HomeMy WebLinkAbout2025-06-20 PL-BOA-2025-000121 Record on Appeal DeVera, Ashley
From: Lactaoen, Kawehilani S
Sent: Friday, June 20, 2025 9:22 AM
To: Planning Board of Appeals
Cc: Claudia Rohr; richard.standke@gmail.com; Azevedo, Neil; Spielman, Aaron;
SalasFerguson, Sinclair; Wan, Sylvia A; Holzman-Escareno, Juliana; Sonomura, Julann;
Agustin, Noah; fraukepi5@gmail.com
Subject: Claudia Rohr v. County of Hawaii Dept of Public Works (PL-BOA-2025-000121)
Attachments: Record on Appeal.pdf
Aloha
Please find attached Record on Appeal for further processing.
Mu/a y&with /llegha O
G. factzeevv
?egal 7echvticiavvI to
Ginclain,Galas,-9encitoe+2, Veputyi Csvzpsvzation,C.ounoel
V emeta,CG, fametti, tleputyi Csvzpsvzation,counoe1
/,eavvle. Campbell, Vetzutp Csvzpsvzation,Counael
NLuznak E. 67.ckee, tletzutyi Csvzps'tatievv Counael
Caunt[p otyKaufa( v
(Vice o.the Cep Counael
101 llumini,5t., Suite 325
-Kilo, -Kawau'i 96720
Phone:(808)961-8251
9a (808)961-8622
Email:Kauwehilanig.factaoell&hawaiicountip.amk
Conlidenticdityi f2otice: 7hi e-mail message, includMg amp , isl64g4 the ao-le use o15 the intended
zecipient(a)and ma*contain,confidential and/o-vivzivilc,ciect inpyanation,. /lvup zeview, uae, diacloacute, 6,4,
diabubutio#v by unintended zecipienta is‘trughibilect.It you ane net the intended zecipient,please contact the
aendely byi zepl p e-mail and deatw p all copiea 6215,the oniginat message. Thank yew.
1
RENEE N,C, SCHOEN 5936
Corporation Counsel
SINCLAIR SAL 9398
Deputy Corporation Counsel
Office of the Corporation Counsel
County of Ilawai
101 Aupuni Street, Suite 325
Hilo, Hawaii 96720
Telephone: (808) 96 I-8251
Facsimile: (808) 961 8622
1;1.11c.a.;r.sa.as. rgu,sollilirhoo,v1Litiel.,cnoy,go,/
Attorneys for Appellee,
DEPARTMENT OF PUBLIC WORKS,
COUNTY OF 11 IAWAPI
BEFORE THE BOARD OF APPEALS
COUNTY OF HAWAH
STATE OF HAWAII
CLAUDIA ROHR, CASE NO.: PL.-I:OA-2025-0000121
Appellant,
vs. RECORD ON APPEAL;
CERTIFICATE OF SERVICE
DEPARTMENT OF PUBLIC WORKS,
COUNTY OF HAWAP
Appellee,
and
RICHARD ,STANDKE, DEBORAH
STANDKE,
Land OWIters.
RECORD ON APPEAL
Appellee DEPARTMENT OF PUBLIC WORKS, COUNTY OF HAWAII ("Public
Works"), by and through its attorney, Sinclair Salas-Ferguson, Deputy Corporation Counsel,
hereby ,submits Public Works' record on appeal for the above-captioned matter.
A. RECORD ON APPEAL
Pursuant to Board of Appeals Rules 3-13(h) and 1 3(21), the following documents are
directly related to the decision that is being appealed:
1. This Property Owner Declaration Form was submitted on December 17, 2024, along
with the application for building permit PW,B2024-0051123: the Declaration states
that ichard Standke and Deborah Standke (collectively “Standke") are the owners of
-FMK (3)-2-2018-013,
2, The drawings and plans submitted by Standke as part of their application for building
permit PW,B2024-005123 ("Project"), This document shows that on January 13,
2025, the Planning Department determined the Project to be exempt from any further
Special Management Alrea requirements.
3. This is Planning Department's Short Form Assessment/Exemption Determination for
Non-Shoreline Parcels for the Project, which shows that on January 13, 2025, the
Planning Department detei Mined the Project to be exempt from any further Special
Management Area requirements.
4. 'fhis is the lIroject Declaration for the Project, where Richard Standke certifies that
the Project is "Owner-Builder." This document was submitted to Public Works on
April 1, 2025.
5. A copy of building permit PW.B2024-1005123, which was issued to Standke on April
1, 2025.
NEIL AZEVEDO, Acting Director,
Department of Public Works,
County of Hawaii. Appellee
By: /s/ Sinclair Salas-Feruson
SINCLAIR SALAS-FERGUSON
Deputy Corporation Counsel
Attorney for Public Works
v3 2/16/2022
•
44.4
igintrit Of Atrium
DEPARTMENT OF PUBLIC WORKS
PROPERTY OWNER DECLARATION FORM
INSTRUCTIONS
COMPLETE THE SECTIONS BELOW. AN EMAIL ADDRESS IS REQUIRED FOR ALL CONTACTS ALL
COMMUNICATION REGARDING YOUR APPLICATION WILL BE EMAILED,
LOCATION INFOR TION
(VERIFY AT: www.hawaUpcperty.ax :orr/s*aich..htr!n
PARCEL.NUMBER 3-2-1 018-013
LOCATION ADDRESS ,t,ttOeoe Street Hilo HI
PROPERTY OWNER 11"\41 ORMATION (Owner contact in for »ation i required)
(VERIFY AT: www.haway vprovi tytoix corniscarch
IF PROPERTY OWNER(S)NAMED BELOW DOES/DO NOT MATCH THE COUNTY'S REAL PROPERTY TAX
OFFICE RECORD, PLEASE SUBMIT A COPY OF THE CURRENT OWNER'S PROOF OF OWNERSHIP.
