Laserfiche WebLink
MY-10;7• <br /> MY-09 <br /> MY-08 <br /> MY-07 <br /> l;: MY-06 <br /> MY-05,i <br /> j <br /> MY-04 <br /> ri' <br /> MY-03 <br /> MY-02/ <br /> CJ MY-01 <br /> n ‘,, t .: <br /> • Connection to Utility Infrastructure _ Beach Manhole(BMH) 0 50 100 <br /> )16. <br /> - Conduit for Fiber Optic Cable Q BMH Excavation Limits Meters <br /> - HOD Borehole Q Project Area Feet <br /> Proposed Test Trench Scale: 1:1,800 0 100 200 <br /> Source:Google Earth Imagery,2024. <br /> Figure 23.Proposed AIS testing strategy for the Molokai Yacht Club portion of the HIFL project area <br /> for the Molokai cable landing site. <br /> Page 29 of 41 <br />