the pond,and
a a
much of the fishpond rock wall which acted as a
backstop for the beach was destroyed. Following
completion of repairs, the beach has been relatively
stable,and the additional beach crest height has reduced
wave overtopping. .
4
To ensure the continued stability of their beach, and
address concerns about sea level rise, the Waikoloa
Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long-
term plan for management and maintenance of their valuable beach resource. Work includes Beach
change monitoring, coastal assessment and preliminary concept plan, offshore sand survey,
development of a detailed beach maintenance/management plan,environmental assessment and permit
application, and detailed design and construction documents.
•
ti
PACIFIC OCEAN
Cost: $12,560
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 6
agency,or 10 projects,if not specified Complete one Section F for each project)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Mauna Kea Shoreline Restoration Project PROFESSIONAL SERVICES CONSTRUCTION
Kohala Coast,Hawaii 2018
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
Hookuleana LLC—
Prince Resorts Hawaii Peter Young 808-226-3567
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
The Mauna Kea Resort on Hawaii Island is
planning improvements to their shoreline and
hotel. Sea Engineering has been contracted to
conduct detailed oceanographic and shoreline
investigations to support implementation of
these improvements. Work tasks included:
VAN
1. Wave analyses including deepwater wave
�� climate, extreme deepwater wave height,
5\ numerical wave modeling of wave
° transformation to shallow water, wave runup,
44 analysis of a particular extreme wave event
that resulted in backshore flooding, and sea
I level rise impacts.
'ter I' 2. Site investigations including beach profile
" measurements, beach topographic survey,
1 sand sampling and analysis, and assessment
of coastal processes.
3. Development of a dune restoration plan
based on regional,typical dune morphologies.
Sea level impacts were considered, and a
design report prepared.
JN Graphic Scale
._.. � 75 0 75 15n
:v ,.. •:,a m," "`w".j!`c . ":k""' , .m"r'' � 4}:°«rae °wiz-«.., k
Cost: $81,855
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 7
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Project Conditions Survey Inspections of Federal Coastal PROFESSIONAL SERVICES CONSTRUCTION
Navigation Structures 2015,2016,& n/a
Hilo, Kawaihae,Laupahoehoe,Pohoiki 2017
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
USACE Mike Hunneman—KAI Hawaii 808-533-2210
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Sea Engineering was contracted to perform
inspections of 24 federal coastal navigation
structures (CNS)throughout Hawaii, Guam, Rota,
and American Samoa operated and maintained by rt f =
the U.S. Army Corps of Engineers (USACE), , ?4V.:"
Pacific Ocean Division (POD), Honolulu District b YY •
(POH). The purposes of the inspections were to �
verify the current condition of the structures,locate .; �
-
areas of concern on each structure, and identify and ,,,
recommend future maintenance requirements. tr,f .
Specific work tasks included: • "
Kawaihae Small Boat Harbor
1) Categorizing each CNS into distinct reaches according to type of construction (rubble-
mound, concrete armor, sheet pile, etc.); unique structural feature (head, trunk, root, etc.); and
cross-sectional features (crest elevation, side slopes, toe protection, etc.).
2) Conducting inspections by physically walking the length of each CNS and inspecting areas
including the crest, slopes, and toe of the structure. Damage was located with accurate GPS,
described and photographed.
3) Preparing draft and final post-inspection
{. " reports that summarize the findings documented
during the site inspection.
4) Preparing a plan-view map including the
aerial imagery of the project site, stationing,
: structure components, CEPD benchmark, and
the GPS location of each finding recorded during
the site inspection.