OWNER NAME Richard M Standke
MAILING ADDRESS
PHONE NUMBER
EMAIL 11111MMIME
OWNER NAME Deborah A P Standke
MAILING ADDRESS
PHONE NUMBER
EMAIL
OWNER NAME
MAILING ADDRESS
PHONE NUMBER
EMAIL
LESSEE/TENANT NF RMA1II'N
LESSEE/TENANT NAME A
MAILING ADDRESS
PHONE NUMBER
EMAIL
LESSEE/TENANT NAME
MAILING ADDRESS
PHONE NUMBER
EMAIL
Document 1 - Pg 1 of 2
Hawai'i County is an equal opportunity provider and employer
I.
I EP T ENT OF PUBLIC 'S
ADDITIONAL CO0 ,TACT INFOR0 ",0 0 I
ILII,,on°
AGENT NA E
_
AILING ADDRESS ....
PHONE NU BER
E AIL
AGENTNA E _�.rr.�,.����� .� e� .. � ........�.�. ....�. ................ _�
AILING ADDRESS
PHONENU BER._w................. �_ ........ ....�....._�..... ...�,,�...._____�
E AIL
I hereby certify that I am the owner of the property listed above and all information provided is accurate
and complete.I understand that all contacts listed above will receive communication regarding my permit
application and plans.
CHECK THE BOX IF tir
PROPERTY OWNER
INFORMATION ABOVE
MATCHES RPT'S DATA.
If no,proof of ownership is
Richard Standke/Deborah Standke required.Verify at:
�.. PROPERTY (PRINT)OWNER imm °
�aa �I��: ��wu :�aa:�m xccffirn
..� ..
2-04-2024
PROPERTY OWNER(SIGNATURE) Date
Document 1 - Pg 2 of 2
Hawai`i County is an equal opportunity provider and employer
.',.
di
11 IHir11,1111 lit Frolit 11!1
!I it 1 wail ti i if, il II ut ill 1 ,4 l
1 't l I i 1 ll l 111,11,111itgaull III 01 til 1 th,, I, '
F,;,.. !,' . 1 ,,,a,„ ., 0,ii rii,4 lallA Iglu li 1 ili 1,,,,IRILI I gill-tik IF 1,9 i
1)111: p;ItliN ir will, /,,m1,7 ti I 111141 , 11 41 11 ,
i i ' 1 i 1 i, la'
1
1 ,g . f , 11 l,,L 1
i a !'„ 1,, ,,, 1411 Ibil 1 I I i 1,111i il 1 I 1.11 ii Vg"I'
11 11111
IMI1 1r: i aai''':777:77-0,.
I lb / idl m I iltil,F,t,1P
i i t 11 1 11,i11113 1111
.,.
-,-„„, „,
f. A 17 - r ,!..:,. ag•a,> ,,',),
, . a'a 111-
.g ,:•-••,:. :1,, 1,,
1,S. j....x 1,r. t
Fit
.';, 4," ll 'r•f. ,,,,, ,„,,u ,p ,,i,,,
,,,,,,,, r,ga'aaa7,• .,,,,13„,4,::,.,„,„..ia„„k ...,,,..„...„..r.„,„
11 3i a 1
; I''' I 1i, x.11 h'''',';,F i'-', ' ' ' ''".' a 'a,'a,,••.', a" ''',,1 ".p 11:1 01 'a''';',.‘..,`'Z c''',',k '> dri
,E.,;1;.:77."'";,,ilr'''''''''
,,....l." 11
II Ulll 'qq ' i', II i'll' '1',1,111'
r..
H ,
v 3 I .11 F
R. ll
'i
.,1,
ii 1
,i i i i;;..1! ,3
I.
.'1 ,,,o'
1 1r, 1,,: —..,t,'
,, ,, , ,..,,,111 1 ,, 1
:,, i' '''t .." '
1 g "'
-"'
d. „. 1
9 11!°' '• 'lltail g,la 6' it
'1 .,,,E.'111,1ittif13311j1
11111,1„, '11 73 ,* ifi1 111 .10,111011i, if3..1
11 ggv VI
03 1
1 #gi III 1.VP T,
V V V g'g ggg i!g 1 1(:r I i ifa,cao,nr,?Na 5"11AlillIllIE . '‘.1,
0 ....1 ' ., •
I .9..: '" - ., . 1,7,,, 1 4 ,,,„4.,,,- 1, , ...,.. ,,,. ............... .......................„ i
DOCUMENT 2 - PG 1 OF 15
.7„.,...d.,7!„z„,z,..1.,,,,,...„,...............................
! .,.
10 i
F 4 .
. .
Fg. ',.,.. l'''''''""""t. '''''''''''" t• T '‘‘,„,
•„.',,,,„ '.d
'1 1
, .:,...............
, r' lc,
ji
io
d Irillo ,
33,
. g333 g
g1 3.........................................................
1 ....; ,
III'
115,Itillii „I: 6:
I„ILI„II,III ..
3g 1 "33
If 1,I;1,14 ,., 31,1 IN,,,vg „! Iti ill .3 • .1 1 ; '"" 1 1 Ilk
„-„,........„.„--
.
e f 144 Fnlr, r,,iiiiri ,0,10. oil
1 5 :55101,!!!!!!""'"'"'"'"'"'"°, " .L.,,, I ..............,.. .........,.....
11 III;INI I'IIII„dID
,.................
q'r, ggili ,1„.n-4
R004.0.,NR0 04.s LA!!!!!um,k 1„III: IIIIIi.
I IIII
DOCUMENT 2 - PG 2 OF 15
....,.
i=-f-
kz..,-,...7
7:4'
k 10,777Paapt =111 It1 c, t„. 100,
ir
F1 I
;'11
i t
i r0. Itt t 4. 00'.00 -----4"" : ..... ,,,, „,..7-1-:„ -r . :-
..
,, , ,,,z.
, , '..1— 1 ,,,, / \
11 ..„,
w
,,..7 .,Ir.,.0,00041 i 4,
c.../..— „, r
., ,.. .„ ...
„..„
. \
r1t,,a7,h,
g.
..,...,
1:4 -- .
I
, \„,
11
e. 000 141 //1-31 0 401 0,
ft/t11
,, r
/
P/ /";''' / ''''
6,
„._,,,,,Iii,.
