Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Monica Daga Senior Planner A.TOTAL B.WITH CURRENT FIRM <br /> 9 <1 <br /> 15.FIRM NAME AND LOCATION (City and State) <br /> now <br /> +Kubota Consulting,Waipahu, HI <br /> 16.EDUCATION (Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> Bachelor of Environmental Design <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Planning Association-Hawaii Chapter,Member, 2023-present <br /> Certified Member-American Association of Airport Executives,2017 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> South Ramp Redevelopment Study for Daniel K.Inouye International Airport 2020 N/A <br /> (HNL),Honolulu,HI <br /> a. <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Senior Consultant <br /> SCOPE:Developed a redevelopment plan consolidating general aviation,airline/airport support,and air cargo facilities at the South Ramp. <br /> The project goal was to ensure efficient land use and safety of aircraft and airport operations.Mrs.Daga was responsible for assisting with <br /> the analysis and documentation. She served as the task lead for preparing the conceptual implementation schedule/sequencing plan and the <br /> environmental overview of the preferred alternative layout.PROJECT COST:N/A <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Statewide Design Services for Program Management Support,Honolulu,HI 2024 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Senior Consultant <br /> b• SCOPE:Provided design services for program management support for various airports including Daniel K.Inouye International Airport <br /> (HNL),Kahului International Airport,Lihue Airport(LIH),Hilo International Airport(ITO) and Kona International Airport(KOA).Mrs. <br /> Daga assisted with the environmental documentation for the Electric Vehicle Bus Fleet Depot Infrastructure for the HNL Consolidated <br /> Rent-A-Car(CONRAC),the documentation for the ITO Existing Noise Assessment,Site Selection Study for the CONRAC Facility at KOA, <br /> gate-utilization studies for LIH,as well as AutoCAD drafting for the Hawaii Statewide Airport Title 14 Code of Federal Regulations Part 77 <br /> Three-Dimensional Mapping.PROJECT COST:N/A <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Lihue Airport Master Plan and Noise Exposure Map Update,Lihue,HI 2023 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Senior Consultant <br /> c• SCOPE:Updated the airport master plan to ensure airfield,passenger terminal,general aviation,air cargo,airline and air support facilities <br /> meet the 20-year aviation activity demand of airport operations and passenger enplanements.The project also included a noise exposure map <br /> update to evaluate the aircraft noise exposure within the vicinity of the airport due to aircraft fleet mix changes and airfield improvements as <br /> well as identify potential incompatible land use.Mrs.Daga served as task lead to prepare the terminal demand/capacity analysis and facility <br /> requirements,environmental overview,and implementation plan of the preferred alternative plan.For the Noise Exposure Map Update,Mrs. <br /> Daga assisted with the documentation of the analyses.PROJECT COST:N/A <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Environmental Assessment for the Lanai Airport Runway Extension and Associated 2019 N/A <br /> Improvements,Lanai,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> d ROLE:Senior Consultant <br /> SCOPE:Evaluated the environmental impacts of the proposed infrastructure improvements to the airport environment and identify any <br /> obstructions to airspace operations.The project also included Planning Safety Risk Assessment(SRA) Panel Meetings to evaluate with the <br /> Federal Aviation Administration lines of businesses if the proposed project can proceed without any safety impacts and high risks to the <br /> airfield and airspace systems.Mrs.Daga assisted with the documentation of the existing airfield and airspace systems for the presentation <br /> to the SRA panel meetings and developed the airport layout plans drawings to reflect the proposed project and identify potential airspace <br /> obstructions.PROJECT COST:N/A <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Statewide Rental Car Facilities Program Management,Phase II <br /> Honolulu,HI 2019 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE:Senior Consultant <br /> e. SCOPE:Provided program management support services for the consolidated rental car(ConRAC) facilities at various airports including <br /> Daniel K.Inouye International Airport(HNL),Kahului International Airport,Lihue Airport,Hilo International Airport and Kona <br /> International Airport.The statewide ConRAC planning efforts also included an Alternative Energy Shuttle Bus Pilot Program for the <br /> ConRAC shuttle bus service system at HNL.Mrs.Daga served as the task lead to evaluate the feasibility of adopting electric vehicle shuttle <br /> buses and/or compressed-natural gas shuttle buses for the ConRAC Facility at HNL.The performance metrics were based on operation <br /> efficiency,fuel efficiency,maintenance,and cost results. She also assisted in the landside planning aspect of the Pilot Program which <br /> included the evaluation of the shuttle bus depot facility requirements and the site location alternatives for each alternative energy's required <br /> infrastructure.PROJECT COST:N/A <br /> STANDARD FORM 330(7/2o2i)Page 8 <br />