My WebLink
|
Help
|
About
|
Sign Out
Home
2025-12-04 Letter to Daryn Arai (PL-SAA-2025-000312 & PL-SMM-2025-000079)
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Future Hearings
>
PL-BOA-2026-000130 Kaimu Cove LLC - Mark Wyatt (PD)
>
2025-12-04 Letter to Daryn Arai (PL-SAA-2025-000312 & PL-SMM-2025-000079)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 9:59:03 AM
Creation date
3/12/2026 9:54:31 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
12/4/2025
Related Permits
PL-SAA-2025-000312
Permit Number
PL-SMM-2025-000079
Parcel Number
120180010000
Description
PD Determination Letter & SMA Minor Permit - construction of new SFR and related improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Daryn Arai <br /> Land Use Planning Consultant <br /> December 04, 2025 <br /> Page 2 <br /> Proposed Proiect: <br /> The Applicant is proposing to construct a 2-story dwelling, consisting of 2 bedrooms(one bedroom <br /> on each level), with the 1st level having 384 square feet of living area(1 bedroom & 1 bath) and a <br /> 320-square-foot porch with 2-car garage and the 2nd level having 768 square feet of living area <br /> (1 bedroom, 1 bath & living room with kitchen) and a 320-square-foot lanai. Additional work <br /> includes the construction of a 60' X 35' pickleball court, slab on grade only, no fencing around <br /> perimeter,just a low perimeter landscaped hedge. A 10-foot-wide public access easement will be <br /> located along the property boundary with the State parcel to the north-east. <br /> Access to the proposed dwelling will be directly from the Kalapana-Kapoho Beach Road via a <br /> 15-foot-wide compacted gravel driveway. A 5-foot-tall rock wall and gate system is proposed at <br /> this entry point, having a total length of approximately 55 feet. <br /> County water is available to support the proposed single-family dwelling via an existing water <br /> meter located along Kalapana-Kapoho Beach Road. Wastewater will be accommodated by an <br /> Individual Wastewater System (IWS) to be designed in accordance with State Department of <br /> Health rules and regulations. <br /> No staging of material will occur within the shoreline setback area, and no other work is proposed <br /> at this time. <br /> Special Management Area Determination: <br /> According to Hawaii Revised Statutes (HRS) Chapter 205A-44 and Planning Commission (PC) <br /> Rule No. 94(i)(1)(A)&(E), "development"includes "Placement or erection ofany solid material <br /> or any gaseous, liquid, solid, or thermal waste"; and "Construction, reconstrcution, or alteration <br /> ofthe size ofany structure. "Therefore,the proposed construction of a new single-family residence <br /> and related improvements is considered to be development and will require a review against the <br /> Special Management Area rules and regulations. <br /> We find that the proposed project is not exempt from the definition of"development"; however, <br /> the project will not have a cumulative impact or a significant adverse environmental or ecological <br /> effect on the SMA. Therefore, pursuant to PC Rule Section 9-10(e), Special Management Area <br /> Minor Permit No.PL-SMM-2025-000079 is hereby issued for the project as described above. <br /> It is the applicant's responsibility to read and comply with the conditions listed in the enclosed <br /> permit. <br /> While further review of the proposed project against the SMA rules and regulations will not be <br /> required, all other applicable Zoning Code and Building Code requirements must be satisfied. <br /> Additionally, any future development or activities not included in this approval will require further <br /> review and approval as provided under Chapter 205A, HRS and Rule 9, Planning Commission <br /> Rules of Practice and Procedure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.