|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> Noah Tabar Planner A.TOTAL B.WITH CURRENT FIRM
<br /> 2 1
<br /> 15.FIRM NAME AND LOCATION (City and State)
<br /> now
<br /> +Kubota Consulting,Waipahu, HI
<br /> 16.EDUCATION (Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> Bachelor of Arts,Urban Studies
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Aruga&Ishizu Architects,Inc PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Kawailoa Youth and Family Wellness Center
<br /> Olomana,HI Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> a. ROLE:Planner
<br /> SCOPE:Infrastructure assessment,entitlements,reprogramming,master plan,environmental assessment/impact statement,and City
<br /> and County of Honolulu Plan Review Use permit application for campus improvements to Hawaii Youth Correctional Facility with
<br /> objective to be more family oriented and broader rehabilitation program and treatment.
<br /> PROJECT COST: $489,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Hawaii Youth Transportation Council
<br /> Statewide,HI 2023 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> b ROLE:Planner
<br /> SCOPE:Assist the HDOT in establishing and facilitating a Youth Transportation Council to advise on HDOT's climate mitigation
<br /> and adaptation commitments on a quarterly basis. The Youth Council will provide input on ways to reduce greenhouse gas emissions
<br /> and to adapt from climate impacts in the State's transportation network,and will help to educate and inform Hawaii's youth on
<br /> HDOT's climate mitigation and adaptation efforts. Services will include facilitation of the Youth Council,program management,
<br /> logistical and administrative support,and coordination to facilitate interactions between the council and government officials.
<br /> CONTRACT VALUE: $1,000,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Statewide Department of Transportation,Airports PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Statewide Project Management Support Services June 2024-January N/A
<br /> Honolulu,HI 2025
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Planner
<br /> c• SCOPE:B+K is providing statewide project management and planning support services for the HDOT Airports (DOT-A).Planning
<br /> services support the Engineering Planning Section (AIR-EP) in statewide airport development projects,public planning studies,
<br /> and planning document reviews.Services include GIS mapping and analysis,preparation of environmental compliance documents,
<br /> analysis in public planning studies,contracting,and planning document review.These services support a variety of projects including
<br /> the State Climate Adaptation Action Plan,the Daniel K.Inouye International Airport (HNL) Diamond Head Extension Development
<br /> Project,and the Kalaeloa Airport (JRF) Utility Systems Improvement Project.
<br /> PROJECT COST:N/A
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Kaumualii Highway Feasibility Study,Hanapepe to Kekaha,Kekaha, 2024 N/A
<br /> Kauai,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> d. ROLE:Planner
<br /> SCOPE:B+K will conduct a Feasibility Study to explore conceptual details,constraints,and prospective timelines for different
<br /> resiliency improvement alternatives based on probable future scenarios of concern for Route 50,Kaumualii Highway,from Hanapepe
<br /> to Kekaha. The scope of work will include coastal modeling of tidal flood frequency analysis and high-resolution sea level rise and
<br /> wave inundation modeling. The modeling will be conducted for a variety of future sea level rise scenarios combined with different
<br /> wave events to help estimate the frequency of occurrence of flooding at selected intervals in the future.
<br /> CONTRACT VALUE: $675,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Vulnerable Road User Safety Assessment (VRUSA)
<br /> Statewide,HI 2023 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> e. ROLE:Planner
<br /> SCOPE:Bowers+Kubota Consulting(B+K)to working with the HDOT to develop the State's first Vulnerable Road User Safety
<br /> Assessment(VRUSA).A VRUSA is an assessment of the safety performance of a State with respect to vulnerable road users and
<br /> the plan for the State to improve the safety of vulnerable road users.Addressing the safety of vulnerable road users through a
<br /> collaborative and comprehensive approach allows people that walk,bike,and roll full and safe access to our transportation system.
<br /> CONTRACT VALUE: $575,000
<br /> STANDARD FORM 330(7/2o2i)Page 11
<br />
|