E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> Jay Stone,P.E., BCEE, CFM, CPESC, CPSWQ, C1V11 Englneering Manager A.TOTAL B.WITH CURRENT FIRM
<br /> CESCPP, CWPPP,ESCPC,LEED AP 32 14
<br /> 15.FIRM NAME AND LOCATION (City and State)
<br /> rri`Bowers+Kubota Consulting,Waipahu, HI
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of Science,Civil Engineering Professional Engineer/Civil-HI [#9548 (exp.4/30/2026)]
<br /> Bachelor of Arts,English
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Board Certified Environmental Engineer,Water LEED Accredited Professional Association of Floodplain Managers
<br /> Supply&Wastewater International Society of Automation American Society of Civil Engineers
<br /> Certified Professional in Storm Water Quality Control Water Environment Federation International Society of Automation
<br /> Certified Erosion&Sediment Control Plan Preparer Certified Water Pollution Plan Preparer American Academy of Environmental
<br /> Certified Professional in Erosion&Sediment Control Hawaii Water Environment Association Engineers&Scientists
<br /> Certified Floodplain Manager American Water Works Association Erosion&Sediment Control Plan Coordinator
<br /> Hawaii Council of Engineering Societies,Past Chair
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Facility Management PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> NPDES Municipal Separate Storm Sewerhy System(MS4)Retrofit Ongoing N/A
<br /> Structural BMP Improvements Program
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Principal in Charge/Senior Civil Engineer
<br /> SCOPE:Updated the City's action plan to meet permit requirements to retrofit 10%of the City's MS4 drainage structures.Incorporated
<br /> a. planned projects from the City's other MS4 programs into the storm water retrofit planning process.Prepared plans,specifications,and
<br /> opinions of probable costs for the repair of over 70 catch basins in Kakaako,including replacement with tree filter boxes and planter boxes;a
<br /> bioretention cell at the intersection of Kapiolani Boulevard and Sheridan Street;and four different types of permeable pavement and pavers
<br /> in the existing bicycle lane on South Street.Conducted HRS 6E consultation with SHPD.Conducted an archaeological inventory survey
<br /> for the Sheridan Street project.Prepared the technical design guide of green and grey storm water BMPs for use by City personnel to select
<br /> appropriate permanent stormwater BMPs for projects.Prepared new typical details and specifications of green stormwater BMPs and new
<br /> standard details and specifications for catch basins and grated drain inlets.Prepared conceptual designs of proposed BMPs in Pearl City
<br /> Industrial Park and the Waiau commercial/industrial area.Prepared written updates to the City's SWMPP annual report.Prepared plans,
<br /> specifications,and opinions of probable construction costs for the repair of catch basins in the Ala Moana area.PROJECT COST: $2,000,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Ala Moana Regional Park Pedestrian Bridges,Canal Wall,and Pond Improvements, 2022 2023
<br /> Honolulu,HI
<br /> b. (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE: Civil Engineer
<br /> SCOPE:Processed the EIS,the Special Management Area permit,and all environmental permit applications(USACE permit,Section
<br /> 401 WQC,CZM Consistency,and NPDES permit NOI-C) for repair of the failed canal wall sections,repair of the historic Bridle Bridge,
<br /> demolition and replacement of the Piikoi Street and Queen Street bridges,and bank stabilization at the Japanese and Hawaiian Ponds within
<br /> the park.PROJECT COST: $14,600,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Aweoweo Street Drainage Outfall Improvement 2022 2022
<br /> Waialua,HI
<br /> c.
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Project Manager
<br /> SCOPE:Provided permitting and design of storm drain outfall inlet protection.Coordinating processing of all approvals and permits,along
<br /> with direction of design and preparation of construction documents.PROJECT COST:$350,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Transportation Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Complete Streets Planning and Preliminary Design 2021 N/A
<br /> Kaneohe,Kailua,and Pearl City,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> d• ROLE:Senior Civil Engineer
<br /> SCOPE:Assessed implementation of complete streets concept designs in Kaneohe,Kailua,and Pearl City area as part of planned road
<br /> rehabilitation projects in each area.Initial tasks included evaluation of existing conditions through driving,walking,and bicycling audits of
<br /> each community;identifying the complete streets network based on land use and roadway configuration;and developing preliminary street
<br /> cross-sections showing options for pedestrian walkways,bicycle lanes,shared pathways,and vehicular travel lanes.
<br /> PROJECT COST: $4,000,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> General Hydraulic Engineering Services,Oahu,HI Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> e. ROLE:Project Manager/Civil Engineer
<br /> SCOPE:Evaluating scour conditions at 96 existing bridges on Oahu including 44 City and County of Honolulu bridges.Conducting detailed
<br /> bridge inspection and preparing SERs to assess the potential for scour at each bridge.Performing hydrologic,HEC RAS analysis,and scour
<br /> calculations,environmental permits and developing a Scour Plan of Action and other related engineering services including preparation of
<br /> construction drawings,specifications and estimates necessary to address potential bridge scour.CONTRACT VALUE: $5,000,000
<br /> STANDARD FORM 330(7/2o2i)Page 14