My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-30 PL-INT-2025-010897 Stantec Consulting Services Inc. - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-30 PL-INT-2025-010897 Stantec Consulting Services Inc. - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 9:03:25 AM
Creation date
7/1/2025 10:48:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br /> NAVFAC Pacific, EA for the Home Basing of the MQ-9 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Unmanned Aerial Vehicle Squadron and KC-130J Marine 2022 N/A <br /> Aerial Refueler Transport Squadron at Marine Corps Base <br /> HI, (Kaneohe Bay, Oahu, HI) <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm <br /> d. Scope: Supported Project Manager to plan and execute tasks with a multidisciplinary team of 21 analysts, <br /> SMEs, and support personnel. Spearheaded front-end project planning, resource analyst coordination, and <br /> project management planning to organize and keep this high-priority project on schedule. Acted as the local <br /> representative in internal and external meetings including resource specific development meetings, and for <br /> public participation planning and implementation. •Size: N/A•Cost: $878K • Role: Senior NEPA <br /> Planner/Deputy Project Manager <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> NAVFAC Pacific, Biological and Benthic Habitat Survey in PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Support of STOP and INRMP for Pearl Harbor(Oahu, HI) 2023 N/A <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm <br /> Scope: Led project team and managed all project aspects including health and safety planning, adherence to <br /> scope, budget and schedule monitoring and reporting. The bulk of the effort involved oversight of <br /> e. subcontractors conducting intensive field work during the height of the COVID-19 pandemic. Addressed <br /> scheduling, logistical, and administrative requirements to safely conduct the project and adhere to protocols. <br /> Provided senior review of all deliverables and ensured that the subcontractor work product met the <br /> requirements. Was responsive to periodic quick-turn taskers throughout the project to support NAVFAC on <br /> interim status, data, and findings to support related NAVFAC planning and engineering needs. • Size: N/A• <br /> Cost: $2.1 M • Role: Project Manager/Environmental Planner <br /> STANDARD FORM 330(REV.7/2021)PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.