Cost: $131,994
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the g
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Anaehoomalu Bay Tsunami Damage Repair PROFESSIONAL CONSTRUCTION
SERVICES
Anaehoomalu,Waikoloa, South Kohala,Hawaii 2016
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
Waikoloa Beach Association Eleanor Mirikitani 808-886-1000
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
)
Scope: On March 11, 2011, a
tsunami generated by a massive
earthquake in Japan struck the Q
Hawaiian Islands and caused
significant damage along portions of •
the State's shoreline. Waikoloa ' .'itio s
Beach on the island of Hawaii was
directly impacted, with inundation
reaching the backshore historical
fishpond, subsequently destroying
the pond wall and creating a 200-
foot-wide breach through the beach
fronting the pond. ✓��`
Sea Engineering,Inc.was contracted
to obtain permits and do emergency The tsunami breach at VF:aikolon Beach,as photographed 03/17/2011'
repair work to close the breach, and
this work was completed in July of
2011. A sand-filled geotextile tube
barrier was installed to close the gap
in the beach. The emergency repair *
work was accomplished as an
intermediate step to protect the
fishpond while a long-term,
•
permanent repair/restoration plan for
the pond and beach can be
developed. Permanent repairs would
include rebuilding the fishpond wall
._ .
and restoration of the beach to its -
pre-tsunami condition. ,ru
Cost: $235,000
March 14,2012 Shoreline
(1)FIRM NAME (2)FIRM LOCATION(City and (3)ROLE
State)
Sea Engineering,Inc. Waimanalo, Oahu, Coastal/Ocean Engineering
Hawaii
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 9
projects,if not specified Complete one Section F for each project)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Keauhou Bay Offshore Mooring Design PROFESSIONAL CONSTRUCTION
SERVICES
Keauhou Bay,North Kona,Island of Hawaii 2013
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
State of Hawaii—DLNR Eric Yuasa 808-327-9585
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Scope: Sea Engineering Inc., was -
contracted by the State of Hawaii Division
of Boating and Ocean Recreation
(DOBOR), DLNR to redesign the mooring p�=
layout and mooring assembly design for
Keauhou Bay, Hawaii. The purpose is to 'B3
more effectively accommodate vessels and
improve mooring assembly design and
vessel and user safety.
o goo Sao
The work included the following:
• Detailed site investigation to map
existing moorings and bottom �eLOLrc �
composition
• Design of a gravity mooring _
anchor system suitable for the \\
variable,rocky,rubbly substrate in '\
of
the bay .
• Design of a mooring layout that maximizes vessel
capacity in a safe manner
•Acquisition of a Department of the Army permit for the
mooring buoys
In total, the proposed moorings will accommodate 14 vessels
ranging from 30 to 60 feet in length.Mooring locations have been
selected to avoid areas with high benthic marine life as far as
practicable.
The mooring plan calls for six 30ft vessels,three 40ft vessels,three
50ft vessels, and two 60ft vessels.
Cost: $50,700
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
.fgro,
Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the IO
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Hilo WWTP Outfall Inspection PROFESSIONAL SERVICES CONSTRUCTION
Hilo, Hawaii 2024,2018,2012,
2011
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
County of Hawaii
Wastewater Curtis Bailey 808-961-8338
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Sea Engineering, Inc. (SE) was
contracted by the Hawaii County
Wastewater Division to perform an \ >
underwater inspection of the Hilo
Wastewater Treatment Plant (WWTP) • N aka
)': Outfall
outfall. The purpose of the inspection
was to satisfy requirements of the U.S. r
Environmental Protection Agency
Administrative Order. H I\
SE performed inspections on the outfall
in 1987, 1990, 2001, 2005, 2011, 2012 ` ' "� '�` f
2018 and 2024. The inspection was
conducted by a five-man dive team
using SCUBA and covered the submerged length of the outfall. Stationing was established by dropping
orange plastic markers along the outfall and video was recorded along the entire length of the outfall.
To help identify any leaks from the pipe,
Bright Dyes® fluorescent yellow/green
tracer dye was injected into the pipe
through a manhole located on land near
the entry point of the pipe into the ocean.
No leaks were detected along the length
of the outfall.
SE is scheduled to perform this
upcoming inspection in 2024.
Cost: $48,995
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State)
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 11
projects,if not specified Complete one Section F for each project)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
PROFESSIONAL CONSTRUCTION
Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES
Hilo,Hawaii 2015 n/a
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Scope: Tropical Storm Iselle hit the east side of Noterie=,oeo,tFestorm=H^azafaoueconaiiions^an=,Waeo,i-n=^—
Hawaii Island at approximately 11:00 pm on August
7, 2014,with near hurricane force winds of 70 mph.
