Laserfiche WebLink
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lead and Copper Rule Revisions and Improvements Compliance, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Hawaii County, Hawaii Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Oversight. BC is helping DWS comply with the U.S. Environmental Protection Agency's s Lead and Copper Rule <br /> Improvements.Over this multi-year contract, BC and subconsultant EnviroServices&Training Center will: prepare <br /> lead service line inventories;develop a Lead Service Line Replacement Plan;create a sample site list of residential <br /> and commercial properties, and school and child care facilities;conduct tap water sampling; and perform any tasks <br /> needed for compliance. <br /> Total Contract Amount: $3.5M Client:County of Hawaii, Dept.of Water Supply <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Engineering Services to Design a Wastewater Treatment Collection PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> and Disposal System for the Pahala Wastewater Treatment Plant and 2024 N/A <br /> Post-Design, Pahala, Hawaii <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Engineer(Civil)/Deputy PM. BC provided engineering services for the closure of large capacity cesspools <br /> and construction of new wastewater infrastructure in Pahala,to meet updated effluent discharge requirements <br /> dictated by the USEPA. BC completed the planning phase,which included a preliminary engineering report, <br /> environmental assessment, regulatory and permit identification, site alternatives evaluation and land acquisition, <br /> community outreach, and conceptual alternatives for the design,construction,and commissioning of the system. <br /> While the infrastructure was originally designed around a natural treatment system to minimize environmental <br /> impacts,simplify maintenance requirements, and achieve reliability,alternative treatment technologies were <br /> evaluated to address additional constraints related to affordability and unique geology of the area. <br /> Total Contract Amount: $4.3M Client:County of Hawaii, Dept.of Environmental Management <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Engineering Services to Design a Wastewater Treatment Collection PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> and Disposal System for the Naalehu Wastewater Treatment Plant, 2024 N/A <br /> Naalehu, Hawaii <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Engineer(Civil)/Deputy PM. BC is providing engineering services for the closure of large capacity cesspools <br /> and the installation of a new wastewater collection system and treatment plant with disposal system in Naalehu, <br /> Hawaii.The scope of work for this project includes scheduling to ensure compliance with U.S. Environmental <br /> Protection Agency mandates,community outreach, preliminary engineering report, Phase 1 environmental site <br /> assessment,an environmental assessment and coordination, land acquisition. <br /> Total Contract Amount: $1.2M Client: County of Hawaii, Dept.of Environmental Management <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 10 <br />