My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> County of Hawaii, Planning Dept. <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Nathan Foged, PE*, BC.WRE ialy313 a.TOTAL b.WITH CURRENT FIRM <br /> Specialist 24 20 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell,Seattle,Washington <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MS, Bioresource/Civil Engineering, 2001 *California/Licensed Civil Engineer#66395 <br /> BS, Biological Systems Engineering, 1998 *Oregon/Licensed Professional Engineer#92342PE <br /> *Washington/Licensed Professional Engineer#45533 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Board Certified,Water Resources Engineer(BC.WRE) <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Koolaupoko Climate Resilience and Adaptation Project, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Kaneohe, Hawaii Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> H&H Modeling Lead. BC is providing engineering services to support the University of Hawaii to conduct a Military <br /> Installation Resilience Review focused on the Koolaupoko district, located on Oahu's southeastern shore.The project <br /> overall objective is to identify climate related threats and hazards to the community surrounding Kaneohe military <br /> base and to present recommendations that enhance resilience and adaption capacity of vulnerable resources within <br /> the project study area. Hawaii's unique geographic location makes the islands particularly susceptible to a myriad of <br /> climate change impacts. Sea level rise and attendant local erosion and flooding, extreme heat, altered precipitation <br /> patterns, and growing wildfire are evident and will become more prevalent in the future, placing an undue burden <br /> on coastal communities and resources across the State. In order to avoid widespread environmental catastrophe, <br /> development needs to prioritize sustainability and increasing climate resilience.The study will culminate with the three <br /> regional implementation strategies identified, mapped,which will be considered "pilot projects." Each pilot project will <br /> recommend mitigation measures to better inform efforts and benefit surrounding communities. <br /> Total Contract Amount: $235K Client: Research Corporation of the University of Hawaii <br /> b. (1)TITLEAND LOCATION(City and State) (2)YEAR COMPLETED <br /> Healthy Waters Plan,Vancouver, British Columbia,Canada PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Technical Advisor. BC is working with the City to develop a city-wide action and strategic investment plan to guide <br /> policy, regulation,advocacy and long-range investments in sewer and stormwater management.The project includes <br /> assessing the current state of the City's sewer and stormwater systems, identifying preliminary risks,and integrating <br /> climate change projections and growth predictions. BC is now developing a comprehensive, long-term city-wide plan <br /> based on a multi-stakeholder consultation process and appropriate level of analysis to inform strategic investments in <br /> green and gray infrastructure,watershed planning frameworks,and policy regulation. <br /> Total Contract Amount: $4.7M Client:City of Vancouver <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.