Concerns that the Hilo Harbor channel would be 381,
compromised by sunken debris or other obstructions LPM'me,:pram„
8 PM Mon
�s,a�ski
due to the effects of the storm prompted harbor
closure until a hydrographic survey could be eyed e.
completed to verify that the channel was clear of °~ 8 PM Sun --
8PMSat
obstacles. Sea Engineering,Inc. (SE)was notified at „„,--„ „pM Thn
approximately noon on August 7,2014,that a survey -z y ,
would be necessary the following day at Hilo Harbor. dMh.r, ' .. — ssa` ,d
Tropical Storm Iselle Current Information. • Forecast Positions.
Two survey engineers from Sea Engineering with :• ce°=er o=a,o°,a.oN s.,w •rroa calcvc aaeP°39Troo cal
Max sa:,amea wma mv" sunamemph H 7 o< mon
equipment flew to Hilo mid-morning on August 8 to Potential Track Area: curer Watches: twat, p Wa'73 95„,4„o mph n >„omoa
conduct the survey. The survey was successfully o°av,-3� „av45 "er"`aae °ostorm "°'"`aae�rr°a.8,orm
completed,and results were communicated to the USACOE-POH at 7:00 pm on August 8,2014.The Harbor
was immediately re-opened.
`` s 2'' 37
I �
,_" , J 13 Co
43 M l 38 /
14 f ) 13 13
�� 14 9
39 38 3g sa 35 13 rnaer, 19 • 14 LATFORM g
• 11 13 - _
pyr'y'li` Em.Lree 5�... `°e.�,eJ"..r• 4'r" 23
--'- rea:,MaAxs -
4.---ctor'61E' t', ''''' '"--,,,,7` AIA. -4,,,nii'1.r 1 ''‘ 36
`
I "42
�7,,,- ' 28 1` rr=v.. � .. tiM
- - -- - _ e ua�s 31
5 10 +d
5 IV rR 60 ANCHORAGE AREA h �
9. f°° 9 g 1 i 0.t28h(see note A} 8 g, k
Rk
F,d• 7 h 10 4i
Scan sonar mosaic of Federal Project Area,Hilo Harbor
Cost: $15,000
�� (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE
-�iI�JC Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 12
projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Laupahoehoe Boat Ramp Repair PROFESSIONAL CONSTRUCTION
SERVICES
Hawaii (Big Island) 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
County of Hawaii
Dept. of Parks and Recreation James Komata (808)961-8531
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Scope: Laupahoehoe Park is located on the Hamakua Coast on the northeast side of the Island
of Hawaii, approximately 25 miles north-northwest of Hilo. The park contains a boat launch
ramp facility and protective 250-foot-long breakwater built in 1988. The site is exposed to rough
trade wind seas and north swells, and the condition of the boat ramp has deteriorated. In the
summer of 2009, the launch ramp was closed due to hazardous conditions, including erosion of
deep grooves in the ramp surface, exposed reinforcing rebar, and loss of traction. Sea
Engineering, Inc. (SE) and Arnold T. Okubo & Associates were contracted by the County of
Hawaii to investigate site conditions of the ramp, design repairs to the ramp, prepare the
necessary environmental and permit documents, and provide engineering support through
construction.
Cost: $200,000
y
flOrAtV
..dam,. *^`�. I •. `o+" ....
•
7-10e414 II
�If!II,
h
07/2010
(1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE
E Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL CONTRACT (Fill in`Example Projects Key"section below before completing table. Place'X"under project key number for
(From Section E,Block (From Section E,Block participation in same or similar role.)