1
\ \ '.'" / ---------- 7.,_
/, \'',/ A
, 1.1\ F
,F.„„„„_..,F,FF., , 1 \ TI F,F, i 0t/ r,' ,..,72 / ... /),..,
, \ -9..,:,
b /I / / ( / \ - ...,.
/ .,..,,. ', • ?
....
{ , ,. .i 'j
, ,..
/ d I! ' i'/j / /
,-- V
f?I eft0„: \
_9949
4,4 ,.,
, 9
J. .
5, IN
co
l, %
'1131,
MPPi lc
WO pt121;,,.,
IP i ,iiivg ,,,I
q1,1 i ,p14 2
;*AM.I 4t1 At
i
UNDO ,4 44 03 rot vom;40/44,,° RICHARD M S' '' r/
x%
DOCUMENT 2 - PG 3 OF 15
II
"-in ff 575
5 f t if.1r if If vi,'fit: 1 k
Of"rf"V tVII[rt" 55"tf rii 55 „5/T00t „ ttn k tk'ntt .00 .0" t rkrt t , .0'nr n° 000
000,
r--
:1111::,,,1,'s 1"11, .1%1111., il •,,!,Hi,:!, ; ?.,1',: 11t!4 1.' ' '!': '1
a t i
"tat Its, tat"'
1 tat laa aal I ,„,, xt
i If ff f !'1 "tntnn010 f IF r 000 00t trt k „00.t
00000!' i t,000k1 rt 0.,F. 0t-; 00! .0'..ttt, s 000
i t kt tf.0?.. II' 00'00 000 'tkr ttitt' : k
att. 't III tva'It — i at X " V"' "tit
t I at ',tat
t.t aIa V It tta „ ,
t I
1 I
' ' '' tat VI ,ff ffvffvfittfirtiffvf, ,,, ,
if:Et/
, , 5
f rf V„„,„frforvf Ififf'Irrrir fi,V : „ v ,
vt Iv 1
iIffroirrIffif,5
5r r 5 I r v,
,, taa rat
'It i 'J ,I t :;ItatiaalItIitIM ait ; '', ,Ilta"I a
II/ a
IV
a at .tat
,a"t ,aaa „"tt „a'a tt. attItt:IIIIiiitaittat „/ at 11
,rat 1
KaI
VI vii
'vir'rtftlt trill I frttrirrif
fI,Iff
frrriv
:f
ti,:vr
'\.
1, IN V DTOM 111I,,
i 12 ' .74,14 ull., oklllpllphi ,000l002,14,„r„. UM ' ", 'k
S 11' (1 i 14 / 91 1'"1 11#/011/R ill Pi 11 t,11,1110 i " " 101 f' •11 '11 i"1 1111 111 1 dr 0i'f:11
ri fIll 1 rrir: r ry vififvf.-50 : IIII.,,"4— ,
ktn000000A
°,00000°030 I fp1170. nt ti0, 0.00t,rrkt00030000
1 I/1 11 141. tl fi0.0 0t,041 10
kl 0. 0 0 0 t
n0.3
0 on in no; 0,01 f rt 10 10N ...
lin li ,r.01 00 0,t,, 00 tr , 003.00-00000—00'0
r 0000 000 tt 3 00,00 30000 . rt rkt 11 ,„kn._ , n ,,.;
ii
ita
at' 1 Rq ! tpliii !V!illi r„1.44V,4111!! 7!'ll '''4„,„,
, to„„ „ .„,\H „1„; 'ill l'y •14„,i,i111 1111 \ !!!!!!!!„ -!„!!!" ! - l' !!!!!,!!„,5!„.1,!!„! ,
aattatatatataxataatatat ao a ., a
a4ataa IIIIi '
, Ita 1jf
;1i 151.51$115)111 115
111111 11i, 1111, 1:111('''''
0 hll h:;0,,,, hch Illh,LIll OD
„ AIFO 110. 1(100:0 NI
lliil,I ri, q001ii u'lli'll,
11 0 'Ill:, 1100,
„„—
_
, 1101C11-11,ARCHIA S"11"kNIUKE
,';,111‘s1, „,.,„, .11. ' 1 '4'111141117m 11,1111i1;110111r12/ ' ",
1 [ 1
DOCUMENT _2PG 4 OF 15
1
,
11411; i 'Ili Ili illp 111111(i I .fil il r
1111111 1111 IP 11111 11111111 1g 1 1 ow . Id rd.. „,„ h Iprt, I di !I .
Will 1 ) st r dig 11 11 li
Mr I art P 1 lir hi' if 11 ill
NI 1 I to Ri 44 / i .. . F:
Cia ills 410 K a 0 FP
ffilltill I 1-,F ill IN ,a,ndt,, st !I
huili , icor , th.,v ,
Iti 16 III 11 III 1°41 li 1
am, , II! I 1,1 wll, I 1
.. . t a '4 /e al
41111 1 111 4 117P •°ILI 4
%lot i 2 3 2 2
P v 1
i II1F IIP Mai "1 r ° 11
li 11 li 11 11111i 111 111 Hi II Ili i i ii
1 1., ti IF ia . f 11 I
it' t I: It 111 It It Tit VI v1 !It It t .;
1 w P II 41111 II 51 2 11 pit ,A 1
1 . al faw ii.111 OR a i a, a , II
It I 111 rii iplif ,I di ID if ts. III ,k
11 L 'I 11 1111 11 11, 111 il ila ii1 1 4
I I ri 11 11 .11 1 k ill il 1
II It 11 11 at' 1 ° III If 0 3 i
4 1 1 It 'PO .1 I 1 1
II . ' L I Ili LI II Ili i 1111
, 1
II 5 2 25I If II i III ti 1.
