My WebLink
|
Help
|
About
|
Sign Out
Home
2026-5-27 ROHR EXHIBIT 6_v1.pdf
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Future Hearings
>
PL-BOA-2026-000133 Claudia Rohr (PD)
>
2026-5-27 ROHR EXHIBIT 6_v1.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2026 10:05:57 AM
Creation date
6/9/2026 9:55:26 AM
Metadata
Fields
Template:
Plan Doc Template
Description
2026-5-27 ROHR EXHIBIT 6_v1.pdf
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BRIAN CLARK LIVING TRUST <br />SPECIAL AREA MANAGEMENT ASSESSMENT APPLICATION, <br />OCTOBER 2023 <br />ADDITIONAL INFORMATION PROVIDED (FOR DETERMINATION OF MINOR, MAJOR or EXEMPT STATUS) <br />1. Description of the proposed development... <br />Applicant Brian Clark Living Trust intends to perform a four -lot subdivision of TMK 2-7-004-118- <br />0000 at Papaikou, South Hilo, Hawaii Island. The parcel is approximately 16.9393 acres in size <br />and has mixed zoning with approximately 11.4363 acres in County Zone Ag-3a and the balance <br />5.5030 acres in County Zone Ag-20a. The Lots will range from 3.053 acres to approximately <br />7.236. <br />No grading, grubbing, leveling, or soil movement of the premises is planned, the subdivision <br />action under this SMA Assessment being benign to land movement and only entails surveyed lot <br />line boundaries and description of easements for access and utility purposes to the four <br />proposed Lots. Groundwork grading and grubbing being deferred until the future Lot(s) are <br />developed. These future developments for construction of a structure or excavation of sub- <br />surface utilities are expected to fall under a separate SMA Major application at the time those <br />actions are contemplated. <br />At this time, Trustee Brian Clark, intends to keep Lots 1 and 2 in possession and may consider <br />selling Lots 3 and 4 in the future. <br />2. Statement of Objectives of the proposed project... <br />The Project is to utilize the existing zoning of the parcel to perform a four -lot subdivision on the <br />16.9393 parcel by way of Rule 9 exemption to Planning Commission rules and practices to <br />perform the subdivision as an SMA-Minor or exempt action. The cost of the subdivision survey <br />and easement creation is not expected to exceed $100,000, well under the $500,000 trigger for <br />a SMA-Major action. <br />
The URL can be used to link to this page
Your browser does not support the video tag.