Laserfiche WebLink
Proposed Finding of Fact Objections <br /> c. Planning Director failed to answer for the County, which provides the <br /> four questions relating to the review Planning Director with authority and <br /> and interpretation of a development jurisdiction to answer the Requests; <br /> agreement. <br /> c. The Planning Director erred by <br /> d. Planning Director erred by not refusing to issue declaratory rulings <br /> interpreting Ord. 96- 7, standing on the seven Requests because he <br /> alone, because no dedication incorrectly determined that they <br /> requirement is contained within sought to review or affirm the validity <br /> Ord. 96-7; of Variance No. 10-027 (the <br /> "Variance"); <br /> e. Planning Director erred by <br /> seemingly qualifying the 2010 d. The Planning Director erred by <br /> dedication of the Mauka Halekii issuing several declaratory rulings sua <br /> Extension and corresponding sponte and not in response to any of <br /> satisfaction of the Ordinances' the Requests submitted by Oceanside, <br /> conditions related to the roadway; which he lacks authority to do; <br /> and <br /> e. The Planning Director erred by ruling <br /> f. Planning Director erred by ruling that Ordinance No. 96-7 requires the <br /> that the Makai Haleki i Extension dedication of three roadways because <br /> and Connector Road have not been no such requirement is contained <br /> constructed as required under the within Ordinance No. 96-7; <br /> Ordinances because (1) both <br /> roadways were constructed pursuant £ The Planning Director erred by <br /> to plans approved by the seemingly qualifying the 2010 <br /> Department of Public Works of the dedication of the Mauka Haleki`i <br /> County of Hawaii ("DPW") and are Extension and corresponding <br /> covered by the Variance, and(2) the satisfaction of the Ordinances' <br /> Director lacks authority to rule upon conditions related to the roadway; and <br /> the sufficiency of the roadway for <br /> dedication. g. The Planning Director erred by ruling <br /> that the Makai Haleki`i Extension and <br /> g. Planning Director erred by issuing Connector Road have not been <br /> several declaratory rulings constructed as required under the <br /> Appellant claims are sua sponte Ordinances because (1) both roadways <br /> rulings; were constructed pursuant to plans <br /> approved by DPW and are covered by <br /> the Variance, and (2) the Planning <br /> Director lacks authority to rule upon <br /> the sufficiency of the roadways for <br /> dedication. <br />