Laserfiche WebLink
(January 14, 2011 meeting, page 9, February 11, 2011 meeting, and March 23, <br />2011 meeting) <br />2) Develop and implement a county-wide technology management plan. <br />(November 17, 2010 meeting) <br />3) Implement the use of Laserfiche for all departments when and where practical. <br />(Operation, Budget and Consolidation subcommittee report on October 8, 2010) <br />3.Contracting Process <br />1) To facilitate long term planning and budgeting require each department have an <br />To facilitate long term planning and budgeting require each department have an <br />annual planning session to identify their needs for outside contracting services over <br />annual planning session to identify their needs for outside contracting services over <br />annual planning session to identify their needs for outside contracting services over <br />the next two to five years. This will allow each department to commence with <br />the next two to five years. This will allow each department to commence with the next two to five years. This will allow each department to commence with <br />drafting bid documents. (January 14, 2011 meeting, page 9, February 11, 2011 <br />drafting bid documents. (January 14, 2011 meeting, page 9, Febrdrafting bid documents. (January 14, 2011 meeting, page 9, Febr <br />uary 11, 2011 <br />meeting, and March 23, 2011 meeting) <br />2) Review internal processes that are currently in use to reduce change orders, <br />Review internal processes that are currently in use to reduce change orders, Review internal processes that are currently in use to reduce change orders, <br />renewals and processing in a timely manner. Utilize technology such as electronic <br />renewals and processing in a timely manner. Utilize technology such as electronic renewals and processing in a timely manner. Utilize technology such as electronic <br />signatures in each department, electronic distribution, and online approvals to <br />signatures in each department, electronic distribution, and online approvals to signatures in each department, electronic distribution, and online approvals to <br />increase efficiency. (January 14, 2011 meeting, page 9, February 11, 2011 <br />increase efficiency. (January 14, 2011 meeting, page 9, February 11, 2011 increase efficiency. (January 14, 2011 meeting, page 9, February 11, 2011 <br />meeting, and March 23, 2011 meeting) <br />meeting, and March 23, 2011 meeting) <br />4.Budget and Code Review Process <br />1) Review and update the entire County Code at least every ten years, rather than <br />Review and update the entire County Code at least every ten years, rather than Review and update the entire County Code at least every ten years, rather than <br />making changes on a piecemeal basis or not at all). (November 17, 2010 meeting <br />making changes on a piecemeal basis or not at all). (November 17, 2010 meeting making changes on a piecemeal basis or not at all). (November 17, 2010 meeting <br />and Comm. 2010-105; December 10, 2010 Minutes, page 39) <br />105; December 10, 2010 Minutes, page 105; December 10, 2010 Minutes, page 39)39) <br />2010 <br />- <br />2) Develop three different budget scenarios for each department as part of the annual <br />Develop three different budget scenarios for each department as part of the annual Develop three different budget scenarios for each department as part of the annual <br />budgeting process. One version would be based on the current budget allocation, <br />budgeting process. One version would be based on the current budget allocation, budgeting process. One version would be based on the current budget allocation, <br />another version would reflect a five percent increase in funding, and the third would <br />another version would reflect a five percent increase in funding, and the third would another version would reflect a five percent increase in funding, and the third would <br />be based on a 10% decrease from the current budget. (January 14, 2011 meeting <br />be based on a 10% decrease from the current budget. (January 14, 2011 meeting be based on a 10% decrease from the current budget. (January 14, 2011 meeting <br />Hoffman) <br />)) <br />HoffmanHoffman <br />3) Review the county’s operating budget semi-annually or quarterly to make needed <br />Review the county’s operaReview the county’s operating budget semiting budget semiannually or quarterly to make needed <br />- <br />adjustments. (January 14, 2011 meeting Hoffman) <br />adjustments. (January 14, 2011 meeting adjustments. (January 14, 2011 meeting Hoffman <br />5.Boards and Commissions <br /> and Commissions and Commissions <br />BoardsBoards <br />1) Evaluate the frequency of Board and Commission meetings to reduce the number <br />Evaluate the frequency of Board and Commission meetings to reduce the number Evaluate the frequency of Board and Commission meetings to reduce the number <br />of meetings to the minimum required. In addition, eliminate inactive boards and <br />of meetings to the minimum required. In addition, eliminate inactive boards and of meetings to the minimum required. In addition, eliminate inactive boards and <br />commissions and review existing boards and commissions on a regular basis for <br />commissions and review existing boards and commissions on a regular basis for commissions and review existing boards and commissions on a regular basis for <br />potential consolidations to limit their number. Reducing the number of boards and <br />potential consolidations to limit their number. Reducing the number of boards and potential consolidations to limit their number. Reducing the number of boards and <br />commissions and/or the frequency of meetings would result in staff time cost <br />commissions and/or the frequency of meetings would result in stacommissions and/or the frequency of meetings would result in sta <br />savings. (Operation, Budget and Consolidation subcommittee report on October 8, <br />(Operation, Budget and Consolidation subcommittee report on October 8, (Operation, Budget and Consolidation subcommittee report on October 8, <br />2010 and February 25 meeting) <br />6.Miscellaneous <br />1) Continue to update and enforce the county’s internet use policy for all employees. <br />(December 10, 2010 meeting, Comm.2010-144; page 27) <br />2) Solicit employee suggestions and recommendations on a regular basis including <br />cost saving suggestions. (January 14, 2011 meeting) <br />9 <br /> <br />