2023-02-10 I'o Processing Company - BOA General Petition for Appeal 4870-8058-9647 v.4
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Future Hearings
>
PL-BOA-2023-000065 I'O PROCESSING (DPW)
>
2023-02-10 I'o Processing Company - BOA General Petition for Appeal 4870-8058-9647 v.4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2023 9:25:14 AM
Creation date
2/13/2023 9:25:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to the other agricultural structures and uses. <br /> IV. PROCEDURAL HISTORY- THE DEPARTMENT OF PUBLIC WORKS HAS <br /> ISSUED AN IMPROPER DENIAL. <br /> Appellant has made every effort to work with the County to process all necessary permits <br /> for the Processing Facility. Appellant's intent has always been to do everything properly with <br /> the Processing Facility, in order to build a thriving, long-term business. <br /> In February 2022, Appellant met with the County of Hawaii Planning Department <br /> ("Planning Department") and DPW, Building and Engineering Divisions. At that time, <br /> Appellant provided DPW with the Processing Facility's construction plans. In response, DPW <br /> Engineering Division confirmed that no building permits were required for the Processing <br /> Facility and recommended that Appellant confirm with the Planning Department that the <br /> structure met the requirements of the Zoning Code for the agricultural use. <br /> The Planning Department confirmed that modular structures were a permitted use in the <br /> Agricultural zoning and that no building permit was required for the Processing Facility. The <br /> Planning Department recommended that Appellant check with DPW Building Division on the <br /> filing of a Declaration of Agricultural Building Compliance for the Processing Facility,per HRS <br /> § 46-88. <br /> DPW Building Division confirmed that the Processing Facility did not require building <br /> permits and instructed Appellant to file the Declarations of Compliance. <br /> On March 17, 2022, Appellant applied for an electrical permit for the Processing Facility, <br /> in reliance on the requirement to do so per its conversations with DPW and the Planning <br /> Department. In connection with the electrical permit,Appellant submitted construction plans <br /> that clearly identified the Processing Facility. If DPW believed then that building permits were <br /> required for the Processing Facility,then DPW should have at that time rejected the electrical <br /> permit application and required the processing of building permits. <br /> On March 24, 2022, the electrical permit was issued (PW.B2022-001249). See Ex. 9. <br /> On July 27, 2022,the electrical rough-in work passed inspection, and was completed. On <br /> August 8, 2022,the electrical underground work passed inspection, and was installed. <br /> On October 28, 2022, Appellant was issued Building Permit No. PW-B2022-003346 for <br /> the Agricultural Office Building. Ex. 5. <br /> On December 29, 2022, the final and third inspection of the electrical permit was rejected <br /> 4 <br /> 4870-8058-9647.4.071717-00001 <br />