My WebLink
|
Help
|
About
|
Sign Out
Home
2025-05-31 Filed Corrected Petition (PL-BOA-2025-000119) and Submitted New Petition (PL-BOA-2025-000121)
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Past Hearings
>
PL-BOA-2025-000119 Rohr (PD)
>
2025-05-31 Filed Corrected Petition (PL-BOA-2025-000119) and Submitted New Petition (PL-BOA-2025-000121)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 8:03:49 AM
Creation date
6/3/2025 1:11:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 11, 2025 <br /> Specifically: <br /> 1. Under Planning Commission Rule 9-4(i)(2), the term"development"does not include: <br /> o (A) Construction or reconstruction of a single-family residence less than 7,500 <br /> square feet in floor area, not situated on a shoreline parcel or one affected by <br /> waves, storm surges, high tide, or shoreline erosion, and not part of a larger <br /> development. <br /> o (F) Repair, maintenance, or interior alterations to existing structures or uses. <br /> o (0) Structural and non-structural improvements to existing single-family <br /> residences, where otherwise permissible. <br /> 2. Similarly,under HRS §205A-22(2), "development" does not include: <br /> o (A) Construction or reconstruction of a single-family residence less than 7,500 <br /> square feet, not located on a shoreline parcel or one impacted by coastal hazards, <br /> and not part of a larger development. <br /> o (F) Repair, maintenance, or interior alterations to existing structures. <br /> o (N) Structural and non-structural improvements to existing single-family <br /> residences, where otherwise permissible. <br /> Based on these provisions, your project qualifies as an exempt action under County Planning <br /> Commission Rule 9. Therefore, an SMA permit is not required, and application PL-SAA-2025- <br /> 000280 is no longer necessary. We are returning your application and will be processing a refund <br /> of your application fee. <br /> As part of the building permit application process, Planning staff will review and complete a <br /> SMA short form to complete the SMA review. <br /> If you have any questions, please feel free to contact Alukahe Kala of this department at (808) <br /> 961-8170 or via email at Alukahe.Kala@hawaiicounty.gov. <br /> Sincerely, <br /> c7ef@e y W. Dan-ow <br /> Jeffrey Darrow(Apr 11,2025 14:46 HST) <br /> JEFFREY W. DARROW <br /> Planning Director <br /> AK:rms <br /> P:\wpwin60\czm\letters\2025\pl-saa-2025-000280 return app no sma needed--ver-2.doc <br /> cc via email: Planning Fiscal <br /> EXHIBIT A, pg. 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.