only if there was "compliance with relevant building codes" and if the Facility was a <br /> "County pre-approved structure." <br /> • March 1, 2023: DPW, through counsel, offered a"path forward"to satisfy the pre- <br /> approval and exemption requirements it identified on February 10, including the <br /> following: <br /> o "Submit the building plans for the 4 pre-fabricated modules." <br /> o "The design professional would also need to provide the plans for the <br /> foundation and calculations for wind and seismic loads." <br /> o "The applicable code provision is: 2018 IBC, Section 3113 Relocatable <br /> Buildings." <br /> o "Arrange for the inspection of the foundation and the attachment of the <br /> modules to the foundation, and certification that the modules are the modules <br /> identified in the plans." <br /> • November 14, 2023: After I`o Processing worked for months in good faith to meet <br /> the March 1 criteria(which were focused on structural plans), DPW abruptly added <br /> new, additional criteria for pre-approval, including that I`o Processing would need <br /> "electrical and plumbing permits" in order to receive County preapproval. <br /> • November 27, 2023: DPW induced I`o Processing to stay its appeal to the Board <br /> (which at the time was scheduled for hearing on December 2023), by offering yet <br /> another set of criterion for pre-approval. This time, DPW instructed I`o Processing to <br /> "submit plans stamped by an architect and by a structural engineer, as appropriate, for <br /> review by the Building Division," while informing I`o Processing that DPW will <br /> "honor"the currently issued electrical permit but"may"require a plumbing permit. <br /> Notably, this criteria recognized that no new electrical permit was required. In verbal <br /> conversations, Mr. Steve Pause, on behalf of DPW, assured I`o Processing that he did <br /> not believe a plumbing permit was required because there was no underground piping <br /> and the property utilized an existing, fully-permitted connection to County water. <br /> • June 10, 2024: In reliance on DPW's latest instructions, I`o Processing submitted <br /> "plans stamped by an architect and by a structural engineer" as well as detailed wind <br /> and seismic calculations, exactly as DPW had instructed. In response, DPW made <br /> new demands, which were not in the terms of the November 27 offer, including a <br /> 7 <br /> 4871-5206-8494.1.071717-00001 <br />