Laserfiche WebLink
MH-03 <br /> MH-02 MH-0I <br /> • Connection to Utility Infrastructure <br /> Trenched Conduit for Fiber Optic Cable N 0 25 50 <br /> - HDD Conduit for Fiber Optic Cable 1111111111111111111111111.10 Meters <br /> I Proposed Test Trench <br /> ® Beach Manhole(BMH) Feet <br /> BMH Excavation Limits 0 100 200 <br /> Scale: 1:1,200 <br /> Q Project Area <br /> Source:Google Earth Imagery,2023 <br /> Figure 28.Proposed AIS testing strategy for the Lana`i portion of the HIFL project area for the Lana`i <br /> cable landing site. <br /> Pacific <br /> Page 34 of 41 Lc acr <br />