1 ! I ILii 1?,,IN rz II, elk . 1 1 i
IN 1. 01 r r Ft 41 11
11. a
1
V "A ,.
i, . . 2 , tiall !Ti HIV
Illiii 111 li I:TAI il il 41 11 1 11 Ili! '
- II tot 1 ,ii?
n "' d41411ire Vt
qi 1 IRO pi II r3101 it wit it I i tti 1
14; 41111'111 I li: Itl iii3h 11 il b f i il To lir: 1
fi- 11w 014 11 411111 1 f ii i 1 11 11 i1a - 1
ilir .111$ 1 1 1 I 1! till ;
,i, . . 1,1 .. I. Al ,
2 i ILO 1I i i diii 1 3 11 il 111 II ith 3
Of gilt IR 1 1 t 1 1/ 14
It' Talt If 1 111 ' h 1 VI
,t1 rit, , i . . iltit It kb 1. ittl al , lil 111 .1
1'11 PI if 1 1 v• ut
li ' all 14 ak 1 I
1 iif
11
il
C4: iY,
2
g.i, '1D-:
E,
.. _
x I
J't,',',',ALu,,, ,
0 .... .
C) ....
DOCIAVIENPG 5 -OF 1 5 ......._
1211. 8:41 AM al• :blank
A A
all radii , Calculator roje e • o
Builder/Designer STACY OJANO/ ROBERT SMELKER.
Home/Building Plan Name RICHARD M STANDKE
Development Address TMK: (3)2-1-018:013
Code BASED ON 2018 IRC
SDC(Seismic Design Category) D2
Wind Speed <= 125 mph
Wind •.sure Category EXPOSURE D
Total Number of Stories 2 STORY p II
Cripple Wall NO
Mean Roof Height less than 30 ft YES
Des'Oner Responsibilities:
• Check irregularitO.s per 1R.0 sectbn R301.2.2.6
• Confirm bad path to foundatbn per IRC sectbn R403.1.6
8 Design foundatbns per IRC sectbn R403.1
® 1ncbde interbr braced wall ine foundatbns per IRC Sectbn R602.11
• Deskgn cripple walb in one of two ways
o Redesignate as the first story and use the calculator O. S4f
o Design by hand per IRC Sectbn R602.10.10. THIS WORK ;I: •REPARED BY ME
r OR UNDE' ,Ar SUPERVISION AND
patorICEEss- iD CONST 4 jr i/ra N OF THIS PROJECT
toyEG.T * WILL Br74TER MY OBSERVATION.
STORY 1 STORY 2
A B A
14 xplres: 4/30/2026
DOCUMENT 2 - PG 6 OF 15
12/10124,8:441 AM a •ithlank
P;1 ALL LINE ELEVATION VIE`'' P . : 4 51 ;
I
it I)
1°
i IIr
Bi B2
'Total Wall Line Length: 12' 01
WALL LINE PLAN VIEW
B1 B2
Story Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Line Method Factors Amount Factors Amount Bracing Bracing Status
1st Story A PF-H 1.29 11.29 1.05 6.93 11.29 8 Non Compliant
Furthest Distance to Adjacent BWL 20' 0" Stone or Masonry Veneer Omitted
Roof Eave to Ridge Height 5 feet Wall Dead Load > 8 psf but <= 15 psf
Wall Line Length 12' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Adjacent
Wall Line Wail Story Bracing Segment Opening Qualified Nails Tension Hold Down
Segment Height Height Method Length Height Segment Tie
B1 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
B2 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a min. 1,000Ib HD to restrain the
post on that side.
(:blank 2/10
DOCUMENT 2 - PG 7 OF 15
12/16/24.8.A1 AM a iut:blank
ALL LIINE IFLEVA..I"ION VIE ,,, ,l l • ! 2,4 ' 512 1
r
1
,
x,1
B1 B2
1Total Wall Line Length: 12' 0"
WALL LINE PLAN VIEW
B1 82
Story Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Line Method Factors Amount Factors Amount Bracing Bracing Status
1st Story B PF-H 1.36 11.9 1.05 6.93 11.9 8 Non Compliant
Furthest Distance to Adjacent BWL 20' 0" Stone or Masonry Veneer Omitted
Roof Eave to Ridge Height 5 feet Wail Dead Load > 8 psf but <= 15 psf
Wall Line Length 12' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Wall Line Wall Story Bracing Segment Adjacent Qualified Tension
Segment Height Height Method Length Opening Segment Nails Tie Hold Down
g g g g Height g
B1 8' 9' PF-H 2' 0" 7' 0" 4 373" grid DR 3,500
B2 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a rain. 1,000lb HD to restrain the
post on that side.
a„ ,:blank DOCUMENT 2 - PG 8 OF 15 311
12/16/24,8:41 . a.. :blank
ALL LINE ELEVATION VIEW pw,, 2. 11.'112 ..u,11 ......m om,
51 23
1
, 4
Si B2 83
ITotalikall Line Length: 20 0"
WALL LINE PLAN VIEW
Bi 82 B3
Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Story Line Method Factors Amount Factors Amount Bracing Bracing Status
1st Story 1 PF-H 1.29 7.16 1.05 11.55 11.55 12 Compliant
Furthest Distance to Adjacent BWL 12' 0" Stone or Masonry Veneer Omitted
Roof Eave to Ridge Height 5 feet Wall Dead Load > 8 psf but <= 15 psf
Wail Line Length 20' OH Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Adjacent
Wall Line Wail Story Bracing Segment Qualified T n ensio
Opening Nails Hold Down
Segment Height Height Method Length Segment Tie
Height
B1 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
82 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
B3 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD Is not Included on the
other side of an opening, the side with no PF-HD needs to show the detail for a min. 1,000lb HD to restrain the
post on that side.
a.. :blank DOCUMENT 2 - PG 9 OF 15 co
12/18124,8:41 AM about:blank
WALL LINE ELEVATIONP VIEW 1 ��w
11
1, ,,l
Bi B2 B3
I
Total wall Line Length: 20' 0" I
WALL LINE PLAN VIEW
Bi B2 B3
Story Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Line Method Factors Amount Factors Amount Bracing Bracing Status
1st Story 2 PF-H 1.29 7.16 1.05 11.55 11.55 12 Compliant
Furthest Distance to Adjacent BWL 12' 0" Stone or Masonry Veneer Omitted
Roof Ease to Ridge Height 5 feet Wall Dead Load > 8 psf but C= 15 psf
Wall Line Length 20' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Adjacent
Wall Line Wall Story Bracing Segment opening Qualified Nails Tension Hold Down
Segment Height Height Method Length Height Segment Tie
B1 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
B2 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
B3 8' 9' PF-H 2' 0" 7' 0" 4 3"/3" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a min. 1,000lb HD to restrain the
post on that side.