12) 13) 1 2 3 4 5 6 7 8 9 10 11 12
David Smith, P. E. Coastal Engineer X X X X X
Chris Goody, P.E. Ocean Engineer X X X X
Chris Conger Project Manager X X X X X X
Marc Ericksen Project Manger X X X X
Ian Hardy Ocean Engineer X X X
Morgan Stephenson Ocean Engineer X X X X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F)
1 Hilo Harbor Breakwater Improvements—Basis of Design
2 Laupahoehoe Harbor Breakwater Repair Basis of Design
3 Hawaii DOT Scour Critical Bridge Project
4 Pohoiki Boat Ramp Repair Relocation
5 Waikoloa Beach Management Plan
6 Mauna Kea Shoreline Restoration Project
7 Project Conditions Survey Inspections of Federal Coastal Navigation Structures
8 Anaehoomalu Bay Tsunami Damage Repair
9 Keauhou Bay Offshore Mooring Design
10 Hilo WWTP Outfall Inspection
11 Post-Storm Hydrographic Survey Hilo Harbor
12 Laupahoehoe Boat Ramp Repair
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS REQUIRED.
A. SPECIALIZED EXPERIENCE OF THE FIRM
Sea Engineering, Inc. (SE) specializes in coastal and ocean engineering, and marine environmental services.
Experienced staff is available to undertake a wide range of projects. With experience in Hawaii, California and
throughout the Pacific Basin, SE can respond rapidly to project needs, drawing on an in-house database and the
knowledge gained from extensive work in the different island groups.
Coastal Engineering: Marina and harbor design; coastal planning; beach nourishment design; dredging planning and
analysis;design and evaluation of coastal structures for erosion control,shore protection and navigation; storm inundation
analyses;beach erosion and coastal processes studies. Sea Level Rise (SLR) analysis and adaptation measures.
Numerical Modeling: State-of-the-science 2- and 3-dimensional hydrodynamic and transport modeling for applications
including sediment transport; contaminant transport; water quality; beach response; and discharges into marine and
freshwater environments. Modeling of deep-water to nearshore wave transformation using both 2-D steady-state models
and 3-D fully non-linear Boussinesq models. High resolution computational fluid dynamics (CFD).
Ocean Engineering: Determination of engineering oceanographic design criteria; storm wave propagation and wave-
driven circulation modeling; armor design; measurement and analysis of waves, tides currents and other parameters for
planning and design; submarine pipeline and cable route selection and conceptual design.
Marine Environmental: Preparation of Environmental Assessments and Impact Statements;preparation of Federal,State
and City permit applications for marine projects; measurement and analysis of sediment and contaminant transport and
water quality; turbidity analysis; water quality monitoring; analysis and assessment of the impact of coastal facilities on
the marine environment; oceanographic studies; search and recovery of hazardous materials. SLR modeling and potential
impact studies.
Marine Construction Services: Fully equipped commercial diving locker to provide diving services in support of the
construction and repair of pipelines, wharves, cable landings, breakwaters, offshore oil moorings, and other coastal and
offshore marine facilities. Repair and construction of waterfront structures, including wharves,piers, intakes, small boat
ramps and other structures.
Hydrographic and Geophysical Surveys: Fully automated hydrographic and geophysical survey capability including
bathymetry,side scan sonar,subbottom profiling,UXO detection,and ROV surveys. Surveys tasks have included dredge
monitoring and payment, dredge design, cable route reconnaissance and selection, environmental assessment, bottom
mapping,object location,and sand deposit mapping.
Logistical Support: Support for oceanographic or research projects includes a fully equipped shop on the Honolulu
Harbor waterfront and vessels ranging from 17 to 84 feet long.
b. PROFESSIONAL QUALIFICATIONS OF STAFF TO BE ASSIGNED TO THE PROJECTS
SE principals, engineers and scientists have graduate level degrees in ocean engineering and coastal geology. Most
employees have worked for the firm for over 10 years. Senior level managers and engineers have worked for SE for
over 20 years. Resumes of key personnel are included in this submittal.
c. PAST PERFORMANCE ON SIMILAR PROJECTS
SE has completed numerous contracts for the State of Hawaii and County of Hawaii on the Big Island. Sea Engineering.
