|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> Monica Daga Senior Planner A.TOTAL B.WITH CURRENT FIRM
<br /> 9 <1
<br /> 15.FIRM NAME AND LOCATION (City and State)
<br /> now
<br /> +Kubota Consulting,Waipahu, HI
<br /> 16.EDUCATION (Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> Bachelor of Environmental Design
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> American Planning Association-Hawaii Chapter,Member, 2023-present
<br /> Certified Member-American Association of Airport Executives,2017
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> South Ramp Redevelopment Study for Daniel K.Inouye International Airport 2020 N/A
<br /> (HNL),Honolulu,HI
<br /> a.
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Senior Consultant
<br /> SCOPE:Developed a redevelopment plan consolidating general aviation,airline/airport support,and air cargo facilities at the South Ramp.
<br /> The project goal was to ensure efficient land use and safety of aircraft and airport operations.Mrs.Daga was responsible for assisting with
<br /> the analysis and documentation. She served as the task lead for preparing the conceptual implementation schedule/sequencing plan and the
<br /> environmental overview of the preferred alternative layout.PROJECT COST:N/A
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Statewide Design Services for Program Management Support,Honolulu,HI 2024 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Senior Consultant
<br /> b• SCOPE:Provided design services for program management support for various airports including Daniel K.Inouye International Airport
<br /> (HNL),Kahului International Airport,Lihue Airport(LIH),Hilo International Airport(ITO) and Kona International Airport(KOA).Mrs.
<br /> Daga assisted with the environmental documentation for the Electric Vehicle Bus Fleet Depot Infrastructure for the HNL Consolidated
<br /> Rent-A-Car(CONRAC),the documentation for the ITO Existing Noise Assessment,Site Selection Study for the CONRAC Facility at KOA,
<br /> gate-utilization studies for LIH,as well as AutoCAD drafting for the Hawaii Statewide Airport Title 14 Code of Federal Regulations Part 77
<br /> Three-Dimensional Mapping.PROJECT COST:N/A
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Lihue Airport Master Plan and Noise Exposure Map Update,Lihue,HI 2023 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Senior Consultant
<br /> c• SCOPE:Updated the airport master plan to ensure airfield,passenger terminal,general aviation,air cargo,airline and air support facilities
<br /> meet the 20-year aviation activity demand of airport operations and passenger enplanements.The project also included a noise exposure map
<br /> update to evaluate the aircraft noise exposure within the vicinity of the airport due to aircraft fleet mix changes and airfield improvements as
<br /> well as identify potential incompatible land use.Mrs.Daga served as task lead to prepare the terminal demand/capacity analysis and facility
<br /> requirements,environmental overview,and implementation plan of the preferred alternative plan.For the Noise Exposure Map Update,Mrs.
<br /> Daga assisted with the documentation of the analyses.PROJECT COST:N/A
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Environmental Assessment for the Lanai Airport Runway Extension and Associated 2019 N/A
<br /> Improvements,Lanai,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> d ROLE:Senior Consultant
<br /> SCOPE:Evaluated the environmental impacts of the proposed infrastructure improvements to the airport environment and identify any
<br /> obstructions to airspace operations.The project also included Planning Safety Risk Assessment(SRA) Panel Meetings to evaluate with the
<br /> Federal Aviation Administration lines of businesses if the proposed project can proceed without any safety impacts and high risks to the
<br /> airfield and airspace systems.Mrs.Daga assisted with the documentation of the existing airfield and airspace systems for the presentation
<br /> to the SRA panel meetings and developed the airport layout plans drawings to reflect the proposed project and identify potential airspace
<br /> obstructions.PROJECT COST:N/A
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Statewide Rental Car Facilities Program Management,Phase II
<br /> Honolulu,HI 2019 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Senior Consultant
<br /> e. SCOPE:Provided program management support services for the consolidated rental car(ConRAC) facilities at various airports including
<br /> Daniel K.Inouye International Airport(HNL),Kahului International Airport,Lihue Airport,Hilo International Airport and Kona
<br /> International Airport.The statewide ConRAC planning efforts also included an Alternative Energy Shuttle Bus Pilot Program for the
<br /> ConRAC shuttle bus service system at HNL.Mrs.Daga served as the task lead to evaluate the feasibility of adopting electric vehicle shuttle
<br /> buses and/or compressed-natural gas shuttle buses for the ConRAC Facility at HNL.The performance metrics were based on operation
<br /> efficiency,fuel efficiency,maintenance,and cost results. She also assisted in the landside planning aspect of the Pilot Program which
<br /> included the evaluation of the shuttle bus depot facility requirements and the site location alternatives for each alternative energy's required
<br /> infrastructure.PROJECT COST:N/A
<br /> STANDARD FORM 330(7/2o2i)Page 8
<br />
|