;-:Wank DOCUMENT 2 - PG 10 OF 15 „O
12/15124,;:41AM a+•astliank
ALL LINE ELEVATION VIE " .B20 4-0051 3
Bi B2
Total Wall Line Length: 12' °PI
WALL LINE PLAN VIEW
B1 B2
Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Story Line Method Factors Amount Factors Amount Bracing Bracing Status
2nd Story A PF-H 1.05 4.73 1.05 3.15 4.73 8 Compliant
Furthest Distance to Adjacent BWL 20' 0" Stone or Masonry Veneer Omitted
Roof Eave to Ridge Height 5 feet Wall Dead Load > 8 psf but <= 15 psf
Wall Line Length 12' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Wall Line Wall Story Bracing Segment Adjacentg Qualified Nails Tension Hold Down
Segment Height Height Method Length Height Segment Tie
B1 9' 10' PF-H 2' 0" 8' 0" 4 3"/3" grid DR 3,500
B2 9' 10' PF-H 2' 0" 8' 0" 4 373" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a rrin. 1,000lb HD to restrain the
post on that side.
DOCUMENT 2 - PG 11 OF 15
a,. :blank
12/16124,8:41 AM about:blank
WALL LINE ELEVATION VIEW I A, I
,lir
II 1
f
B1 B2
Frota1.16taILLiae_Lensabi.12D21
WALL LINE PLAN VIEW
B1 62
Story Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Line Method Factors Amount Factors Amount Bracing Bracing Status
2nd Story B PF-H 1.05 4.73 1.05 3.15 4.73 8 Compliant
Furthest Distance to Adjacent BWL 20' 0" Stone or Masonry Veneer Omitted
Roof Eave to Ridge Height 5 feet Wall Dead Load > 8 psf but <= 15 psf
Wall Line Length 12' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Wall Line Wall Story Bracing Segment Adjacent Qualified Tension
Segment Height Height Method Length Opening Height Segment Nails Tie Hold Down
B1 9' 10' PF-H 2' 0" 8' 0" 4 3"/3" grid DR 3,500
B2 9' 10' PF-H 2' 0" 8' 0" 4 373" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a min. 1,000lb HD to restrain the
post on that side.
about:blank DOCUMENT 2 - PG 12 OF 15
1 11 24,8:41 1 :blank
WALL LINE ELEVATION VIE, `,I l I32 ,4—O 15 II 2
t�
o
oi
" f
Bi B2
ITotal WadWpt Length: 20' 0"
WALL LINE PLAN VIEW
B1 B2
Story Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing.
Line Method Factors Amount Factors Amount Bracing Bracing Status
2nd Story 1 PF-H 1.05 3.04 1.05 5.25 5.25 8 Compliant
Furthest Distance to Adjacent BWL 12' 0" Stone or Masonry Veneer Omitted
Roof Ease to Ridge Height 5 feet Wall Dead Load > 8 psf but <= 15 psf
Wall Line Length 20' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Adjacent
Wail Line Wall Story Bracing Segment Opening Qualified Nails Tension Hold Down
Segment Height Height Method Length Height Segment Tie
Bl 9' 10' PF-H 2' 0" 8' 0" 4 3"/3" grid DR 3,500
B2 9' 10' PF-H 2' 0" 8' 0" 4 3"/3" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a min. 1,000lb HD to restrain the
post on that side.
;.._blank DOCUMENT 2 - PG 13 OF 15 Bilo
i 2/16/240 •:41 •++utbl ank
WALL LINE ELEVATION VIIFs�
;o
i,
i
B1 B2
I Total Wall Line Length:_20' 0"
WALL LINE PLAN VIEW
B1 B2
Story Wall Bracing Wind Wind Bracing Seismic Seismic Bracing Required Qualified Bracing
Line Method Factors Amount Factors Amount Bracing Bracing Status
2nd Story 2 PF-H 1.05 3.04 1.05 5.25 5.25 8 CorrpHank
Furthest Distance to Adjacent BWL 12' 0" Stone or Masonry Veneer Omitted
Roof Eave to Ridge Height 5 feet Wail Dead Load > 8 psf but <= 15 psf
Wall Line Length 20' 0" Roof/Ceiling Dead Loads 20 psf
Gypsum Included
Blocking Included
Wall Line Wall Story Bracing Segment Adjacent Qualified Tension
Segment Height Height Method Length Opening Segment Nails Tie Hold Down
g g Height g
B1 9' 10' PF-H 2' 0" 8' 0" 4 3"/3" grid DR 3,500
B2 9' 10' PF-H 2' 0" 8' 0" 4 3"/3" grid DR 3,500
Include proper PF or ABW details on the plans. If a PF-HD is used, and a second PF-HD is not included on the
other side of an opening, the side with no PF-HD needs to show the detail for a min. 1,000lb HD to restrain the
post on that side.
