E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.TITLE SERVICE PROVIDED
<br /> Ryan S.W.Yamauchi,P.E. Principal Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 33 20
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Element Environmental,LLC, (Aiea,Hawaii)
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.S., Civil/Environmental Engineering, UC Berkeley Registered Professional Engineer,HI - Civil No.9566
<br /> B.S., Civil Engineering,University of Hawaii at Manoa Certified Asbestos Inspector, HIASB-2905
<br /> Certified Lead Risk Assessor/Inspector, PB-0117
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> OSHA 40-hour HAZWOPER Training 40-HR Construction Safety Hazard Awareness
<br /> OSHA 8-hour HAZWOPER Refresher Training Training for Contractors
<br /> OSHA 30-hour Construction Safety and Health Training Hazardous Waste Site Supervisor Training
<br /> Confined Space Training Bloodborne Pathogens, First Aid, CPR,and AED Training
<br /> Maritime Security Awareness Training(MARSEC)
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kaneohe Bay No. 2 Wastewater Pump Station Force Main PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Improvements, Kaneohe, Oahu,Hawaii 2017 2018
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Completed a design alternatives analysis (DAR) for the replacement of the existing 14-inch force
<br /> a. main.Alternatives analyzed included horizontal directional drilling, pilot tube microtunneling, and open cut
<br /> trenching the new alignment across an existing waterway. Completed design drawings and specifications for
<br /> the selected alternative, horizontal directional drilling. Prepared the Engineering DAR, completed design
<br /> calculations for the pumps and force main design, prepared design drawings and specifications, and other
<br /> necessary permit documents. Fee: $520,000. Role: Program Manager/Principal Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Reconstruction/Replacement of Sewers,Ho`omaluhia PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Botanical Gardens,Kaneohe,Oahu,Hawaii 2025 2025
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 completed planning, design, and preparation of construction documents for the
<br /> b. reconstruction/replacement of existing sewer lines. Phase I included the cleaning and CCTV inspections in
<br /> accordance with the Pipeline Assessment Certification Program. Phase II assessed the sewer line deficiencies
<br /> from the CCTV data, developed rehabilitation/replacement alternatives for the system,prepared schematic and
<br /> concept drawings for the recommended alternatives, and prepared a cost estimate for the recommended
<br /> improvements. E2 prepared construction documents for Phase III. Fee: $840,000. Role: Program
<br /> Manager/Principal Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Large Capacity Cesspool Closures Hickam Field,Joint Base PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Pearl Harbor-Hickam (JBPHH), Oahu,Hawaii 2015 2017
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 completed an engineering design for active cesspools at five facilities. Three of the cesspool facilities were
<br /> c.
<br /> replaced with a septic tank, pump station, and raised leach field. Two of the cesspools were replaced with
<br /> pump stations that pump wastewater to the existing wastewater collection system. Evaluated present and
<br /> future wastewater flows, sizing and selecting new septic tanks, pump stations, and leach fields, and completed
<br /> construction documents. Fee: $362,372. Role: Program Manager/Principal Engineer.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimanalo Wastewater Treatment Plant Effluent Reuse PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Feasibility Study,Waimanalo,Oahu,Hawaii 2014 -
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> E2 conducted a study to assess the technical, environmental, and economic feasibility of wastewater effluent
<br /> d. reuse from the Waimanalo Wastewater Treatment Plant. Identified potential users and locations, including the
<br /> reuse demand, and transmission and storage requirements. Conducted public outreach, collected data,
<br /> researched prior studies, and evaluated costs. Prepared a conceptual layout and cost estimate for the preferred
<br /> WWTP upgrades and transmission and storage requirements for users with a strong interest in reuse. Fee:
<br /> $219,345. Role: Program Manager/Principal Engineer.