|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.) C7C:OY0,r eft
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Jason Y. Lee, PE Principal,Senior Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 28 4
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Oceanit Laboratories, Inc, Honolulu, Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS Civil Engineering/1996 Hawaii, Civil Engineering, No. 13669
<br /> Nevada, Civil Engineering, No. 15275
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Computer Skills: AutoCAD, ArcGIS, HEC-1, HEC-2, HEC-RAS, Flo-2D, WSPGW, FlowMaster, CulvertMaster
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> HNL AOA Fence Replacement PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Hawai'i Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> a.
<br /> Senior Civil Engineer. Performed an assessment of over 12 miles of AOA fencing along the HNL Airport perimeter.
<br /> Served the role of Project Manager and Technical Lead of the design team for field inspections, preparation of
<br /> assessment reports highlighting condition and security compliance, and design of recommended improvements.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikiki Aquarium Effluent Discharge System Upgrade PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Hawai'i 2023
<br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 Check if project performed with current firm
<br /> Senior Civil Engineer. Evaluated and designed upgrades for the aquatic life exhibit effluent disposal system to
<br /> meet the NPDES regulatory requirements. Served the role of Project Manager and Technical Lead of the design
<br /> team for the preparation of construction plans, specifications, and cost estimates.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Saddle Road—West Side Mamalahoa Hwy (SR 190)to MP 41 (Daniel PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> K. Inouye Hwy) 2010
<br /> Island of Hawai'i, Hawai'i
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> C. Senior Engineer.This project was a 10-mile new alignment bypass of the old Saddle Road on the Big Island of
<br /> Hawaii.The project was performed for the Federal Hwy Administration,the Central Federal Lands Hwy Division,
<br /> and HDOT-Hwy Division. Responsibilities: Performed hydrologic and hydraulic analyses and recommended
<br /> drainage improvements to be included in the preliminary design plans.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Honolulu Rail Transit(East Kapolei to Aloha Stadium) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, Hawai'i 2010
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Senior Engineer. Performed hydraulic and scour analysis of the rail columns at the channel/stream crossings near
<br /> the junction of H2 and Farrington Hwy and near the intersection of Kualakai Pkwy and Hoomohala Ave.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lone Mountain/Beltway Detention Basins and Gowan Beltway Chnl PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Clark County, Nevada 2008
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Senior Engineer. Project consisted of 600 acre-feet dual detention basins connected by a balance conduit with a
<br /> dual level of outfall flow control and a number of inflow storm drains and channels, including a 2-mile inflow
<br /> e.
<br /> channel that conveys up to 3800 cfs. Responsibilities: Performed hydrologic analyses for a drainage area over 10
<br /> sq. mi.; coordinated with another engineering firm in reconciling the hydrology of the project with the Las Vegas
<br /> Valley 2008 Master Plan Update; performed hydraulic analyses and design of drainage facilities, including dual
<br /> detention basins, emergency spillways, balance conduit, dual level outfall orifices, stepped spillway channels,
<br /> inflow storm drains and channels with energy dissipaters; prepared design report; QA/QC of plans and specs.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Gowan Outfall Lone Mountain Branch—Rancho to Decatur PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Las Vegas, Nevada 2008
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm
<br /> Senior Engineer. Project was a 2.2-mile storm drain system that consisted of RCBs ranging from 6-ft X 6-ft to 14-ft
<br /> f.
<br /> X 7-ft and conveyed up to 1600 cfs. Responsibilities: Performed hydraulic analyses and design of 2.2-mile RCB
<br /> storm drain system that included the mainline, laterals, and drop inlets; provided QA/QC review of drawings and
<br /> plans; prepared 30%, 70%, 90%, and final hydraulic design reports; identified and resolved utility conflicts;
<br /> coordinated with City of Las Vegas, Clark County Regional Flood Control, and Nevada Dept. of Transportation.
<br /> STANDARD FORM 330( REV. 7/2021) PAGE 1
<br />
|