DOCUMENT 2 - PG 14 OF 15
a.• :blank iOi
12/16124,8:41 AM about:blank
RICH, *D STANDKE TMK: (3)2-1-018:013 B, ED ON 2018 IRC
APA Wa Bracing Cahibtor v2.7.0
APA Makes No Warranties of Any Kind
All Informadon in the Idol Is provided as Is",with no guarantee of compleWnt4s,accuracy,dirielin,- or of the r=4. Its obtahwi from the use of this information,and
without warranty of any kind,expr4, or Implied,including,but not lim4:4 to warranties of performance,merchantability and net for a particular purposeYou
can find the full terms and conditions for use here: •blipsoliwww.apawood.orgiapa-waii-bracing-calculator-disclaimer
Iwo
• —. I
10t10
a.• :blank DOCUMENT 2 - PG 15 OF 15
Mitchell D. Roth 0#1.1 444. Zendo Kern
Mayor 2 4,6170 Director
* .44
Lee E. Lord Jeffrey W.Darrow
Managing Director Deputy Director
West Elawari Office East Ilawal'i Office
74-5044 Ane Keohokalole 11.).y 101 Pauahi Street,Suite 3
Kailua-Kona,Ilawei 96740 County of Hawaii Hawaei 96720
Phone(808)323-4770 Phone(808)961-8288
Fax(808)327-3563 PLANNING DEPARTMENT Fax(808)961-8742
SPECIAL MANAGEMENT AREA (SMA)
SHORT FORM ASSESSMENT/EXEMPTION DETERMINATION FOR NON-SHORELINE PARCELS
Submittal Date: 01/13/2025 Application #: PW.B2024-005 1 23
Tax Map Key: 210180130000 El BP 0 Variance 0 Subdivision 0 Other:
Landowner: STANDKE,RICHARD M(Fee Owner) Applicant: Mary Adkins
Phone: Bus.: Hm./Cell: 1111111111.. Email:1111111111111111
Description of Proposed Use or Improvements: (1-PERMIT) PROPOSED ATTACHED LOWER-LEVEL LANAI, &
ENCLOSED INTERIOR STAIR CASE& CLOSET. UPPER-LEVEL NEW DECK ADDITION.
Description of known historical sites,anchialine ponds,wetland,or sandy beach & any other pertinent information:
l A plot plan of the property, drawn to scale, with all proposed and existing structures shown thereon. In the case of a
SFD, BP application may suffice as the SFA plot plan.
Nature of Development/Activity:
O 1. Repair or maintenance of roads and highways within existing rights-of-way;
O 2. Temporary events limited to 96 hours including set up and take down, such as community events, sporting events,
fund raisers, food events and family celebrations not involving any ground disturbance or installation of permanent
structures.
O 3. Construction or reconstruction of a single-family residence, including accessory structures, on land that does not abut
the shoreline and that does not exceed seven thousand five hundred (7,500) square feet of floor area, and is not part
of a larger development(e.g. `Ohana Dwelling)
O 4. Demolition or removal of structures on land that does not abut the shoreline, except those structures located on any
historic site as designated in national or state registers.
O 5. Structural and non-structural interior and exterior repairs, maintenance, renovations, and alterations to existing,
lawfully established structures that do not increase the gross floor area and do not involve any additional ground
disturbance, such as installation of roof mounted photovoltaic and solar panels, solar water heating systems, roof
repairs or replacement, window and door repairs or replacement and similar improvements.
O 6. Structural enclosures of lawfully established structures within the existing roof line and foundation for decks, lanais,
carports, garages, and similar accessory purposes.
fig 7. Other: Addition/Alteration to existing dwelling of a lanai.
DOCUMENT 3 - PG 1 OF 2
,,,,L,0,1,),Ily.inititiuglgry,,inlgsngth Ilerwalr(molly is an Equal Oppornmiey Provider and Employer
SMA Short Form Assessment- Page 2 of 2
ADDITIONAL INFORMATION & DETERMINATION
SLU U Note: Properties Located in Puako, Waawaa, Kapoho Vacationiand
and Kapoho Beach Lots require an SMA Assessment.
ZONING RS-15
Existing SMA Permits EINo 0Yes Warning Flag EN° 0Yes
Historic District/Sites RIM 0Yes View Plane from Hwy EdNo 0Yes
Trails No 0Yes Drainageways/Streams No 0Yes
Critical Habitat No 0Yes
If'yes' to any of the above, please review with an SMA planner prior to approval of exemption.
Note: The Director may require a full SMAA if it is determined through the short form assessment review that further
information is needed from the applicant. The Director may impose certain conditions with the exemption determination to
assure that the proposed use,activity,or operation does not have a significant adverse effect on the SMA.
RI Exempt 0 SMAA Needed 0 Covered Under Existing SMA Permit No.
SFA #: PL-SFA-2025-000433 Name: Bonnie Okamoto Date:
STANDARD CONDITIONS OF APPROVAL AND ACKNOWLEDGEMENT
The items checked on Page 1 are hereby considered exempt from the definition of"Development" pursuant to
HRS §205A-22, subject to the following conditions to assure that the proposed use, activity, or operation does
not have a cumulative impact,or a significant adverse environmental or ecological effect on the SMA:
1. The applicant shall secure all necessary approvals and permits from other affected federal, state, and
county agencies as necessary to comply with all applicable laws and regulations.
2. This exemption only applies to the proposed uses activities and operations as presented on Page I, No
additional development shall be allowed within the SMA without obtaining a permit.
3. Artificial light from exterior lighting fixtures, including, but not limited to floodlights, uplights, or
spotlights used for decorative or aesthetic purposes is prohibited if the light directly illuminates, or is
directed to project across property boundaries toward the shoreline and ocean waters, except as may
otherwise be permitted pursuant to HRS §205A-71(b).
4. In the unlikely event that surface or subsurface historic resources, including human skeletal remains,
structural remains (e.g. rock walls, terraces, platforms, etc.), cultural deposits, marine shell
concentrations, sand deposits, or sink holes are identified during the demolition and/or construction work,
cease work in the immediate vicinity of the find, protect the find from additional disturbance and contact
the State Historic Preservation Division at(808)933-7651.
5. Best Management Practices regarding water quality and equipment maintenance must be strictly adhered
to during all phases of construction to ensure that no construction or equipment runoff enters a coastal or
riparian area.
6.
