My WebLink
|
Help
|
About
|
Sign Out
Home
2025-05-31 PL-BOA-2025-000121 Corrected Petition
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Past Hearings
>
PL-BOA-2025-000121 Rohr (DPW)
>
2025-05-31 PL-BOA-2025-000121 Corrected Petition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2025 10:11:31 AM
Creation date
6/2/2025 10:11:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A, pg. 1 of 1 <br /> ..... :9s,V4i.k.e.'1,* BUILDING PERMIT <br /> rFOFNP� <br /> BUILDING DIVISION <br /> DEPARTMENT OF PUBLIC WORKS <br /> COUNTY OF HAWAI'I <br /> A PERMIT HAS BEEN ISSUED FOR THE PERFORMANCE OF CERTAIN BUILDING, ELECTRICAL, AND/OR <br /> PLUMBING WORK IN ACCORDANCE WITH ALL COUNTY AND STATE LAWS AS FOLLOWS: <br /> PERMIT NO. PW.B2024-005123 DATE ISSUED 4/1/2025 EXPIRATION DATE 4/1/2031 <br /> TMK 2-1-018-013-0000 LOCATION 14 OEOE ST; HI <br /> OWNER/TENANT <br /> BUILDING CONTRACTOR Owner-Builder <br /> ELECTRICAL CONTRACTOR(S) NOT SPECIFIED <br /> PLUMBING CONTRACTOR(S) NOT SPECIFIED <br /> NOTICE TO BUILDERS <br /> THIS NOTICE MUST BE POSTED IN A CONSPICUOUS PLACE ON THE SITE DURING THE PROGRESS OF WORK AS REQUIRED BY LAW. <br /> FAILURE TO COMPLY WILL RESULT IN A$100 PERMIT PLACARD POSTING FINE <br /> Requests for permit deadline extensions shall be submitted in writing to the authority having jurisdiction at least thirty days prior to the permit expiration <br /> date and an acknowledgement by the authority having jurisdiction will be sent upon receipt." <br /> Hawaii County Code Section 5-5-5(b) <br /> Please notify the inspector at least 48 hours prior to each desired inspection. <br /> (A FEE OF$100 PER INSPECTION MAY BE ASSESSED WHEN THE REQUESTED PHASE OF CONSTRUCTION IS NOT COMPLETE OR READY) <br /> 1. FOUNDATION INSPECTION-Termite treatment certificate.After footing excavations are complete and required reinforcing steel forms are in place. <br /> After all in-slab or under-floor ancillary items are in place. <br /> 2. FRAME INSPECTION-After the roof,all framing,fire blocking,bracing,and metal connectors are in place;all pipes,chimneys and vents are completed; <br /> and the rough electrical,plumbing or mechanical installations are approved. <br /> 3. INSULATION INSPECTION-(as required)After framing inspection and before the lathing inspection. <br /> 4. LATHING INSPECTION-(as required)After all lathing and gypsum board,interior and exterior,in construction required to be fire-resistive is in place but <br /> before gypsum board joints and fasteners are taped and finished. <br /> 5. FINAL INSPECTION-After finish grading and the building is completed and ready for occupancy. <br /> 6. In addition to the required inspections specificed above,the Building Official may require other inspections to ascertain compliance with the applicable <br /> building regulations. <br /> ELECTRICAL INSPECTIONS-Required for all electrical phases of work as declared.Inspection must be requested by the electrician licensed per HRS 448E. <br /> Reference Article 8."Inspections"of Hawaii County Code Chapter 5. <br /> PLUMBING INSPECTIONS-Required for all plumbing phases of work as declared.Inspection must be requested by the plumber licensed per HRS 448E. <br /> Reference Article 8."Inspections"of Hawaii County Code Chapter 5. <br /> HILO: (808) 961-8331 KONA: (808) 323-4720 <br /> HAWAII COUNTY IS AN EQUAL OPPORTUNITY PROVIDER AND EMPLOYER <br />
The URL can be used to link to this page
Your browser does not support the video tag.