Laserfiche WebLink
This large fine would create a hardship I am likely to not rebound from and I want <br /> to be treated like everyone else. I became compliant and a SMA permit was <br /> issued. The delayed fines could have and should have been erased and a letter <br /> sent, as has been to for others in the past. I just want fair and equal treatment. <br /> Selective enforcement seems to have possibly happened here, intentional or not. <br /> am also appealing the $10,000 fine on the 3rd notice and the 3rd NOVO <br /> itself. The SHPD stipulation on the SMA permit should have never been put <br /> in place. This same property was approved by SHPD with a county required <br /> archeological study done 2024 by Matt Clark of ASM Affiliates required <br /> because they received community member reports/complaints of graves <br /> on the site. This study confirmed finds of a 1992 Robert Spears findings. <br /> Because of Gina McGure's Cultural Impact Assessment given to the SHPD <br /> via the planning department archaeological monitoring was recommended <br /> even though nothing had physically changed on the property except more <br /> individuals stating there could be graves on the property. Jeff Darrow <br /> decided to take their recommendation. I have been in contact with Susan <br /> Lebo, Johusa Gastilo, Traven Apiki, and Sean Naleimaile at SHPD and <br /> tried to contact Jessica Puff. Most of them do not return phone calls, <br /> but I was successful contacting them (Mostly Susan, Traven and Sean) <br /> on several occasions. I have been trying to get them to remove the <br /> stipulation for monitoring and also to get a definition of ground <br /> disturbance. I have been getting the run around on both of those. <br /> Traven expressed they were mostly concern with excavation, 3' or so to <br /> the subsurface other than that none of them would give me written or <br /> verbal definition of ground disturbance. We have been careful in <br /> removing green waste and previous cut trees recently and have an <br /> approved waste system ready to be installed in an existing ravine. <br />