Laserfiche WebLink
E. Resumes of Key Personnel Proposed for this Contract <br /> (Complete one Section E for each key person.) <br /> 20. NAME 21. ROLE IN THIS CONTRACT 22. YEARS EXPERIENCE <br /> a.Total b.With Current Firm <br /> Rory Earley Environmental Scientist 4 1 <br /> 23. FIRM NAME AND LOCATION(CITY AND STATE) <br /> Haley&Aldrich,Inc., Honolulu, HI <br /> 24. EDUCATION(DEGREE AND SPECIALIZATION) 25. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> M.P.P, Environmental Policy; B.S., Environmental Science <br /> 26. OTHER PROFESSIONAL QUALIFICATIONS(PUBLICATIONS,ORGANIZATIONS,TRAINING,AWARDS,ETC.) <br /> Qualifications: Rory is an environmental scientist with specialized experience with Hawai'i State and Federal environmental <br /> permitting. Her scope of experience includes environmental planning of flood plain management studies,ecosystem restoration <br /> projects,and flood risk management projects;from initial feasibility studies to design and construction. Rory has worked on <br /> infrastructure projects at a range of scales,from %acre bespoke remediation projects to County-wide utilities infrastructure <br /> redesign. <br /> ,:LEVANT PROJECTS <br /> (1)Title and Location(City and State) (2)Year Completed <br /> American Samoa Climate Change Vulnerability Assessment and Professional Services Construction(If Applicable) <br /> Planning Assistance Ongoing N/A <br /> Pago Pago,American Samoa <br /> a (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm <br /> This assessment and planning assistance analyzed threats to populations and critical hydrologic infrastructure in American <br /> Samoa,and recommends infrastructure development to increase resilience.Rory's role on this project was as a project <br /> manager, responsible for defining and managing the scope,schedule and budget,and planner, responsible for interpreting <br /> the existing conditions and formulating plan alternatives. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Kahalu'u Bay Aquatic Ecosystem Restoration Professional Services Construction(If Applicable) <br /> Kona, Island of Hawai'I, HI Ongoing N/A <br /> b (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm <br /> Rory was the primary planner on this project, responsible for coordinating environmental compliance and public <br /> involvement,and for plan formulation and alternative analysis.This included a detailed Section 106 consultation process and <br /> extensive collaboration with NOAA and USFWS regarding coral reef restoration alternatives. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> Wailupe Stream Flood Risk Management Professional Services Construction(If Applicable) <br /> Oahu, HI Ongoing N/A <br /> c (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm <br /> Support planner responsible for alternative analysis and environmental compliance on the Wailupe Stream Flood Risk <br /> Management program,which first began in 1998.This role included detailed risk analysis and plan formulation alternatives <br /> analysis. <br /> -itle and Location(City and State) (2)Year Completed <br /> Tafuna Flood Risk Management Feasibility Study Professional Services Construction(If Applicable) <br /> Tutuila,American Samoa Ongoing N/A <br /> d (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm <br /> Rory served as a support planner on a feasibility study focused on flash flooding in the Tafuna floodplain,a densely <br /> populated area on the island of Tutuila,American Samoa. Rory compared arrays of alternative design solutions to flooding, <br /> including culverts,debris basins, and interior drainage.The work included GIS-based structure inventory surveys,on-foot <br /> structure inventory surveys, project risk identification and assessment. <br /> (1)Title and Location(City and State) (2)Year Completed <br /> City of San Diego Pure Water Program Management and Construction Professional Services Construction(If Applicable) <br /> San Diego, CA Ongoing Ongoing <br /> e (3)Brief Description(Brief Scope,Size,Cost,Etc.)and Specific Role ['Check If Project Performed With Current Firm <br /> Pure Water San Diego is the City of San Diego's phased, multi-year program that will provide nearly half of San Diego's water <br /> supply locally by the end of 2035. Rory managed environmental requirements as related to public notification,community <br /> outreach and involvement for 12 concurrent Phase 1 projects at different sites. <br /> STANDARD FORM 330(REV.8/2016) <br /> ALDRICH <br />