My WebLink
|
Help
|
About
|
Sign Out
Home
2025-10-23 Conversations with Complainant
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Past Hearings
>
PL-BOA-2025-000123 Frazier (DPW)
>
2025-10-23 Conversations with Complainant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 7:55:55 AM
Creation date
10/24/2025 7:53:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In closing, my property never had surface water runoff and flooding issues like this before.As I <br /> have continuously expressed, I prefer to work this out with you and make adjustments as I understand <br /> you are in the process of developing and are in a position to make changes. I appreciate it if you could <br /> give me an answer within a month to the following; <br /> 1. My arborist accessing your lot and removing the two trees(northern tree shared on lot line and <br /> smaller tree adjacent to it)and addressing overhanging branches that pose a threat to my <br /> safety and property. If you are in acceptance of the removal of these two trees and you would <br /> like any of the large Ohia for future building needs please outline what length and I will ask <br /> them to make it so;the arborists will need to leave any large logs you desire near the area of <br /> tree felling otherwise they will chip them if you don't want any of the tree material. If you are in <br /> agreement, I will inform you of a timeframe when the arborists can come and figure out days <br /> and times that work for you. <br /> 2. If you agree to having your contractor work on the low spot outlined in figure 1&2 of your <br /> letter and desire to move forward, please outline your contractor's estimate on how best to <br /> mitigate surface water runoff in this area.Once I receive that information, I can determine a <br /> reasonable amount to reimburse you for this endeavor. Please note berms should not rest up <br /> against my fencing as these were not designed to retain materials. <br /> 3. Please outline how you intend to mitigate surface water runoff in both the back and front <br /> portions of my lot along with a timeframe for mitigating actions. <br /> Regards <br /> Nick esour <br /> Owner Huila Farm <br /> USCG Senior Chief Petty Officer fret.) <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.