DOCUMENT 3 - PG 2 OF 2
Commy N5 6171&peal Opporegmrey Provrder and Employer uthinlo,)ILILMEILLEEL
Project Declaration
TMK Project Location ApPliCation# ---
' iLL.712 fi110, ii3 14 Oeoe Street may be provided later I
,„„ ,... , —
f Project,includes: (NOTE:Electrical drawings required for residential work involving>200 Amy
Building Work
Fr lumbing Work
Valuation of Building Work ry r more i
ni bathrooms o lEle rical Work
fljj>200Arnpservice
Valuation of Plumbing Work
Valuation of Electrical Work
52 ,000
m I
L Jid) 1,009
STATEMENT ACCOMPANYING PERMIT APPLICATION PURSUANT TO CHAPTER 444,H.R.S.(RELATING TO CONTRACTORS)
(SEC 444-HRS)(Select Contractor or Owner-Builder)
„——
a CONTRACTOR
I declare that I am licensed under the provisions of Chapter 444,HRS,of the Department of Commerce&Consumer Affairs, t)
)
State of Hawaii.My license#is in full force and in effect.
1
Si tia jia,t2fIME Date '
------ --- ------n ,
NOTE:RME(Responsible Managing Employee)only to sign.Notarized authorization from RME required for designated
agents.
Building Contractor Name License# Lic.Expiration Phone#
Date
Address
RME1 Full Name RME2 Full Name
RME1 Work Phone RME].Cell Phone RME2 Work Phone RME2 Cell Phone
RME1 Email Address RME2 Email Address
„„— .„,— — _„„„„— _ — .„.,
7-
,../' OWNER-BUILDER
P — —
Section 5-1 5 Definition"Owner-builder"means owners or lessees of property who build or improve structures on their ---
---
1 property for their own use,or for use by their immediate family.This definition shall not preempt owner-builder by exemption
1 as defined by section 444-2.5,Hawaii Revised Statutes
1
1 I
I declare an exemption uncle Sec.444 2(7)for the following reasons:
1) This exemption allows me,as the owner or lessee of the property,to act as my own general contractor without
possessing a license
2) To supervise the construction myself
3) To hire licensed subcontractors
4) The building is for my personal use and not for the use or occupancy by the general public
5) Building will not be built for sale or lease within one(1)year after construction is complete.
Section 5-4 Definition"Owner-builder"means owners or lessees of property who build or improve structures on their
)
property for their own use,or for use by their immediate family.This definition shall not preempt owner builder by exemption 11
as defined by section 444-2,5,Hawaii Revised Statutes
,Ploieerty Owner ,
Owner Name
—
,
43ickoiRD 6.T AA/th<1 , ---
i la Wire
_ V
2/24/2025
Hawa VI County is an equal opportunity provider and employer
-_DOCUMENT 4 - PG 1 OF 3
TMI�....... �;;wnerNa e......_::::::::........_......— ::::::::.................... :•,,,,,,,,,,........ ............. pAlication# ,,...... ................ ::
............. ................. ..... . ....•,,,,,+..............�rv_...� 4 ..,11••••••........ 5721A1CM4 may the provide wi Q titer
Where electrical or plumbing is included,applicant must identify all phases of such work to be covered and the contractor
. .......tin the phase.Refer to back side of this form and mark all phases of electrical andjen�,luumbing work to be i
completing g p urrociudad
Lic
Lill u..., ll�wrall:iiorm Date
Contractor
Name
Work Phone Cell Phone Phase(s)
RME1RME2 .................................�..
. Full Name
........... ....... Full Name
RME1 Work Phone RME1 Cell Phone
RME2 Work Phone
�..•,,,,,,,,,,,,,,,,,,,,,,_...........................RV�dIE2....C.�r!!Phone
RME1 Email Address �.........�.........
RME2 Email Address
Signature of RME �...........�......
Date
Contractor ........................._...............................•,,,,,................
Name ............n.;e lure.Ilc;urpir•tiorro DateLich;.
Work Phone Cell Phone Phasets) .....................................•�...............—.....RME1 RME2
..........
Full Name
.........................dull Name................,•_.................�.•,,,,,,,,,,,,,,..,.........
RME1 Work Phone RME1 Cell Phone°..............................................•.,..
RME2 Work Phone RIIVIIE2 Cell Phone
RME1 Email Address ..�........ .........._. ,,,,,,,,,.•,,,,.•.._
RME2 Email Address
Signature �....................
of RME
Date
Contractor �.........................
Name liceru""e.. ......... Lic„Expiration I ate
Work Phone Cell Phone Phase(s)
RMEiRME2 .............................................................................•,,,• _.....
Full Name Full Name
RME1 Work Phone RME1 Cell Phone ..........._.R,oC......... ,rwlu Phoonn. ...............................
RME2 Work Phone � Rtiv&'E2 e
RME1 Email Address
RME2 Email Address
Signature of RME a... t
a
Contractor ........
License# Lib. Exbirabon Date
Name
Work Phone 1 Cell Phone Phase(s)
RME1 ; RME2 ...........................
Full Name
—............• ............. ,.. Full Name
RME1 Work Phone 1 RME1 Cell Phone ................... .,,, RME2 Work Phone ..................•,,,,,,,,,,,,...............;...RIMIIi2 Cell Phone
RME1 Email Address
RME2 Email Address
Signature of RME
Date
Hawaii County is an equal opportunity provider and employer
ELECTRICAL PHASES
E1 Temporary Installations _J E11 Sign Installation Connection
E2 Service Equipment HELCO i E12 Alt.Energy Installation(PV/Wind/Generator)
E3 Feeder Wiring 'D E13 Low Voltage Wiring/Audio Visual/
Data Communication/Computer Wiring
E4 Branch Circuit Wiring r
i-1 E14 Air Conditioning/Refrigeration Control Wiring
E5 Electrical Equipment Installation iD1E15 Motor Installation
./ E6 Device and Fixture Installation
E16 Street Lighting/Traffic Signal Installation
E7 Fire Alarm System ] E17 Empty Conduit Installation
E8 Swimming Pool Wiring _ E18 Site Work Utilities installation
E9 Solar Water Heater Wiring E19 As Built/Work Started Without Permits
E10 Landscape Lighting and Sprinkler Wiring gE20 Demolition Work
PLUMBING PHASES
P1 Temporary Water4 1 PSa Automatic Fire Sprinkler System(except water
I
P2 Plumbing Fixtures,Equipment P5b Water Supply for Fire Sprinkler System
Cross Contamination'
Pia Sanitary Piping System(Interior) P5c Standpipes
.......................................
