Laserfiche WebLink
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lahaina Wastewater Reclamation Facility NPDES Permit, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Maui, Hawaii Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Lead Scientist. In response to the United States District Court in Honolulu ruling regarding effluent discharged <br /> to groundwater via injection wells at the Lahaina Wastewater Reclamation Facility, BC is reviewing and preparing <br /> comments on draft NPDES permits issued by the State of Hawaii, Dept.of Health. BC will develop a capital and <br /> operational costs,and schedule for the County to implement NPDES permit provisions. <br /> Total Contract Amount: $90K Client:County of Maui, Dept. of Environmental Management,Wastewater <br /> Reclamation Division <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lower Kissimmee Basin Stormwater Treatment Area, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Kissimmee, Florida 2023 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Water Quality Modeler. Developed modeling work plan for simulation of phosphorus removal in a large,constructed <br /> wetland. Executed DMSTA modeling of various wetland alternatives and configurations. Interpreted results to assist <br /> selection of the preferred design and operational alternative.Conducted workshops to communicate results to South <br /> Florida Water Management District. <br /> Total Contract Amount: $6.9M Client: Ecosystem Investment Partners <br /> IBrown AND Caldwell IISTANDARD FORM 330(REV.7/2021) : 30 <br />