|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.) C7C:Cvea,r eft
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Michael Erorita, PE Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 6 1
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Oceanit Laboratories, Inc, Honolulu, Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS Civil Engineering/2008 Hawaii, Civil Engineering, No. 19497
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Computer Skills: AutoCAD, Civil3D,WaterGEMS, SewerGEMS, HEC-RAS
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Storm Drainage Structural BMP Improvements in the Salt Lake Area, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Phase II 2024-2025
<br /> Honolulu, Hawai'i
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> a. Role: Civil Engineer. Assessed the feasibility of installing permanent stormwater BMPs to reduce pollution
<br /> collected by the City's storm drain system from discharging to the Salt Lake ponds and canals. Currently proposed
<br /> work consists of design and construction of a hydrodynamic separator and diversion box, and installation of
<br /> multiple catch basin inlet screens.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Paiko Drive Water Main Replacement PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Hawai'i 2024-2025
<br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Role: Civil Engineer. Designed and prepared construction plans, specifications, cost estimates and permits for the
<br /> replacement of approximately 1,200 feet of water mains and appurtenances along Paiko Drive for the City and
<br /> County of Honolulu, Board of Water Supply.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Big Island Jet Center PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kailua-Kona, Hawai'i 2022-2023 2023
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> C. Role: Civil Engineer. Site development for a Fixed Based Operations (FBO) at the Kona International Airport.
<br /> Scope of work for the private terminal included aircraft apron,terminal, hangars,fueling site, several parking
<br /> areas,vehicle access roads,and associated site utilities. Responsibilities: Performed grading and utility design
<br /> (water, sewer, and stormwater), and handled submittals for permitting and plan approval.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Potable Water and Wastewater System Assessments PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Multiple Locations in Guam and Japan 2019-2021
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Role: Civil Engineer. Reports provided to the Navy to assess the condition, reliability, and capacity of the water
<br /> d.
<br /> and wastewater systems at multiple military bases in Guam and Japan. Site visits, data collection,tests and
<br /> hydraulic modeling were performed to identify deficiencies in the systems and to recommend improvements.
<br /> Responsibilities: Performed field work associated with the projects, conducted hydraulic analyses using
<br /> SewerGEMs and WaterGEMs, and provided proposed recommendations to deficiencies.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kokokahi Drainage Study PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kaneohe, Hawai'i 2019-2021 2025
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> e.
<br /> Role: Civil Engineer. Evaluated existing drainage conditions at the Kokokahi residential subdivision and provided
<br /> design services to address stormwater runoff issues. Responsibilities: Performed hydrologic and hydraulic
<br /> analyses, and recommended drainage improvements.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Mokulani at Kapolei Development PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kapolei, Hawai'i 2017-2020 2020
<br /> f (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Role: Civil Engineer. Site development for a commercial property across from Wet 'n'Wild. Scope of work
<br /> included grading, road, utility, and drainage design. Responsibilities: Performed hydrologic and hydraulic
<br /> analyses, designed a detention basin, and handled plan submittals and revisions.
<br /> STANDARD FORM 330( REV. 7/2021) PAGE 1
<br />
|