Laserfiche WebLink
1,1".11°I <br /> KH-01 0. <br /> "KH-02 <br /> ti KH-03 <br /> • <br /> • Connection to Utility Infrastructure 11.1 Beach Manhole(BMH) N 0 50 100 <br /> - Conduit for Fiber Optic Cable Q BMH Excavation Limits Meters <br /> - HDD Borehole Q Project Area Feet <br /> Proposed Test Trench Q 1 rJO 300 <br /> Scale: 1:2,400 <br /> Source:Earl,Maxar,Earthstar Geographics,and the GIS User Community,2025. <br /> Figure 16.Proposed AIS testing strategy for the Kahului Harbor portion of the HIFL project area for <br /> the Maui cable landing site. <br /> Pacific <br /> Page 22 of 41 Legacy <br /> Hso <br /> pY'MCn am l <br />