Laserfiche WebLink
Amira Soliman <br />c/o Bumper Productions, LLC <br />March 25, 2026 <br />Page 2 <br />Proposed Project: <br />The applicant is proposing to conduct the following uses: <br />• Conducting a one -day video shoot featuring two cast members speaking on the <br />beach and brief filmed interactions at the top of the Papa`ikou Camp property. No <br />structures will be built and no permanent lighting or installations will be used. <br />• Designate parking for production vehicles including movie trailers, cube trucks, <br />cargo vans, and sprinter vans within approved areas on private property. Parking <br />will be organized to avoid roadway obstruction, maintain emergency access, and <br />minimize impact to the surrounding neighborhood. <br />• Establishing logistical support areas such as mobile basecamps and catering tents <br />for cast and crew. <br />• Utilizing portable video cameras, audio equipment, and lighting only as needed for <br />filming. No fixed equipment or ground disturbance will occur. <br />Special Management Area Determination: <br />According to Hawaii Revised Statutes (HRS) Chapter 205A-44 and Planning <br />Commission (PC) Rule No. 9-4(i)(1)(A), "development" includes "Placement or erection <br />of any solid material or any gaseous, liquid, solid, or thermal waste". Therefore, the <br />proposed construction of filming support tents, etc. are considered to be development <br />and will require a review of the Special Management Area rules and regulations. <br />We find that the proposed project is not exempt from the definition of "development;" <br />however, the project will not have a cumulative impact or a significant adverse <br />environmental or ecological effect on the SMA. Therefore, pursuant to PC Rule Section <br />9-10(e), Special Management Area Minor Permit No. PL-SMM-2026-000085 is hereby <br />issued for the project as described above. It is the applicant's responsibility to read and <br />comply with the conditions listed in the enclosed permit. <br />While further review of the proposed project against the Special Management Area rules <br />and regulations will not be required, all other applicable Zoning Code and Building Code <br />requirements must be satisfied. Additionally, any future development or activities not <br />included in this approval shall require further review and approval as provided under <br />Chapter 205A, HRS and Rule 9, Planning Commission Rules of Practice and Procedure. <br />APPELLANT EXHIBIT 1, pg. 2 of 9 <br />