Inc. projects are completed within budget, on schedule and with the highest attention to quality control. Representative
projects SE has worked in Hawaii County and for the State of Hawaii include the following projects:
Protect Date Firm
Hawaii DOT Scour Critical Bridge Project—Bathymetry&
Underwater Inspections,and Permitting 2015 to present State of Hawaii DOT,KAI Hawaii
Waikiki Beach Restoration 2016 to present State of Hawaii,DLNR
Lahaina SBH and Mala Boat Ramp Maintenance Dredging 2023 to present State of Hawaii,DLNR
Windward Highway Shore Protection 2021 to present State of Hawaii,DOT,AECOM
Kamehameha Highway Shoreline Erosion Mitigation 2020 to present State of Hawaii,DOT,AECOM
Wailoa Small Boat Harbor Hydrographic Survey 2024 State of Hawaii,DLNR&Element
Environmental
Kona Village Resort Beach Restoration 2024 Kona Village Resort
Hilo Harbor Breakwater Improvements—Basis of Design 2024 USACE,Cardno GS
Laupahoehoe Harbor Repair Design 2023 USACE,Cardno GS
Lahaina Small Boat Harbor and Mala Boat Ramp Maintenance 2023 State of Hawaii,DLNR
Dredging
Regional Shoreline Strategy Scoping Study for OPSD 2023 State of Hawaii,Office of Planning&
Sustainable Development,Tetra Tech
Hilo WWTP Outfall Inspection 2018&2023 County of Hawaii,Wastewater Division
Laupahoehoe Marine Biological Surveys&Environmental 2022 USACE,Cardno GS
support
Kalaeloa Fuel Pier Development 2021 State of Hawaii DOT,Mitsunaga&
Associates
Royal Hawaiian Groin Replacement 2020 State of Hawaii,DLNR
Waikoloa Beach Management Plan 2020 Waikoloa Beach Association
Harbors Oahu District Baseyard Improvements 2019 State of Hawaii DOT,RM Towill Corp
Pohoiki Boat Ramp Repair-Relocation Study 2019 State of Hawaii,DOBOR
Pier 28-33 Hydrographic Survey Honolulu Harbor 2019 State of Hawaii DOT,Westin Solutions
Pohoiki Boat Ramp Repair Relocation 2019 State of Hawaii,DOBOR
Hilo Ocean Outfall Inspection 2018 County of Hawaii
Laupahoehoe Harbor Breakwater Repair 2018 USCOE,Nagamine Okawa,Engineers,
Mauana Kea Shoreline Restoration Project 2018 Hookuleana LLC,Prince Resorts Hawaii
Kahului Harbor Pier 2 High Spot Hydrographic Survey 2018 State of Hawaii DOT,Control Point
Surveying
Anaehoomalu Bay Tsunami Damage Repair 2016 Waikoloa Beach Association
d. CAPACITY TO ACCOMPLISH WORK
SE has a proven capacity for accomplishing work on time and on budget. We have participated in numerous design
projects which have been successfully constructed. We have an experienced staff available to undertake a wide variety
of coastal-related engineering projects,and our projected workload will permit timely accomplishment of future work.
e. KNOWLEDGE OF THE LOCALITY
SE is located in Honolulu, Hawaii. We have performed engineering studies throughout the Pacific Basin, including all
the main Hawaiian Islands, Guam, the Northern Marianas, American Samoa, the Marshall Islands, Okinawa, the
Federated States of Micronesia, the Republic of Palau, as well as Alaska and California. SE has considerable "local"
knowledge for the Pacific region, and an extensive in-house database for the Pacific area.
