My WebLink
|
Help
|
About
|
Sign Out
Home
2025-08-26 PL-BOA-2025-000124 COMPLETE RECORD ON APPEAL (M. KELLBERG VS. PLANNING DIRECTOR)
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
PL-BOA-2025-000124 Mark Kellberg (PD)
>
2025-08-26 PL-BOA-2025-000124 COMPLETE RECORD ON APPEAL (M. KELLBERG VS. PLANNING DIRECTOR)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 1:12:27 PM
Creation date
8/26/2025 1:11:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Section 23-84. Water supply. A subdivision to be laid out after December <br /> 21, 1966 shall be provided with water as follows: <br /> (1) A water system meeting the minimum requirements of the County <br /> department of water supply; and <br /> (2)Water mains and fire hydrants installed to and within the subdivision in <br /> accordance with the rules and regulations of the department of water supply, <br /> adopted in conformity with article VIII of the Charter. (1983 CC, c 23, art <br /> 6, sec 23-84.) <br /> 6. Section 23-85. Sewage disposal systems. (b) In subdivisions where sewer <br /> connections cannot be made to an existing sewer system under the requirements of <br /> this chapter,the subdivider shall meet the minimum requirements of the State health <br /> department relating to sewage disposal. (1983 CC, c 23, art 6, sec 23-85.) <br /> 7. Section 23-95. Right-of-way improvement. The subdivider shall be <br /> required to improve the entire street right-of-way.The improvements shall conform <br /> to the standard specifications on file with the department of public works. <br /> 8. Section 25-2-2. Issuance of permits or licenses in conformance with <br /> chapter. All departments, officials, and public employees authorized to issue <br /> permits or licenses shall conform to the provisions of this chapter and no permit or <br /> license for any use, building, or other purpose shall be issued where the license or <br /> permit would be in conflict with the provisions of this chapter. Any permit or <br /> license, if issued in conflict with the provisions of this chapter, shall be void. <br /> 9. Section 25-2-11. Waiver of requirements in consolidation and <br /> resubdivision. If the director finds that the public welfare and safety will not be <br /> violated, the director may waive portions or all of the requirements and standards <br /> of this chapter for consolidation and resubdivision action resulting in the creation <br /> of the same or less number of lots than that which existed prior to the consolidation <br /> or resubdivision action; provided, that prior to the granting of any waiver, the <br /> director shall confer with the director of public works and the manager-chief <br /> engineer of the department of water supply and other applicable government <br /> agencies. <br /> 10. Section 25-2-30.Violations.Any approval or permit issued pursuant to the <br /> provisions of this chapter shall comply with all applicable requirements of this <br /> chapter. Failure to comply with any provision of this chapter, any rule adopted <br /> pursuant to this chapter,or with conditions imposed as part of any approval,permit, <br /> or variance from the provisions of this chapter, shall constitute a violation of this <br /> chapter. <br /> 11. Section 25-2-31. Criminal prosecution. (a) Any person whether as <br /> principal, agent, employee, or otherwise, violating or causing or permitting the <br /> violation of any of the provisions of this chapter, shall be guilty of a violation. <br /> 7 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.