Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> A.TOTAL B.WITH CURRENT FIRM <br /> Kathleen Chu,PE Principal-in Charge 33 3 <br /> 15.FIRM NAME AND LOCATION (City and State) <br /> v= Bowers+Kubota Consulting,Waipahu,HI <br /> 16.EDUCATION (Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> Bachelor of Science,Civil Engineering Professional Engineer/Civil-HI [#12808 (exp.4/30/2026)1 <br /> Professional Engineer/Civil-CA [#54022 (exp.12/31/2025)1 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Council of Engineering Companies of Hawaii Construction Management Association of America (CMAA) <br /> Move Oahu Forward,Vice Chair ASCE Transportation Chair <br /> Engineering Sector Partnership, Chamber of Commerce,Women in STEM Lead <br /> Hawaii Council of Engineering Societies, Current Chair <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation,Highways PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Environmental Guideline and Training Program Ongoing N/A <br /> Statewide,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> a. ROLE: Project Manager <br /> SCOPE:B+K is working to develop an environmental guideline for HDOT staff that complies with federal, state,and county <br /> environmental regulations and ordinances so that they can effectively cultivate and implement projects. The B+K team is <br /> also developing a training program for HDOT staff so that they can effectively integrate environmental clearances in a timely <br /> manner and have a better understanding of the project delivery process. <br /> PROJECT COST: $744,200 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> County of Maui,Department of Public Works PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Waiale Road Extension Project <br /> Waikapu,HI Ongoing N/A <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Project Manager <br /> b SCOPE: B+K is providing the County of Maui cradle to grave services,from planning through construction,on the Waiale <br /> Road Extension project.The roadway improvements will include a single span bridge over Waikapu Stream,roundabout <br /> intersections,two through lanes,shoulder bikeways,pedestrian sidewalks,a shared-use path,and two parallel grassy <br /> swales,which will serve as a permanent stormwater best management practice (BMP).The project team conduct agency <br /> and public coordination,both to seek input and provide information relating to the environmental and design related tasks. <br /> The environmental documentation for the improvement project will be prepared as a joint NEPA/HRS 343 environmental <br /> assessment.The construction bid documents will include construction plans,specifications,engineer's estimate,and permits. <br /> PROJECT COST: $75,000,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> State of Hawaii,Department of Transportation, Kaumualii Highway PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Feasibility Study,Hanapepe to Kekaha, Kekaha, Ongoing N/A <br /> Kauai,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> c. ROLE: Project Manager <br /> SCOPE:B+K will conduct a Feasibility Study to explore conceptual details,constraints,and prospective timelines for different <br /> resiliency improvement alternatives based on probable future scenarios of concern for Route 50, Kaumualii Highway,from <br /> Hanapepe to Kekaha. The scope of work will include coastal modeling of tidal flood frequency analysis and high-resolution <br /> sea level rise and wave inundation modeling.The modeling will be conducted for a variety of future sea level rise scenarios <br /> combined with different wave events to help estimate the frequency of occurrence of flooding at selected intervals in the future. <br /> PROJECT COST: N/A <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> County of Maui,Office of Recovery PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Maui Disaster Recovery <br /> West Maui,HI Ongoing N/A <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Project Manager <br /> d. SCOPE: B+K is a subconsultant to TetraTech providing assistance to the County of Maui in response to the devastating Lahaina <br /> fires in August 2023.B+K provides management and damage assessment assistance to the Infrastructure Resource Support <br /> Function (RSF),which includes the roadways,storm drainage,water supply,and wastewater systems. Services assist and guide <br /> the County by offering comprehensive solutions, strategic planning and coordination,and opportunities to emerge stronger and <br /> more resilient.Activities include the preparation of project worksheets,funding matrices,strategic planning for temporary and <br /> permanent housing,presentations,and a recovery roadmap. <br /> PROJECT COST: N/A <br /> STANDARD FORM 330(7/2o21)Page 3 <br />