Sea Engineering, Inc. is a Small Business - 541330 Exception 3 —Marine Engineering & Naval Architecture and
237990—Other Heavy and Civil Engineering and Construction.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE 32. DATE
June 25,2025
41. NAME and TITLE(Print or type)
Chris Conger,Vice President
1. SOLICITATION NUMBER(if any)
ARCHITECT-ENGINEER QUALIFICATIONS County of Hawaii
FY 2025-2026
PART II—GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM(OR BRANCH OFFICE)NAME 3. YEAR 4. DUNS NUMBER
ESTABLISHED
SEA ENGINEERING,INC. - � 1973 DUNS#: 066273905
7�% CAGE: 0H711
2b. STREET
504 N.Nimitz Hwy 5. OWNERSHIP
2c. CITY 2d. STATE 2e. ZIP CODE a. TYPE
Honolulu HI 96817 Corporation
6a. POINT OF CONTACT NAME and TITLE b. SMALL BUSINESS STATUS
Chris Conger,Vice President Small Business-Engineering Services,
Marine Engineering
6b. TELEPHONE NUMBER 6d. E-MAIL ADDRESS 7. NAME OF FIRM(If block 2a is a branch office)
(808) 536-3603 cconger@seaengineering.com
8a. FORMER FIRM NAMES(S)(If any) 8b. YR. 8c. DUNS NUMBER
ESTABLISHED
10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL
9. EMPLOYEES BY DISCIPLINE
AVERAGE REVENUE FOR LAST 5 YEARS
a. c. No.of Employees c.Revenue
a.Profile
Function b. Discipline (2) b. Experience Index No.
Code (1)Firm Branch Code (see below)
01 Administrative 5 0 B02 Bridges 1
12 Civil Engineer 4 0 C05 Coastal Engineering 6
30 Geologist 3 0 D04 Design-Build 2
Ocean Engineer 7 1 E08 EIS 5
Coastal Engineer 6 0 HO1 Harbors,jetties, etc. 3
44 Oceanographer 1 0 H13 Hydrographic Surveying 3
23 Environmental Engineer 1 0 002 Oceanographic Engineering 4
42 Mechanical Engineer 1 0 R04 Marinas 1
R11 Rivers, Canals,Waterways 1
Total 28 1 S 10 Surveying,mapping 2
11. ANNUAL AVERAGE
PROFESSIONAL SERVICES REVENUES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
OF FIRM FOR LAST 3 YEARS
(Insert revenue index number shown at right) 1. Less than$100,000 6. $2 million to less than$5 million
a. Federal Work 5 2. $100,000 to less than$250,000 7. $5 million to less than$10 million
3. $250,000 to less than$500,000 8. $10 million to less than$25 million
b. Non-Federal 5 4. $500,000 to less than$1 million 9. $25 million to less than$50 million
Work 5. $1 million to less than$2 million 10. $50 million or greater
c. Total Work 6
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE b. DATE
i ( ) June 25,2025
c. NAME OF AUTHORIZED(Print or type) d. TITLE(Print or type)
Chris Conger Vice-President
Sea Engineering, Inc.
504 N. Nimitz Hwy • Honolulu, Hawaii 96817 Phone: (808) 536-3603• Website:www.seaengineering.com
SE CORPORATE REFERENCES Professional Services
(July 2025 to June 2026)
Ms. Elaine Morisato, Civil Engineer
Department of Design & Construction
650 So. King St., 11th Floor
Honolulu, HI 96813
Mr. Ross Tanimoto, Deputy Director
City & County of Honolulu, Dept. of Environmental Services
1000 Uluohia St., Suite 308
Kapolei, Hawaii 96707
Mr. Mike Hunneman, Vice President
KAI Hawaii
50 S. Beretania Street, #C-119C
Honolulu, HI 96813
Phone: (808) 533-2210
Mr. Rick Heltzel, President
Healy Tibbitts Builders, Inc.
99-994 lwaena Street, #A
Aiea, Hawaii 96701
Phone: (808) 487-3664
Mr. Michael Cain, Administrator
Department of Land & Natural Resources
Office of Conservation and Coastal Lands
Kalanimoku Building
1151 Punchbowl St., Rm 131
Honolulu, Hawaii 96813
Phone: (808) 587-0377
` '.E Sea Engineering, Inc.
