My WebLink
|
Help
|
About
|
Sign Out
Home
2024-09-25 Appellant's Request for Subpoena Duces Tecum, Exhibit 1-2
PublicDocuments
>
Planning Department
>
Board of Appeals
>
Pending Petitions for Next Hearing Date
>
zCases for Future Hearings
>
PL-BOA-2023-000065 I'O PROCESSING (DPW)
>
2024-09-25 Appellant's Request for Subpoena Duces Tecum, Exhibit 1-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 9:57:21 AM
Creation date
9/26/2024 9:53:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In February 2022, before I`o Processing purchased the Facility, Ms. Nichole Kanda2 met <br /> with staff of DPW, Building and Engineering Divisions. At that time, Ms. Kanda provided DPW <br /> with the Processing Facility's construction plans. DPW Building Division verbally confirmed <br /> that the Processing Facility did not require building permits and would be entitled to an <br /> agricultural exemption under HRS § 46-88, but would need an electrical permit to connect to <br /> County power lines. <br /> Based on DPW's pre-approval, I`o Processing proceeded with getting final approvals for <br /> various aspects of the project over the next ten months without issue: <br /> • On March 17, 2022, I`o Processing applied for an electrical permit for the Facility, <br /> per DPW's recommendation. In connection with the electrical permit, I`o Processing <br /> submitted design plans that clearly identified the Facility. <br /> • On July 27, 2022, the electrical rough-in work passed inspection, including a site visit <br /> to the Facility. <br /> • On August 8, 2022, the electrical underground work passed another inspection, with <br /> another site visit, and was installed. <br /> • On August 24, 2022, DPW accepted declarations of compliance for related compost <br /> structures. <br /> • On October 28, 2022, I`o Processing was issued Building Permit No. PW-B2022- <br /> 003346 for a related Agricultural Office Building. <br /> • On September 21, 2022, I`o Processing filed, and DPW accepted, a declaration of <br /> compliance for a related Agricultural Shed. <br /> Through all these repeat interactions, involving review of plans, site visits, and multiple <br /> conversations, DPW never raised any issue with the Facility. Accordingly, at every step I`o <br /> Processing continued to proceed based on the assurances previously provided by DPW in <br /> February 2022. <br /> I`o Processing's problems with DPW began abruptly on December 29, 2022, when Mr. <br /> 2 Ms. Kanda is I`o Processing's principal. <br /> 5 <br /> 4871-5206-8494.1.071717-00001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.