Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> 11.NAME 12.ROLE IN THIS CONTRACT 13.YEARS EXPERIENCE <br /> Marvin D. Heskett, III Senior Chemist a.TOTAL b.WITH CURRENT FIRM <br /> 36 11 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Element Environmental,LLC (Aiea,Hawaii) <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Biochemistry, California Polytechnic University Certified Asbestos Inspector, HIASB-4631 <br /> Certified Lead Risk Assessor, PB-1150 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> OSHA 40-hour HAZWOPER Training Sampling for Defensible Environmental Decisions, Basic <br /> OSHA 8-hour HAZWOPER Refresher Training and Advanced <br /> Shipley Group NEPA Training Confined Space Training <br /> Advanced Systems QA/QC 40-hour Course Hazardous Waste Site Supervisor Training <br /> E3 Data Quality Objective Maritime Security Awareness Training(MARSEC) <br /> Bloodborne Pathogens, First Aid, CPR,and AED Training <br /> 18.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Sewer Condition Analysis/Dieldrin Study,Oahu,Hawaii PROFESSIONAL SERVICES CONSTRUCTION <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. E2 is conducting sewer condition evaluations, developing wastewater, surface water, solids and soil sampling <br /> and testing plans, collecting and analyzing samples, performing analysis of data, and reporting on the results. <br /> E2 is developing recommendations for sewer improvements, identify priority sewers for reduction of <br /> infiltration and inflow, developing reports to address State and Federal permit requirements, and assisting <br /> with the scoping of wastewater capital improvement projects. Fee: $1M.Role: Senior Chemist. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Lead in Drinking Water Testing at Priority Areas JBPHH/NCTAMS, PROFESSIONAL SERVICES CONSTRUCTION <br /> Wahiawa,Oahu,Hawaii 2020 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. Conducted drinking water testing for LIPA as part of the protective measures at schools/childcare facilities <br /> on Navy Installations. Initial site investigations were conducted to develop a comprehensive two-step <br /> sampling plan, under updated Navy directives and Environmental Protection Agency guidance. Fieldwork <br /> involved multiple visits to each facility to prepare and sample over 700 drinking water outlets. Fee: $100K. <br /> Role: Senior Chemist. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Water Quality Monitoring,Rip-Rap Repair and Floating Dock,USCG PROFESSIONAL SERVICES CONSTRUCTION <br /> Station,Nawiliwili Small Boat Harbor,Lihue,Kauai,Hawaii 2016 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> E2 completed an Applicable Monitoring and Assessment Plan (AMAP) to monitor impacts on harbor water <br /> c• quality from a U.S. Coast Guard in-water construction project. E2 created a work plan, established baseline <br /> conditions by monitoring water quality parameters before construction, monitored water quality from a <br /> vessel in and around the construction project, assessed the final water quality post construction, and <br /> generated a final report. The project lasted a total of five weeks and ended with a comprehensive letter <br /> report and recommendations. Fee: $60,000. Role: Assistant Project Manager/Senior Chemist. <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Storm Water Management Plan Update for Commander Navy PROFESSIONAL SERVICES CONSTRUCTION <br /> Region Hawaii,JBPHH,Oahu,Hawaii 2024 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Completed inspections and updated the SWMP for CNRH under their NPDES permit. The SWMP contained <br /> d. several program components including public education and outreach, illicit discharge detection and <br /> elimination, construction site runoff control, post-construction stormwater management, pollution <br /> prevention and good housekeeping, stormwater monitoring, and reporting. Developed Storm Water Pollution <br /> Control Plans for 68 Navy industrial facilities. Provided gap analysis of previous/new permit requirements. <br /> Fee: $452K. Role: Senior Chemist. <br /> ELEMENT ENVIRONMENTAL,LLC COUNTY OF HAWAII, PAGE 8 <br />