E. Resumes of Key Personnel Proposed for this Contract
<br /> (Complete one Section E for each key person.)
<br /> 20. NAME 21. ROLE IN THIS CONTRACT 22. YEARS EXPERIENCE
<br /> a.Total b.With Current Firm
<br /> Rory Earley Environmental Scientist 4 1
<br /> 23. FIRM NAME AND LOCATION(CITY AND STATE)
<br /> Haley&Aldrich,Inc., Honolulu, HI
<br /> 24. EDUCATION(DEGREE AND SPECIALIZATION) 25. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.P.P, Environmental Policy; B.S., Environmental Science
<br /> 26. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.)
<br /> Qualifications: Rory is an environmental scientist with specialized experience with Hawai'i State and Federal environmental
<br /> permitting. Her scope of experience includes environmental planning of flood plain management studies,ecosystem restoration
<br /> projects,and flood risk management projects;from initial feasibility studies to design and construction. Rory has worked on
<br /> infrastructure projects at a range of scales,from %acre bespoke remediation projects to County-wide utilities infrastructure
<br /> redesign.
<br /> ,:LEVANT PROJECTS
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> American Samoa Climate Change Vulnerability Assessment and Professional Services Construction(If Applicable)
<br /> Planning Assistance Ongoing N/A
<br /> Pago Pago,American Samoa
<br /> a (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm
<br /> This assessment and planning assistance analyzed threats to populations and critical hydrologic infrastructure in American
<br /> Samoa,and recommends infrastructure development to increase resilience.Rory's role on this project was as a project
<br /> manager, responsible for defining and managing the scope,schedule and budget,and planner, responsible for interpreting
<br /> the existing conditions and formulating plan alternatives.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Kahalu'u Bay Aquatic Ecosystem Restoration Professional Services Construction(If Applicable)
<br /> Kona, Island of Hawai'I, HI Ongoing N/A
<br /> b (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm
<br /> Rory was the primary planner on this project, responsible for coordinating environmental compliance and public
<br /> involvement,and for plan formulation and alternative analysis.This included a detailed Section 106 consultation process and
<br /> extensive collaboration with NOAA and USFWS regarding coral reef restoration alternatives.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> Wailupe Stream Flood Risk Management Professional Services Construction(If Applicable)
<br /> Oahu, HI Ongoing N/A
<br /> c (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm
<br /> Support planner responsible for alternative analysis and environmental compliance on the Wailupe Stream Flood Risk
<br /> Management program,which first began in 1998.This role included detailed risk analysis and plan formulation alternatives
<br /> analysis.
<br /> -itle and Location(City and State) (2)Year Completed
<br /> Tafuna Flood Risk Management Feasibility Study Professional Services Construction(If Applicable)
<br /> Tutuila,American Samoa Ongoing N/A
<br /> d (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm
<br /> Rory served as a support planner on a feasibility study focused on flash flooding in the Tafuna floodplain,a densely
<br /> populated area on the island of Tutuila,American Samoa. Rory compared arrays of alternative design solutions to flooding,
<br /> including culverts,debris basins, and interior drainage.The work included GIS-based structure inventory surveys,on-foot
<br /> structure inventory surveys, project risk identification and assessment.
<br /> (1)Title and Location(City and State) (2)Year Completed
<br /> City of San Diego Pure Water Program Management and Construction Professional Services Construction(If Applicable)
<br /> San Diego, CA Ongoing Ongoing
<br /> e (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm
<br /> Pure Water San Diego is the City of San Diego's phased, multi-year program that will provide nearly half of San Diego's water
<br /> supply locally by the end of 2035. Rory managed environmental requirements as related to public notification,community
<br /> outreach and involvement for 12 concurrent Phase 1 projects at different sites.