Laserfiche WebLink
COUNTY OF HAWAII I PL.4)Community Planning(CRP,GP,CA) <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section Efor each key person.) <br /> 14.YEARS EXPERIENCE <br /> Sandy Hamura, PE,LEED AP Project Manager/Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 28 3 <br /> Jacobs, Honolulu, Hawaii <br /> 1'.CJRREN'PROFESSION^-L REGIS'RA'IOn cra?EAVL It(o i.. <br /> BS,Civil Engineering Professional Engineer: Hawaii#PE-11100, Exp.4/30/2026 <br /> LEED Legacy AP <br /> Sandy has experience in strategic program and project management. Her management responsibilities include assessing, <br /> developing,prioritizing, budgeting,scheduling,managing,and executing a capital improvement program for large and small <br /> deferred maintenance and future development projects. Executes timely and efficient completion of planned projects in accordance <br /> with established guidelines,specifications,and financial constraints.Manages the complete project lifecycle:from inception where <br /> the project objectives are determined,to planning the project and defining the scope of work,determining the budget and schedule, <br /> evaluating risks associated with the project, hiring the project team,reviewing project investigations and assessments,overseeing the <br /> design,and permitting process,involvement with contractor selection,coordinating with construction management firms and finally, <br /> aid with project completion. <br /> 19.RELEVANT PROJECTS <br /> (2)YEAR COMPLETED <br /> Kamehameha Highway Wastewater Pump Station Upgrade Project, 1ONALSERVICES CONSTRUCTION(if applicable) <br /> City and County of Honolulu,Honolulu,HI Ongoing <br /> Project Manager.Responsible for bid services and office services during construction for facility improvements to rehabilitate <br /> a. the concrete walls and concrete roof slab of the existing influent wet wells,provide new sump pumps and discharge piping, <br /> replace the fuel storage tank, replacement of asphalt pavement driveway and modifications to stormwater collection system of <br /> the pump station. For this project,Jacobs developed preliminary engineering report and completed detailed design and <br /> construction documents.Services during bidding and construction is ongoing and includes submittal reviews,site <br /> investigations,and responses to requests for information(RFIs). <br /> and SLa.e, (2)NEAR COMPLETED <br /> Waianae Wastewater Treatment Plant(WWTP)Improvements and Upgrades Phase 2, PRO'SS'O SERVICES CONSTRUCTION(if applicable) <br /> City and County of Honolulu,Waianae, HI Ongoing <br /> Project Manager.Responsible for Phase 2 preliminary engineering services for technical memorandums on wastewater <br /> b. treatment including replacement of the trickling filter pumps,new effluent monitoring and sampling station,and condition <br /> assessment of the influent sewer manhole. Future services include detailed design and construction documents,preparation of <br /> permits and services during bidding. Phase 2 project includes demolition of the existing chlorine contact tank,new effluent <br /> flow measurement and sampling facility, new oil storage facility,improvements to the influent pump station building and <br /> influent manhole,restroom renovations in the Administration/Laboratory and Control buildings. <br /> (2)YEAR COMPLETED <br /> Kamehameha Highway Wastewater Pump Station Force Main System Bridge Demolition, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> City and County of Honolulu,Honolulu,HI Ongoing <br /> C. Project Manager.Leading the project team to develop bridge demolition alternatives report and review of potential required <br /> permits for the demolition of two utility bridges crossing Moanalua and Kalihi Streams and treatment of the abandoned 36" <br /> force main. Future services to include detailed design and construction documents,preparation of permits and drawings <br /> for bidding. <br /> Jacobs STANDARD FORM 330(REV.7/2021)18 <br /> TRACKING#:0063f000009AVJNAA4 <br />