g g�
504 N.Nimitz Hwy• Honolulu, HI 96817 • Phone: (808) 536-3603• Website:www.seaengineering.com
SE AWARDS:
• 2025 ACEC Engineering Excellence Honor Award — Optimizing Breakwater Repairs for a Changing
Climate
• 2024 ASCE Best Transportation Project - Single-Platform Integrated, Simultaneous Multibeam
Bathymetric and LiDAR Topographic Data Acquisition System — Kaumalapau Harbor, Emergency
Survey
• 2023 GCA Build Hawaii Awards—USS Arizona Memorial Shoreside Dock Replacement
• 2023 ASCE OCEA Award for Best Studies and Research Project—Future Stability and Adaptation
Under Sea Level Rise at Hilo Breakwater
• 2022 ASBPA Robert L. Weigel Award—Iroquois Point Beach Nourishment and Stabilization
• 2022 ASBPA Best Restored Beach—Waikiki Beach Maintenance
• 2021 ASCE Project of the Year, Region 8. Less than $10M Royal Hawaiian Groin Replacement
• 2020 ASCE Best Small Project—Punaluu Beach Park Emergency Erosion Protection Design-Build
• 2020 GCA Build Hawaii Awards—GRAND AWARD—U.S.S. Arizona Memorial & Floating Dock
Damage Repairs
• 2020 GCA Build Hawaii Awards—EXCELLENCE AWARD—Kewalo Basin Harbor Improvements
• 2020 GCA Build Hawaii Awards—MERIT AWARD—Haleiwa Beach Park Emergency Stabilization
• 2020 ASCE Best Special Project—Royal Hawaiian Groin Replacement& Engineering Services
• 2019 ASCE Best Research Project- Saipan Lagoon Hydrodynamic Study
• 2018 ASCE Best Large Project—Governor Eloy S. Inos Peace Park Puerto Rico, Saipan, CNMI
• 2014 ASBPA National Award- Best Restored Beach, Iroquois Point Beach, Oahu.
• 2012 ASCE Hawaii Best Special Project Award—Waikiki Beach Maintenance Project
• 2009 ASCE Hawaii Best Small Project Award—Analysis and Prediction of Waves and Surge in
Kahului Harbor
• 2008 ASCE Hawaii Outstanding Civil Engineering Achievement Award for the Design of
Kaumalapau Harbor Breakwater Modification
• 2006 U.S. Small Business Administration Administrator's Award of Excellence Region IX
Subcontractor
• 2004 ASCE Outstanding Civil Engineering Achievement Award for the Sewer Outfall Extension at
Fort Kamehameha, Pearl Harbor, Oahu, Hawaii.
PE-11453
DAVID A SMITH
SEA ENGINEERING, INC. MAKAI RESEARCH PIER 41-305 KALANIANAOLE HWY
WAIMANALO, HI 96795
PROFESSIONAL ENGINEER
NOTICE THIS POCKET ID CARD IDENTIFIES YOU TO THE PUBLIC AS BEING CURRENTLY
LICENSED AND SHOULD BE KEPT IN YOUR POSSESSION AT ALL TIMES.
CLASSES(ACTIVE):CE Civil
License Number Expiration date
•
PE-11453 4/30/2026
STATE OF HAWAII DEPARTMENT OF COMMERCE AND CONSUMER AFFAIRS
PROFESSIONAL ENGINEER 17.11
CLASS(ES):CE CIVIL El ti 0
DAVID A SMITH
SEA ENGINEERING,INC.MAKAI RESEARCH
PIER 41-305 KALANIANAOLE HWY
WAIMANALO,HI 96795
SIGNATURE OF LICENSEE
E c,
0
O :!tiEIP
Y
la
LVL it
13
U
0
To
to O
a as R
us a U
y,, 51 m I LU I
`i a) y
r. -,, c
A z 1 '
- C _ a
s 'av
c a) E o
J as
on yod _
013 ` N
�7 O O n. c <D
r.
all w a) .V T..)z 0_ w Cl) i2 0. 0
ce I I— I fA I U I
5 a a.
a
a IS
2 a) a)
0 0 U) LL=
_- 0 a) a) U
c co CQ ati
U
a) u ca Cs Z a)
c d c J r-- O 0
3 ~ ❑ V LL c N RI N CO co — Q
LU ? Q Q O o LU o Y
O c
A' N
5)• c a.) CDo w
u
33 4. C o Ce III
as w 00
CD
a V z E O❑ 0 CD a,
J 5 co p z N C r n
w Z z a .� a
d y a
C — H V N i
15.
es rCD UHuIHI
Al as
® Z
0 •, J d J d J U co U m 1 0