|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Harlee Meyers Planning Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 3 3
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND
<br /> DISCIPLINE)
<br /> MURP, Urban and Regional Planning, University of Hawaii at Manoa, 2021
<br /> B.S., Global Environmental Science, University of Hawaii at Manoa, 2018
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pulehunui Community Development District(Design-Build) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Puunene, Maui, HI
<br /> Active --
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ElCheck if project performed with current firm
<br /> The Hawaii Community Development Authority(HCDA) is proposing to plan, design and construct infrastructure needed for the
<br /> development of the Pulehunui Community Development District on the island of Maui. Harlee is preparing the Planning
<br /> Assessment Report, the first step of the project to determine existing conditions on the site. Several planning reports have been
<br /> prepared by various agencies in the past. Her tasks includes reviewing available documents/resources and identify potential
<br /> alignment and deficiencies between existing federal, state and county planning studies/assessments.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Wahiawa Center for Workforce Excellence(CWE) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Wahiawa, Oahu, HI EA—3/2024
<br /> Permits-Active
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> State DOE is proposing the CWE adjacent to the new Wahiawa Civic Center. The facility will be used by three (3)major agencies
<br /> Hawaii State Public Library System, the DOE, and the University of Hawaii Community Colleges. Each agency will be located
<br /> separately and on separate floors with their own access control. The project will also include an adjoining multi-level parking
<br /> structure for both public and staff parking with access control. Harlee is assisting with the preparation of an EA and Zoning
<br /> Waiver.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waipahu Refuse Facility &Convenience Center PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Waipahu, Oahu, HI Active --
<br /> C (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Harlee is preparing an Environmental Assessment to meet Chapter 343, HRS requirements. The City is proposing to convert the
<br /> existing Waipahu Incinerator facility into a multi-use refuse division facility to accommodate larger public demand of the Leeward
<br /> Oahu; office and maintenance shop; and training/education center.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimea Canyon Drive/Kokee Road Improvements, Phase 2(MP 4.6 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> and 4.10),Waimea, Kauai, HI Active 2A-Awarded
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> HDOT proposes to upgrade/improve existing shoulders and guardrail systems along Waimea Canyon Road. State and federal
<br /> funds will be used for the project, thereby triggering compliance with state environmental review laws and federal cross-cutting
<br /> authorities. Harlee is assisting with preparing and processing permits including, but not limited to HRS Chapter 343
<br /> Environmental Assessment(Exemption), NHPA Section 106 consultation, and ESA, Section 7.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hilo WWTP Headworks, Primary Clarifies and Septage Station PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Upgrades, Hilo, Hawaii, HI 2024 --
<br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The COH is proposing to implement improvement at the Hilo WWTP. Keola is the Planning Project Manager conducting research,
<br /> including verifying existing conditions, reviewing available documents, and consulting with agencies, to determine required permits
<br /> and approvals.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 12
<br />
|