P3b Sanitary Piping System(Exterior) P6a Fuel Gas Piping System and fittings
P3c Grey Water Waste System P6b Gas Appliance
Sewer Lateral Connection
I
Solar Water Heating System(Except Water
Including Interce ytors Clarifiers P7a
Pad
i Sup'pIY)
Individual Waste System
P7b Solar' Water Heater—Water Supply Y
m.
Pie Private
Interceptors,Clarifiers) PA y
HT mil
P3f Private Wastewater Treatment Plants III P8 Irrigation Sprinkler System(Cross Contamination)
1 P4a Water Distribution System(Interior) P9 Swimming Pool—Potable Water Supply,
Sanitary Drainage,Backflow
P4b Building Supply(Outside Water Piping) P10 Air Conditioning—Water Supply,
......................................... Includin _I ackflow Preventer
P4c Water Distribution Main(Subdivision,piping) 1 P11 Alt.Energy(Heat Pumps,PV Hot Water)
Pod Water Equipment—Backflow Preventer,
Pressure Regulator P12 Medical Gas System
elm
P4e Water Tank—(Pump/Filter/Water Treatment) Il P13 Gas Station Piping
P4f Non Potable Water Distribution 1 P14 As-Built
DOCUMENT 4 - PG 3 OF 3
00 ' ,04.1)f BUILDING PERMIT
BUILDING DIVISION
DEPARTMENT OF PUBLIC WORKS
COUNTY OF HAWAII
A PERMIT HAS BEEN ISSUED FOR THE PERFORMANCE OF CERTAIN BUILDING, ELECTRICAL, AND/OR
PLUMBING WORK IN ACCORDANCE WITH ALL COUNTY AND STATE LAWS AS FOLLOWS:
PERMIT NO. PW.B2024-005123 DATE ISSUED 4/1/2025 EXPIRATION DATE 4/112031
TMK 2-1-018-013-0000 LOCATION 14 OEOE ST; HI
OWNER/TENANT Deborah Standke; Richard Standke
BUILDING CONTRACTOR Owner-Builder
ELECTRICAL CONTRACTOR(S) NOT SPECIFIED
PLUMBING CONTRACTOR(S) NOT SPECIFIED
NOTICE TO BUILDERS
THIS MUS"0"BE IPOSILD I N A CONSPICUOUS PLACE ON`HIE SITE DURING TI IL PROGRESS OF WORK AS REQUIRED BY LAW.
I LURE TO COMPLY WILL RESULT IN A$100 Pt RrArr PLACARD POSING 1°0 lq.lt1
Requests Mr pound desOl me extensions shall be sob:I-lilted In writing to the authonty having prisdicurm at least II II days prior to the petunia expo-anon
date and,an acknowtedgement by the authorit ction+ail II be sou upon receipt.'
Hawaii County Code Sechion 5-5-5(b)
Please notify the inspector at least 48 hours prior toencIF desired inspection.
(A FEE OF$100 PER INSPECTION MAY BE ASSESSED WHEN THE REQUESTED PHASE OF CONSTRUCTION IS NOT COMPLETE OR READY)
1. FOUNDATION INSPECTION-Termite treatment certificate..After footing excavations are complete and required reinforcing steel forms are thplace..
After all in slab or under-floor ancillary items are in place.,
2.. FRAME INSPECTION-After the roof,all framing,fire blocking,bracing,and metal connectors are in place;all pipes,chimneys and vents are completed,
and the rough electrical,plumbing or mechanical installations are approved.
3 INSULATION INSPECTION-(as required)After framing inspection and before the lathing inspection,
4. LATHING INSPECTION-(as required)After al lathing and gypsum board,interior and exterior,in construction required to be fire resistive is in place but
before gypsum board joints and fasteners are taped and finished,
5 FINAL INSPECTION-After finish grading and the building is completed and ready for occupancy,
6. In addition to the required inspections specificed above,the Building Official may require other inspections to ascertain compliance with the applicable
building regulations.
ELECTRICAL INSPECTIONS-Required for eV electrical phases of work as declared.. Inspection must be requested by the electrician licensed per HRS 448E,
Reference Article 8."Inspections"of Hawaii County Code Chapter 5.
PLUMBING INSPECTIONS-Required for all plumbing phases of work as declared.Inspection must be requested by the plumber licensed per HRS 448E.
Reference Article 8."Inspections"of Hawaii County Code Chapter 5.
HILO: (808) 961-8331 KONA: (808) 323-4720
HAWAII COUNTY IS AN EQUAL OPPORTUNITY PROVIDER AND EMPLOYER
DOCUMENT 5 - PG 1 OF 1
I EFORE THE t OARD OF APPEALS
COUNTY OF HAINAN
STATE OF AVVA1141
CLAUDIA ROHR, CASE NO,: PL BOA 2025-0C/01 211
Appellant,
vs. CERTIFICATE OF SERVICE
DEPARTMENT OF PUBLIC WORKS,
COUNTY OF HAWAI'll,
Appellee,
and
RICHARD STANDKE, DEBORAH
STANDKE,
Landowners.
CERTIFICATE OF SERVICE
The undersigned hereby certifies that a true and correct copy of the foregoing document
was served upon the parties bellow by electronic mail service on June 20,2025.
1. Claudia Rohr, Appellant CROHR4 @gmai I.com
2. Richard Standke, Landowner richard.standke@grnail.com
Deborah Standke, Landowner fraukepi5@gmai I:coin
3. Sylvia Wan, Deputy Corporation Counsel SylviaA,Wan@hawailcounty,gov
Attorney for the Board of Appeals
Dated: EliQo, Hawaii, June 20,2025.
NEIL AZEVEDO, Acting Director,
Department of Public Works,
County of Hawaiii, Appellee
By: /s/Sinclair Salas,Ferguson
SINCLAIR SALAS-FERGUSON
Deputy Corporation Counsel